Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission assurance reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Instantiating R&M in the Digital Engineering Eco System

Provide an overview of OSMA related activities to help instantiate both Safety & Mission Assurance (SMA) and Reliability & Maintainability (R&M) activities as part of a Digital Engineering Eco System.

Anthony John DiVenti Jr.↗

Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

Kauffmann, Paul J.↗

Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned

"Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the ~ physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.

Ott, Melanie N.↗

A Tool for Verification and Validation of Neural Network Based Adaptive Controllers for High Assurance Systems

High reliability of mission- and safety-critical software systems has been identified by NASA as a high-priority technology challenge. We present an approach for the performance analysis of a neural network (NN) in an advanced adaptive control system. This problem is important in the context of safety-critical applications that require certification, such as flight software in aircraft. We have developed a tool to measure the performance of the NN during operation by calculating a confidence interval (error bar) around the NN's output. Our tool can be used during pre-deployment verification as well as monitoring the network performance during operation. The tool has been implemented in Simulink and simulation results on a F-15 aircraft are presented.

Gupta, Pramod↗

Reliability and Qualification of Hardware to Enhance the Mission Assurance of JPL/NASA Projects

Packaging Qualification and Verification (PQV) and life testing of advanced electronic packaging, mechanical assemblies (motors/actuators), and interconnect technologies (flip-chip), platinum temperature thermometer attachment processes, and various other types of hardware for Mars Exploration Rover (MER)/Mars Science Laboratory (MSL), and JUNO flight projects was performed to enhance the mission assurance. The qualification of hardware under extreme cold to hot temperatures was performed with reference to various project requirements. The flight like packages, assemblies, test coupons, and subassemblies were selected for the study to survive three times the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations, and mission phases. Qualification/life testing was performed by subjecting flight-like qualification hardware to the environmental temperature extremes and assessing any structural failures, mechanical failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experimental flight qualification test results will be described in this presentation.

PRTs↗

Mass and Reliability System (MaRS)

The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including: operation hours, random/nonrandom failures, software/hardware failures, quantity, orbital replaceable units (ORU), date of placement, unit weight, frequency of part, etc. The motivation for creating such a database will be the development of a mass/reliability parametric model to estimate mass required for replacement parts. Once complete, engineers working on future space flight missions will have access a mean time to failures and on parts along with their mass, this will be used to make proper decisions for long duration space flight missions

Barnes, Sarah↗

Recommendations on the Use of Commercial-Off-The-Shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) Parts for NASA Missions - Phase II

This assessment had two Phases. Phase I captured NASA Centers’ current practices for commercial-off-the-shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) parts 1 used in spaceflight systems and ground support equipment (available at https://ntrs.nasa.gov/citations/20205011579) [ref. 1]. The Phase II report provides guidance for selecting and using COTS parts in NASA missions. The approaches proposed in this report differ from current agency practices. This top-level executive summary touches on these new approaches for using COTS parts but does not provide the detailed information that is critical in understanding the rationale behind these new approaches. Readers will need to read the entire report to gain full understanding and effectively use the recommendations herein. NASA’s historical approach to selecting and applying parts has been to define certain parts, primarily specific classes of military specification (MIL-SPEC) parts, as “standard”, leaving all others, including COTS parts, as nonstandard. Standard parts typically are used without further testing (“use-as-is”). Nonstandard parts are subjected to initial screening and subsequent lot acceptance testing of representative samples from each procured lot per MIL-SPEC or similar requirements. Decades later, top-tier commercial part manufacturers have evolved significant manufacturing, statistical control, and technological improvements that can now provide parts as reliable or more reliable than MIL-SPEC parts, when used within their datasheet limits. Concurrently, the space science and exploration community’s needs demand technological advances unavailable with MIL-SPEC parts. This ongoing change necessitates using COTS parts for space missions. Properly selected COTS parts in appropriate applications can offer performance and supply availability advantages compared to MIL-SPEC parts. Their utility and demonstrated reliability result from large volumes and automated production and testing processes. However, careful review and a thorough understanding of their specifications (i.e., datasheet limitations) is needed, and verifying that manufacturer specifications and reliability meet space hardware application needs are necessary. This report recommends MIL-SPEC screening and non-radiation-related lot acceptance testing be reduced or eliminated in cases where evidence of sufficient quality and reliability exists for COTS parts. The extent of NASA's insight into COTS manufacturers and the amount and nature of the needed evidence will differ by mission and will likely be driven by a mission's resources and associated risk posture. To facilitate this goal, two new terminologies have been defined and described: “Industry Leading Parts Manufacturer (ILPM)” and “Established COTS parts.” An ILPM is a COTS manufacturer that produces high quality and reliable parts. Some parts produced by ILPMs, defined as Established COTS parts, do not need any additional MIL-SPEC or NASA screening and lot acceptance testing to be used in space applications. This report provides guidance for selecting, procuring, and applying COTS parts and for performing part-, board-, and system-level COTS parts verification. The recommendation to select Established COTS parts from ILPMs will assure those COTS parts will have comparable quality to corresponding MIL-SPEC parts. Selecting, applying, and verifying Established COTS parts from ILPMs requires a holistic team approach, engaging parts engineers, circuit designers, quality, reliability, and systems engineers, procurement specialists, radiation specialists, avionics leads, and program/project managers. A mission-specific approach tailored to a project’s Mission, Environment, Applications and Lifetime (MEAL) [ref. 2] requirements should be developed and approved by program/project managers. Any associated risks should be clearly identified, quantified, mitigated, and/or accepted. Different approaches are recommended according to program/project Risk Classes A, B, C, and D [ref. 3] and human-rated missions [ref. 4]: 1. Recommend Classes A and B and human-rated missions consider a “MIL-SPEC parts- based design” approach. ”MIL-SPEC parts-based design” approach is one in which most parts are MIL-SPEC parts and Established COTS parts from ILPMs are used only when an equivalent MIL-SPEC part does not meet functional or size, weight, and power (SWaP) or performance requirements, or is not available. 2. Recommend Classes D and Sub-D missions consider a “System of COTS” approach. “System of COTS” approach is one which most parts are Established COTS parts from ILPMs. 3. Recommend Class C missions determine which approach is the best for their projects; that is, use either a “MIL-SPEC parts-based design” approach, “System of COTS” approach, or a combined approach utilizing elements of both. This report intends to provide guidance in using COTS parts for NASA missions with risk classifications of A through D and human-rated missions; but it does not address the costs of using COTS parts. Costs of using COTS parts in different NASA mission classes can vary significantly even if the same parts are used in different risk postures, due to differing verification levels needed. The guidance does not distinguish between critical or non-critical systems, and a given project will need to apply the appropriate guidance based on their risk posture. The intended audience of this report are NASA personnel and commercial practitioners who support NASA’s spaceflight missions, including spaceflight program or project managers, parts engineers, parts manufacturers, radiation engineers, avionics engineers, system engineers, circuit design engineers, reliability engineers, safety and mission assurance (SMA) personnel, and parts procurement specialists. The NEPP Program will perform a pathfinder study to explore implementing the guidance in this NESC report. An ILPM verification process is not the same as conventional vendor qualification processes performed according to military standards and specifications. This NESC report intends to provide guidance in utilizing available parts data from ILPM manufacturers for parts assurance assessments needed for NASA missions. The report also captured the current practices from DoD and Federal Aviation Administration (FAA) in Section 10. Note each DoD and FAA report was provided by the corresponding agencies regarding their practices, which are independent from the NESC recommendations in the report.

Commercial-Off-The-Shelf↗

An Ultra Reliability for Project for NASA

NASA has embarked on a new program designed to improve the reliability of NASA systems. In this context, the goal for ultra reliability is to ultimately improve the systems by an order of magnitude. The approach outlined in this presentation involves five steps: 1. Divide NASA systems into seven sectors; 2. Establish sector champions and representatives from each NASA center; 3. Develop a challenge list for each sector using a team of NASA experts in each area with the sector champion facilitating the effort; 4. Develop mitigation strategies for each of the sectors' challenge lists and rank their importance by holding a workshop with area experts from government (NASA and non-NASA), universities and industry; 5. Develop a set of tasks for each sector in order of importance for improving the reliability of NASA systems. Several NASA-wide workshops have been held, identifying issues for reliability improvement and providing mitigation strategies for these issues.

ultra-reliability↗

Johnson Space Center's Risk and Reliability Analysis Group 2008 Annual Report

The Johnson Space Center (JSC) Safety & Mission Assurance (S&MA) Directorate s Risk and Reliability Analysis Group provides both mathematical and engineering analysis expertise in the areas of Probabilistic Risk Assessment (PRA), Reliability and Maintainability (R&M) analysis, and data collection and analysis. The fundamental goal of this group is to provide National Aeronautics and Space Administration (NASA) decisionmakers with the necessary information to make informed decisions when evaluating personnel, flight hardware, and public safety concerns associated with current operating systems as well as with any future systems. The Analysis Group includes a staff of statistical and reliability experts with valuable backgrounds in the statistical, reliability, and engineering fields. This group includes JSC S&MA Analysis Branch personnel as well as S&MA support services contractors, such as Science Applications International Corporation (SAIC) and SoHaR. The Analysis Group s experience base includes nuclear power (both commercial and navy), manufacturing, Department of Defense, chemical, and shipping industries, as well as significant aerospace experience specifically in the Shuttle, International Space Station (ISS), and Constellation Programs. The Analysis Group partners with project and program offices, other NASA centers, NASA contractors, and universities to provide additional resources or information to the group when performing various analysis tasks. The JSC S&MA Analysis Group is recognized as a leader in risk and reliability analysis within the NASA community. Therefore, the Analysis Group is in high demand to help the Space Shuttle Program (SSP) continue to fly safely, assist in designing the next generation spacecraft for the Constellation Program (CxP), and promote advanced analytical techniques. The Analysis Section s tasks include teaching classes and instituting personnel qualification processes to enhance the professional abilities of our analysts as well as performing major probabilistic assessments used to support flight rationale and help establish program requirements. During 2008, the Analysis Group performed more than 70 assessments. Although all these assessments were important, some were instrumental in the decisionmaking processes for the Shuttle and Constellation Programs. Two of the more significant tasks were the Space Transportation System (STS)-122 Low Level Cutoff PRA for the SSP and the Orion Pad Abort One (PA-1) PRA for the CxP. These two activities, along with the numerous other tasks the Analysis Group performed in 2008, are summarized in this report. This report also highlights several ongoing and upcoming efforts to provide crucial statistical and probabilistic assessments, such as the Extravehicular Activity (EVA) PRA for the Hubble Space Telescope service mission and the first fully integrated PRAs for the CxP's Lunar Sortie and ISS missions.

Valentine, Mark↗

Rendezvous strategy impacts on CTV avionics design, system reliability requirements, and available collision avoidance maneuvers

Rockwell International is conducting an ongoing program to develop avionics architectures that provide high intrinsic value while meeting all mission objectives. Studies are being conducted to determine alternative configurations that have low life-cycle cost and minimum development risk, and that minimize launch delays while providing the reliability level to assure a successful mission. This effort is based on four decades of providing ballistic missile avionics to the United States Air Force and has focused on the requirements of the NASA Cargo Transfer Vehicle (CTV) program in 1991. During the development of architectural concepts it became apparent that rendezvous strategy issues have an impact on the architecture of the avionics system. This is in addition to the expected impact on propulsion and electrical power duration, flight profiles, and trajectory during approach.

Donovan, William J.↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. In order to determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules and operational requirements are developed and then finalized.

DeMott, Diana↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. To determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators, and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules, and operational requirements are developed and then finalized.

DeMott, Diana L.↗

Reliability Practice at NASA Goddard Space Flight Center

This paper describes in brief the Reliability and Maintainability (R&M) Programs performed directly by the reliability branch at Goddard Space Flight Center (GSFC). The mission assurance requirements flow down is explained. GSFC practices for PRA, reliability prediction/fault tree analysis/reliability block diagram, FMEA, part stress and derating analysis, worst case analysis, trend analysis, limit life items are presented. Lessons learned are summarized and recommendations on improvement are identified.

Pruessner, Paula S.↗

Identifying Where Mission Assurance Can Benefit from Model Based Systems Engineering

Model Based Systems Engineering (MBSE) is being introduced and used to support many aspects of the engineering of complex systems. Our focus is on space systems, with a particular interest in Mission Assurance of those systems. We seek to identify where Mission Assurance can potentially benefit when a space system is developed using an MBSE approach. To do so we consider how MBSE can help provide the evidence that Mission Assurance needs, using the recently developed NASA Reliability and Maintainability Objective Hierarchy as the exposition of those needs. We illustrate this MBSE’s potential contributions using examples drawn from our prior survey of the MBSE literature addressing space mission assurance concerns. The overall conclusion we draw from this is that there are numerous ways in which MBSE may, and in some cases already does, support Mission Assurance.

Feather, Martin S.↗

Safety and Mission Assurance: A NASA Perspective

Safety and Mission Assurance (S&MA) consists of the safety, reliability, maintainability, software assurance and quality disciplines, which are applied to reduce the probability of mishaps and ensure mission success. NASA uses a risk management process which requires various organizations to identify, analyze and mitigate/control risks associated with operations and decision making processes.

Higginbotham, Scott Alan↗

Saturn 5 Launch Vehicle Flight Evaluation Report, AS-510, Apollo 15 Mission

A postflight analysis of the Apollo 15 flight is presented. The performance of the launch vehicle, spacecraft, and lunar roving vehicle are discussed. The objective of the evaluation is to acquire, reduce, analyze, and report on flight data to the extent required to assure future mission success and vehicle reliability. Actual flight problems are identified, their causes are determined, and recommendations are made for corrective actions. Summaries of launch operations and spacecraft performance are included. Significant events for all phases of the flight are tabulated.

Source record↗