SEARCH · Search NASA
Results for “modular construction”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Automated compatibility checking of prefabricated components using 3D as-built models and BIM
There have been recent efforts to use reality capture technologies to perform remote quality control in construction. However, there is a lack of research efforts in detecting construction incompatibilities in modular construction using reality capture technologies. The construction incompatibilities in modular construction often cause reworks and delays in the project schedule. To address this issue, this paper presents a general compatibility analysis method that propose scanning the modules in manufacturing plant and construction site, and check module-to-module compatibility remotely, prior to the shipment and installation. This study provides three sample module-to-module compatibility scenarios to validate the proposed compatibility analysis. The case study results show that the compatibility analysis method was able to identify the compatibility issues with high accuracy. Lastly, the compatibility analysis method was validated in terms of accuracy and time performance in six scenarios that was defined on the modules.
A New State of the Art: Zero Energy Modular Multifamily Construction
In 2020, the U.S. Department of Energy's Building Technologies Office (BTO) launched the Advanced Building Construction (ABC) Initiative. This initiative aimed to integrate energy efficiency into high-production construction practices. One focus area of the initiative is off-site construction, an approach that may achieve scalable, efficient, and high-performing construction buildings through process standardization. This report presents the findings and recommendations from our ABC Initiative project: A New State of the Art: Zero-Energy Modular Multifamily Construction System. The objectives of the BTO-funded project are to: 1) Achieve energy performance 50% better than the 2018 International Energy Conservation Code (IECC). 2) Achieve this level of energy performance at no additional cost VEIC worked with Louisiana State University (LSU), National Renewal Energy Lab (NREL), [the project team], and industry partners at the Mod Coach, KBS, and Solar Home Factory to identify and analyze multifamily business designs and modular construction practices. These designs and processes hold the promise of achieving the goals set out by the DOE.
Final Report: Self Consolidating Concrete Construction for Modular Units
This report outlines the development of a self-consolidating concrete (also termed “self-compacting concrete” or SCC) so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The self-roughening concrete produced as part of this research was assessed in SC structures at three scales: small-scale shear-friction specimens, mid-scale beams tested in in-plane and out-of-plane bending, and a full-scale validation test using an SC module produced by Westinghouse as part of the Plant Vogtle expansion. The experiments show that the self-roughening concrete can produce a cold-joint surface of 0.25 inches (6 mm) without external vibration during concrete placement. The experiments and subsequent analysis show that the shear friction provisions of ACI 318-14, Section 22.9 can be used to assess the shear capacity of the cold-joints in SC modular construction, and that friction coefficient of 1.35 is appropriate for use with these provisions.
The Energy in Modular (EMOD) Buildings Method: A Guide to Energy-Efficient Design for Industrialized Construction of Modular Buildings
Industrialized construction has immense potential to address the growing need globally to build and upgrade the building stock to be affordable, energy-efficient, and resilient. It can also help achieve the United States' goal of a 50% reduction in U.S. greenhouse gas (GHG) emissions by 2030. Despite this potential, and the ever-increasing push for electrification and decarbonization of households in the United States, industrialized construction has not yet been leveraged specifically to help address these challenges and accelerate the pathway to meet these goals. The National Renewable Energy Laboratory (NREL) aims to claim this missed opportunity by focusing on delivering affordable, grid-efficient net-zero energy (NZE) modular buildings for underserved communities to ensure an equitable transition to the future of clean energy, accelerate decarbonization of the built environment, and support the development of a high-productivity construction and energy efficiency workforce. The Energy in Modular (EMOD) method is our approach to designing, producing, and delivering affordable, net-zero energy, low-carbon, and healthier buildings at scale. The following energy efficiency strategies are part of the scope of this guide: envelope thermal control, envelope infiltration control, mechanical, electrical, and plumbing systems, smart controls, and solar plus storage. We draw synergies between design for manufacturing and assembly, process optimization, retrofit technologies, and digitization. Our goal is to influence the improvement and production of buildings to increase performance, enhance energy efficiency, and reduce GHG emissions. This guide documents the research and development efforts initiated by a set of design objectives to "modularize" a set of energy efficiency and low-carbon strategies into a housing unit while preserving and enhancing energy efficiency benefits and decarbonization pathways. This guide is intended to serve as a framework for housing developers, housing agencies, architects, energy experts, and process engineers or factory operator personnel who are critical to today's modular builder teams. This guide focuses on specific energy efficiency strategies, decarbonization pathways, and associated processes as part of NREL's research efforts. Stakeholders may substitute other means, methods, and technologies for the ones evaluated in this study.
Solar Living House Final Technical Report
The Solar Living House is a high-performance solar-powered dwelling designed by a team of faculty and students from the University of Florida, in collaboration with Santa Fe College, the National University of Singapore, and Alachua Habitat for Humanity. The project was designed in accordance with the Solar Decathlon 2015, a research, design, education, and outreach program developed by the U.S. Department of Energy (DOE). The Solar Living House is fundamentally a house for living, centered on people and the activities of daily life while quietly introducing advanced design, construction, and engineering technologies. The 993 square-foot two-bedroom one-bath home was designed to embrace and frame an exterior courtyard space. This courtyard acts as an extension of the interior living spaces, maximizing the spatial potentials of a modest building footprint and introducing natural light into the primary living spaces of the house. Research Outcomes: The Solar Living House advances work on high-performance buildings through three principal technological innovations: wet/dry modular construction, a building automation system, and solar dehumidification systems. Wet / Dry Modular Construction: The house is designed as a series of five modules, including one that is designated as the “wet core.” The wet core consolidates the mechanical systems and bathroom into a single module to reduce plumbing runs, efficiency losses, and on-site construction time. The other four modules are designed to eliminate interior load bearing walls to allow for maximum flexibility in the reconfiguring of the space over time. The modules are designed to meet the structural challenges of both Florida’s hurricanes and California’s earthquakes. Building Automation System: The house is equipped with an integrated building automation system, allowing the houses environmental systems, lights, security systems, and smoke detectors to be programmed, monitored, and controlled through any mobile or computing device. These systems allow for more precise calibrations of temperature/humidity/lighting to correspond with user needs and preferences, minimizing energy losses with economical night- or day-time setbacks. Solar Dehumidification System: The most significant technological innovation in the Solar Living House is the solar thermal dehumidification system. This system generates hot water through two rooftop-mounted evacuated tube solar thermal collectors. The hot water is used to continually dry a regenerative solid desiccant material, typically white silica gel. The solid desiccant is used to adsorb moisture and humidity from the air without additional mechanical cooling. This strategy allows humidity to be modulated independently of air temperature, providing greater thermal comfort and reducing the opportunity for the growth of mold spores within the house while also reducing the overall energy consumption of the HVAC system. Economic Feasibility: The team set aggressive goals for affordability, targeting a construction cost of $138,710. An independent professional cost estimator determined the overall project costs, as designed, would be $333,799, or $336.15 per square foot of finished floor area. This is more than 2.4 times the target construction cost. By comparison, the average construction cost for a home in the United States in 2015 was $289,415, or $103.29 per square foot of finished floor area. Following work on the Solar Living House, team leaders incorporated many of its objectives into a net-zero energy home on a site in Gainesville, Florida. This site-built home avoided many of the constraints and complications of modular construction necessitated by the Solar Decathlon, allowing it to be built for a much more modest budget. This two-bedroom two bath 1,800 square foot home was constructed for $135.39 per square foot, including active photovoltaic solar systems, careful attention to continuous air barriers, increased insulation levels, and permanent site constructions. This project suggest that high-performance buildings can be realized for more modest budgets. Public Benefits: Work on the Solar Living House and Solar Decathlon 2015 offered our student team unparalleled learning opportunities. Because of the duration of the project, a number of students participated at different points in their education, from first year undergraduates all the way through to advanced graduate students. The opportunity for collaboration with students and faculty from the National University of Singapore was also extraordinary, allowing for a sharing of technical knowledge and cultural exchange. The wider public has benefited from this work as its findings have been shared through public presentations and publications. It serves as a useful stepping stone along the path towards affordable, high-performance buildings.
Final Report: Self-Consolidating Concrete Construction for Modular Units
This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed “self-compacting concrete” or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This “self-roughening” was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by Westinghouse and similar in construction to the steel composite modules being assembled at the Vogtle and V.C. Summer plant expansions. The final test showed that the roughened cold-joint showed excellent shear and flexural capacity, and substantial ductility, when used in conjunction with steel composite construction.
Transformative Efficiency and Automation in Modular Homes (TEAMH)
This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.
Innovative Process for Comprehensive Treatment of Liquid Radioactive Waste - 12551
This paper presents the results of research activities aimed at creation of a principally new LRW distilling treatment method. The new process is based on the instantaneous evaporation method widely used in distillation units. The main difference of the proposed process is that the vapor condensation is conducted without using heat exchangers in practically ideal mode by way of direct contacting in a vapor-liquid system. This process is conducted in a specially designed ejector unit in supersonic mode. Further recuperation of excess heat of vaporization is carried out in a standard heat exchanger. Such an arrangement of the process, together with use of the barometric height principle, allows to carry out LRW evaporation under low temperatures, which enables to use excess heat from NPS for heating initial LRW. Thermal calculations and model experiments have revealed that, in this case, the expenditure of energy for LRW treatment by distilling will not exceed 3 kilowatt-hour/m{sup 3}, which is comparable with the reverse-osmosis desalination method. Besides, the proposed devices are 4 to 5 times less metal-intensive than standard evaporation units. These devices are also characterized by versatility. Experiments have revealed that the new method can be used for evaporation of practically any types of LRW, including those containing a considerable amount of oil products. Owing to arrangement of the evaporation process at low temperatures, the new devices are not sensitive to 'scale formation'. This is why, they can be used for concentrating brines of up to 500-600 g/l. New types of such evaporating devices can be required both for LRW treatment processes at nuclear-power plants under design and for treating 'non-standard' LRW with complex physicochemical and radionuclide composition resulting from the disaster at the Fukushima I Nuclear Power Plant.) As a result of accidents at nuclear energy objects, as it has recently happened at NPP 'Fukushima-1', personnel faces the necessity to take emergency measures and to use marine water for cooling of reactor zone in contravention of the technological regulations. In these cases significant amount of liquid radioactive wastes of complex physicochemical composition is being generated, the purification of which by traditional methods is close to impossible. According to the practice of elimination of the accident after-effects at NPP 'Fukushima' there are still no technical means for the efficient purification of liquid radioactive wastes of complex composition like marine water from radionuclides. Therefore development of state-of-the-art highly efficient facilities capable of fast and safe purification of big amounts of liquid radioactive wastes of complex physicochemical composition from radionuclides turns to be utterly topical problem. Cesium radionuclides, being extremely dangerous for the environment, present over 90% of total radioactivity contained in liquid radioactive wastes left as a result of accidents at nuclear power objects. For the purpose of radiation accidents aftereffects liquidation VNIIHT proposes to create a plant for LRW reprocessing, consisting of 4 major technological modules: Module of LRW pretreatment to remove mechanical and organic impurities including oil products; Module of sorption purification of LWR by means of selective inorganic sorbents; Module of reverse osmotic purification and desalination; Module of deep evaporation of LRW concentrates. The first free modules are based on completed technological and designing concepts implemented by VNIIHT in the framework of LLRW Project in the period of 2000-2001 in Russia for comprehensive treatment of LWR of atomic fleet. These industrial plants proved to be highly efficient and secure during their long operation life. Module of deep evaporation is a new technological development. It will ensure conduction of evaporation and purification of LRW of different physicochemical composition, including those containing hardness salts, resulted in generation of LRW concentrate 300-600 g/l. The method is based on utilization of supersonic ejector for intensification of thermal physic processes and performance of evaporation in brine recycling mode. All proposed technological solutions are totally based on patented Russian developments. Proposed work will allow to construct modular plants, which will be totally prepared for efficient purification of any types of liquid radioactive wastes from radionuclides in case of force majeure. According to proposed scheme concentration level of cesium radionuclides in safe-for-storage form will make up not less than 5000. With respect to purification from cesium radionuclides of liquid radioactive wastes stored at NPP 'Fukushima' about 10 t of inorganic sorbents, loaded in 160 protective filter-containers, will be required for solving this problem. The amount of secondary wastes will be reduced approximately in 5 times in comparison with traditional schemes, applied in purification of secondary LRW of Fukushima-1 by Areva (France) and Kurion (USA) companies. All units of modular plants will be constructed and manufactured as totally automated, providing their twenty-four-hour safe operation. Modular design will ensure efficiency and let optimize the costs of secondary LRW treatment. In order to ensure off-line operation in emergency conditions the plant should be equipped with auxiliary modules: energy and ventilation ones. Under normal conditions these modules can be stored in 'mothballed' condition at special warehouses under the authority of federal bodies. It will be reasonable to choose required transport facilities, the most suitable for transportation of modules to target destination beforehand, using vessel classification list.
Mapping Lipid Fragmentation for Tailored Mass Spectral Libraries
Libraries of simulated lipid fragmentation spectra enable the identification of hundreds of unique lipids from complex lipid extracts, even when the corresponding lipid reference standards do not exist. Often, these in silico libraries are generated through expert annotation of spectra to extract and model fragmentation rules common to a given lipid class. Although useful for a given sample source or instrumental platform, the time-consuming nature of this approach renders it impractical for the growing array of dissociation techniques and instrument platforms. Here, we introduce Library Forge, a unique algorithm capable of deriving lipid fragment mass-to-charge (m/z) and intensity patterns directly from high-resolution experimental spectra with minimal user input. Library Forge exploits the modular construction of lipids to generate m/z transformed spectra in silico which reveal the underlying fragmentation pathways common to a given lipid class. By learning these fragmentation patterns directly from observed spectra, the algorithm increases lipid spectral matching confidence while reducing spectral library development time from days to minutes. We embed the algorithm within the preexisting lipid analysis architecture of LipiDex to integrate automated and robust library generation within a comprehensive LC-MS/MS lipidomics workflow. .
Experimental study on seismic behavior of a novel plug-in self-lock joint for modular steel construction
Not Available
Vision-based inspection of prefabricated components using camera poses: Addressing inherent limitations of image-based 3D reconstruction
Modular construction can lead to additional cost overruns and delays when a defect is found on the construction site and is not easily repairable. Researchers have developed various methods that use image-based 3D reconstruction for quality assessment, but they have inherent limitations, such as inconsistency and dealing with surfaces with reflectivity and limited visual features. Therefore, this paper presents a vision-based quality assessment method using cameras for prefabricated components by addressing these limitations. Specifically, this paper proposes a novel quality inspection method with sub-millimeter accuracy using cameras focused on leveraging camera poses (as opposed to 3D point clouds that are often not consistent in quality) from the image-based 3D reconstruction. The 3D point estimation by computing triangulation was used for achieving accurate measurement. The proposed method is validated using six different variances and two case studies – an aluminum pipe with a reflective surface and a fabricated concrete column. Furthermore, the results demonstrate the accuracy and effectiveness of the proposed method.
A layered approach for modular container construction and orchestration in HPC environments.
Abstract not provided.
Enhancing Worker Safety During Off-Site Construction of Energy-Efficient, Low-Carbon Exterior Envelope
The construction industry is not doing enough to embrace off-site modular construction. It is a missed opportunity for optimized energy efficiency because prefabricated exterior wall envelopes are lower in cost and faster and easier to install. Factory off-site construction offers improved safety for construction workers because work is done in a controlled environment, but lack of intent, understanding, and data is also a missed opportunity for enhancing worker safety. This research looks specifically at the prefabricated wall exterior envelope in the context of safety. The research question is "off-site factories build with ease of energy efficiency and lowered carbon emissions, but is the process safer?" This research was funded by NREL Student Training in Applied Research (STAR) program, University Partnerships Program, and Wells Fargo Bank. Key finding is that modular and prefabricated construction are perceived to be safer, but the accident rates are much higher than in the general construction and manufacturing industries. Proposed solutions to decrease accidents in off-site prefabricated construction includes safety training for workers, provide movable kiosks with PPE at workstations, ensure tools are well-maintained and place safety posters in visible locations. Future work includes improving worker safety to increase worker productivity, perform pilot demonstration, work with factory designers for new modular layout for worker safety, i.e., easy access to PPE kiosks, and work closely with OSHA so that they take notice of this safety niche.
Integrating Energy Efficiency Strategies with Industrialized Construction for Our Clean Energy Future: Preprint
NREL’s Industrialized Construction Innovation Team has developed an ambitious plan to accelerate the integration of energy efficiency (EE) strategies with Industrialized Construction (IC). The United States (U.S.) construction industry is beginning to use IC methods to build multifamily apartment buildings to address affordability and labor shortages. Apart from reducing cost of construction and delivery times, the IC method of permanent modular construction has the potential to facilitate the integration of a wide range of EE strategies and advanced controls into such buildings. While there may be unintended EE benefits to IC such as a tighter envelope due to higher construction quality, the process has not been leveraged specifically to enhance EE. NREL aims to claim this missed opportunity and integrate IC benefits with EE as well as advanced controls, distributed energy resources, and grid-friendly design strategies. The paper proposes an ‘IC Assessment Framework’ to achieve affordable zero-energy modular multifamily buildings. Through the selection criteria of Design for Manufacturing and Assembly, the framework aims to distill a broad range of proven EE strategies for site-built into a set of strategies that qualify as easy to integrate for off-site. The output is a Factory Information Model (FIM) that represents a process-based digital twin to enable advanced time-and-motion study, plugs into open source building energy modeling platform (EnergyPlus), and serves as a vital tool facilitating wider adoption of EE integration. Conclusively, the paper delineates next steps for upcoming pilots with NREL’s IC partners towards developing a transformational pathway for our Clean Energy Future.
Lake Charles CCS Project (Final Technical Report, Phase 2)
In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.
Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors
The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.
Development of Integrated Mechanical Pods
This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.