Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Human Mars Mission Performance Crew Taxi Profile

This timeline was generated on the Integrated Mission Program (IMP). All burn events over 2 seconds are finite with IMP solving a two point boundary value setup for begin burn time, burn time and control angles. Perigee and apogee shown above are mean orbital values. Significant events are listed. Each finite thrust event has two lines. The first is the beginning time showing the initial conditions, thrust and ISP used. The second has the end burn conditions and the delta v and time of burn. This case is an abort from the 750 x 750 phasing abort, using the taxi's main engines. An abort using the Reaction Control System (RCS) was also investigated but required a large increase in RCS propellant and was abandoned.

Duaro, Vince A.↗

ASTRO-2 Spacelab Instrument Pointing System mission performance

This paper reports the performance of the Instrument Pointing System (IPS) that flew on the National Aeronautics and Space Administration (NASA) ASTRO-2 Spacelab mission aboard the Space Shuttle Endeavour in March 1995. The IPS provides a stabilizing platform for the ASTRO-2 instrument payload complement that consists of three main experiments (telescopes). The telescopes observe stellar targets in the universe within the ultraviolet portion of the electromagnetic spectrum that must be observed from beyond the earth's atmospheric filtering effects. The three main experiments for observation are the Hopkins Ultraviolet Telescope (HUT), the Ultraviolet Imaging Telescope (UIT), and the Wisconsin Ultraviolet Photo-Polarimetry Experiment (WUPPE). The HUT uses spectroscopy to obtain the structure and chemical makeup of ultraviolet targets. UIT is responsible for wide field photographing to capture the hidden view of the ultraviolet universe. The WUPPE gathers data on the polarization of the ultraviolet electromagnetic energy coming from the astronomical targets. The capability of IPS enables the experiments to 'see' faint celestial objects. A brief explanation of the IPS is given followed by a review of engineering efforts to improve IPS performance over the ASTRO-1 mission. The main focus of improvements was on enhancing the star acquisition capability through improved guide star selection, lab simulations, computer upgrades, data display systems improvements, and software modifications. A star simulator was developed in the lab to enable IPS to be simulated on the ground pre-mission with flight hardware and software in the loop. The paper concludes with results from the ASTRO-2 mission. The number of targets acquired and the IPS pointing accuracy/stability is reported along with recommendations for the future use of the Instrument Pointing System.

Wessling, Francis C., III↗

Parametric Modeling and Mission Performance Analysis of a True Parallel Hybrid Turboprop Aircraft for Freighter Operations

Hybrid-electric propulsion systems for short-haul, cargo carrying aircraft have emerged as promising solutions for an environmentally sustainable future for commercial aviation. The novel propulsion architecture presents significant complexity and requires the development of new methodologies to account for the unique coupling and integration between critical design variables. This paper presents a comprehensive study on the modeling, performance assessment, and design space exploration of a C-130H freighter aircraft retrofitted with a parallel hybrid electric powertrain. Details on the development of parametric models for both the baseline and true parallel hybrid (TPH) aircraft and the integrated electrified aircraft propulsion (EAP) system sizing approach are presented along with detailed performance analyses of payload/range capabilities for short-haul cargo missions. For 2030, 2040, and 2050 EAP technology levels, the TPH C-130H configuration with a ~2.12 MW class EAP system has a range capability of 485-1,028 nautical miles and block fuel savings of 27-44%.

efficiency↗

First Look at Landsat-7 Mission Performance: Technical and Operational Results to Date

A primary goal of the current Landsat-7 mission, launched on April 15, 1999, is to acquire and refresh on a seasonal basis, calibrated ata sets of multispectral digital imagery of the landmass of the Earth The Enhanced Thematic Mapper Plus (ETM+) imager flown on Landsat-7 provides ground spatial resolutions in the panchromatic, reflective and emissive bands of 15, 30 and 60 meters, respectively, for a nominal scene 183 km wide by 170 km long. This mission not only builds on the invaluable 27-year continuous archive of thematic images of the Earth provided by previous Landsat satellites, it also inaugurates a new era of robust data acquisition with an emphasis on global change science. The newly developed Long Term Acquisition Plan (LTAP) is being used to optimize the systematic collection of data from all parts of the globe, populating the U.S.-held archive at the USGS EROS Data Center (EDC) with over 90,000 Landsat scene per year . An additional 73,000 Images are expected to be acquired each year by several international ground stations, for a total downlink of Landsat7 data in excess of 100 terabytes per year. Nearly 20,000 scan of Landsat-7 ETM+ data have already been acquired in the first 100 days of the mission. Early results derived from assessments of the ETM+ instrument, the spacecraft, and the ground processing systems indicate that the image quality is outstanding, clearly the best ever provided by any Landsat mission. Sensor radiometric background stability after the first 100 days in orbit is approximately 0.1 percent. Stability of the Full Aperture Solar Calibrator is approximately 0.3 percent, and mid-scale per pixel noise is approximately 0.6 percent. A ground processing system has been implemented at EDC which is capable of capturing, processing and archiving 250 Landsat scenes 9 per day, and delivering 100 scene products to seems each day. The cost of a systematically-processed Level 1 product has been dropped dramatically to $600, end there is no longer any copyright protection an the data. The net result is that the use of Landsat ETM+ data is expected to grow dramatically, and this growth is expected to benefit all facets of the land remote sensing community.

Williams, Darrel L.↗

Mission Performance of the GLAS Thermal Control System - 7 Years In Orbit

ICESat (Ice, Cloud and land Elevation Satellite) was launched in 2003 carrying a single science instrument - the Geoscience Laser Altimeter System (GLAS). Its primary mission was to measure polar ice thickness. The GLAS thermal control architecture utilized propylene Loop Heat Pipe (LHP) technology to provide selectable and stable temperature control for the lasers and other electronics over a widely varying mission thermal environment. To minimize expected degradation of the radiators, Optical Solar Reflectors (OSRs) were used for both LHP radiators to minimize degradation caused by UV exposure in the various spacecraft attitudes necessary throughout the mission. Developed as a Class C mission, with selective redundancy, the thermal architecture was single st ring, except for temperature sensors used for heater control during normal operations. Although originally planned for continuous laser operations over the nominal three year science mission, laser anomalies limited operations to discrete measurement campaigns repeated throughout the year. For trending of the science data, these periods were selected to occur at approximately the same time each year, which resulted in operations during similar attitudes and beta angles. Despite the laser life issues, the LHPs have operated nearly continuously over this time, being non-operational for only brief periods. Using mission telemetry, this paper looks at the performance of the thermal subsystem during these periods and provides an assessment of radiator degradation over the mission lifetime.

Grob, Eric W.↗

Implications of current SEP mission performance data on planning exploration of comets and asteroids.

The most comprehensive performance data base currently available for SEP comet and asteroid rendezvous missions has been synthesized and reduced into forms allowing evaluation of primary mission planning parameters. These data are based on utilization of the Shuttle with a Centaur injection stage and a SEP system having a 3000-sec specific impulse. The analysis indicates that a SEP vehicle system designed at a power level of around 20 kW with a system operating life of three years, offers the capability for achieving rendezvous missions to almost all comet and asteroid targets expected to be of interest in the 1980s. This degree of mission selection flexibility is desirable for a comprehensive program of small body exploration.

Allen, L. C.↗

Multi-Stage ADRs for Current and Future Astronomy Missions: Performance and Requirements for Cryogen-Free Operation

The cooling requirements for current (e.g. Astro-H) and future (e.g. IXO and ASP) astronomy missions pose significant challenges for the sub-Kelvin Cooler. In particular, the use of large detector arrays increases the cooling power needed, and the variety of cryocoolers that can be used for pre-cooling greatly expands the range of temperatures at which the sub-Kelvin cooler can be designed to reject heat. In most cases, there is also a need for a stable higher temperature stage for cooling amplifiers or telescope components. NASA/GSFC is currently building a 3-stage ADR for the Astro-H mission, and is developing a 5-stage ADR suitable for IXO and ASP, as well as many other missions in the early planning stages. The architecture of these ADRs allows them to be adapted rather easily for different cooling requirements and to accommodate different cryocooler capabilities (operating temperature and cooling power). This paper will discuss the performance of these ADRs, which operate in both continuous, and single-shot cooling modes, and the minimum cryocooler capabilities needed to meet the requirements of future missions.

Shirron, Peter↗

Supersonic through-flow fan engine and aircraft mission performance

A study was made to evaluate potential improvement to a commercial supersonic transport by powering it with supersonic through-flow fan turbofan engines. A Mach 3.2 mission was considered. The three supersonic fan engines considered were designed to operate at bypass ratios of 0.25, 0.5, and 0.75 at supersonic cruise. For comparison a turbine bypass turbojet was included in the study. The engines were evaluated on the basis of aircraft takeoff gross weight with a payload of 250 passengers for a fixed range of 5000 N.MI. The installed specific fuel consumption of the supersonic fan engines was 7 to 8 percent lower than that of the turbine bypass engine. The aircraft powered by the supersonic fan engines had takeoff gross weights 9 to 13 percent lower than aircraft powered by turbine bypass engines.

Franciscus, Leo C.↗

Cassini Attitude Control Fault Protection Design: Launch to End of Prime Mission Performance

The Cassini Attitude and Articulation Control Subsystem (AACS) Fault Protection (FP) has been successfully supporting operations for over 10 years from launch through the end of the prime mission. Cassini's AACS FP is complex, containing hundreds of error monitors and thousands of tunable parameters. Since launch there have been environmental, hardware, personnel and mission event driven changes which have required AACS FP to adapt and be robust to a variety of scenarios. This paper will discuss the process of monitoring, maintaining and updating the AACS FP during Cassini's lengthy prime mission as well as provide some insight into lessons learned during tour operations.

Meakin, Peter C.↗

Aircraft design for mission performance using nonlinear multiobjective optimization methods

A new technique which converts a constrained optimization problem to an unconstrained one where conflicting figures of merit may be simultaneously considered was combined with a complex mission analysis system. The method is compared with existing single and multiobjective optimization methods. A primary benefit from this new method for multiobjective optimization is the elimination of separate optimizations for each objective, which is required by some optimization methods. A typical wide body transport aircraft is used for the comparative studies.

Dovi, Augustine R.↗

Aircraft design for mission performance using non-linear multiobjective optimization methods

A new technique which converts a constrained optimization problem to an unconstrained one where conflicting figures of merit may be simultaneously considered has been combined with a complex mission analysis system. The method is compared with existing single and multiobjective optimization methods. A primary benefit from this new method for multiobjective optimization is the elimination of separate optimizations for each objective, which is required by some optimization methods. A typical wide body transport aircraft is used for the comparative studies.

Dovi, Augustine R.↗

Automatic Docking System Sensor Design, Test, and Mission Performance

The Video Guidance Sensor is a key element of an automatic rendezvous and docking program administered by NASA that was flown on STS-87 in November of 1997. The system used laser illumination of a passive target in the field of view of an on-board camera and processed the video image to determine the relative position and attitude between the target and the sensor. Comparisons of mission results with theoretical models and laboratory measurements will be discussed.

Jackson, John L.↗

Earth resources mission performance studies. Volume 1: Requirements definition

The need for a realistic set of earth resources collection requirements to test and maximize the data gathering capabilities of the EOS remote sensor systems is considered. The collection requirements will be derived from established user requirements. In order to confine and bound the requirements study, some baseline assumptions were established. These are: (1) image acquisition is confined to the contiguous United States, (2) the fundamental data users are select participating federal agencies, (3) the acquired data will be applied to generating information necessary or in support of existing federal agency charters, and (4) the most pressing or desired federal agency earth resources data requirements have been defined, suggested, or implied in current available literature.

Source record↗