Search NASA⌕ Search

SEARCH · Search NASA

Results for “navigation operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Mission Operations and Navigation Toolkit Environment

MONTE (Mission Operations and Navigation Toolkit Environment) Release 7.3 is an extensible software system designed to support trajectory and navigation analysis/design for space missions. MONTE is intended to replace the current navigation and trajectory analysis software systems, which, at the time of this reporting, are used by JPL's Navigation and Mission Design section. The software provides an integrated, simplified, and flexible system that can be easily maintained to serve the needs of future missions in need of navigation services.

Sunseri, Richard F.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U)+ CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of crosslink ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip-scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle using their Photon upper stage to deploy the CAPSTONE spacecraft. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from the Photon stage and traversed an approximately 4-month, highly fuel-efficient transfer phase entering the NRHO November 13, 2022, for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is led by Advanced Space, LLC. Spacecraft development and mission operations are conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstrating the accessibility of NHROs; validating key operational concepts in the NHRO environment; laying the foundation for commercial support of future lunar operations; and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA’s Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Optical Communication Activities Through the Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) Office

The Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) office at Goddard Space Flight Center (GSFC) manages two NASA optical communication related projects, the Orion EM-2 Optical Communications Terminal (O2O) and the Integrated Laser Communications Relay Demonstration (LCRD) Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) projects. The main goal of LEMNOS project is to implement optical communications technologies on NASA missions starting with demonstrations of operational utility on Orion EM-2 and the International Space Station.

Seas, Antonios A.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for Gateway’s Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U) CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of cross-link ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle utilizing their Photon upper stage to deploy the CAPSTONE spacecraft into lunar orbit. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from Rocket Lab’s Photon stage and traversed an approximately 4 month highly efficient transfer phase entering the NRHO Novermber 13, 2022 for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is lead by Advanced Space, LLC. Spacecraft development and mission operations is conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstration of the accessibility of NHROs, validation of key operational concepts in the NHRO environment, laying the foundation for commercial support of future lunar operations, and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE): Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. This presentation accompanies the paper of the same title.

Elwood F Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE)

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Human Factors Assessment of Disturbances to Scheduled Performance-Based Navigation Arrival Operations

The introduction of Performance-Based Navigation (PBN) specifications to air traffic management has resulted in many benefits during nominal operations, including shorter flight paths, reduced fuel costs, and improved terminal area arrival rates. However, these benefits become less noticeable during off-nominal operations where aircraft are routinely interrupted from staying on PBN procedures due to disturbances such as missed approaches. This human-in-the-loop (HITL) study used multiple types of disturbance events to perturb the arrival schedule. Perturbed schedules were managed with different types of schedule adjustments, including a condition with no adjustments. The study collected data on a host of dependent variables, including human factors measures on controller workload and system performance measures such as schedule nonconformance (nc). Initial analyses showed strong correlations between aggregated controller workload and aggregated nc, as well as benefits of both automatic and manual schedule adjustments for increasing system performance, such as reduced PBN procedure interruptions. The goal of this paper is to further test these initial findings. The results indicated that an increase in schedule nonconformance correlated with an increase in controller workload at specific time intervals, and automated schedule adjustments consistently reduced controller workload associated with nonconformance.

Human factors↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Assessing Resilience of Scheduled Performance-Based Navigation Arrival Operations

This paper assesses the resilience of scheduled Performance-Based Navigation (PBN) arrival operations. Resilience is defined as an ability to return to nominal operations following a schedule perturbation. Results from a Human-in-the- Loop (HITL) experiment that included off-nominal events to perturb the schedule are described. The schedule comes from a precision trajectory-based arrival manager. The experiment collected data regarding the response to perturbed schedules in three conditions, where: 1) a disturbance rejection algorithm made schedule adjustments automatically, 2) a Traffic Management Coordinator (TMC) participant made schedule adjustments manually, or 3) no schedule adjustments were made. Analyses showed that the simulation’s scheduled PBN operations have inherent resilience, recovering from more than half of the perturbed schedules even with no schedule adjustments. Resilience to the same off-nominal events improved with schedule adjustments; an increased proportion of perturbed schedules recovered within the length of operation run, and the average duration of the schedule’s perturbed state decreased. Compared to the manual schedule adjustments condition, a greater number of schedule adjustments occurred for the same off-nominal events in the automated condition. However, perturbed schedules were recovered more frequently and perturbations were less severe in the automated condition. Subjective and objective workload in the manual and the automated schedule adjustment conditions were similar to the no schedule adjustment condition.

Resilience↗

Navigation network operational considerations

The development of the philosphy necessary for the initial operations costing of the three candidate navigation network designs is described. The effect of the need to minimize costs upon the operations and maintenance concepts, the simplification of operations by adopting the very long base interferometry principle as a basis for the scenarios, and the estimation of the annual load factor based upon an assumed mission set are detailed.

Hird, E.↗

Small-Body Proximity Operations & TAG: Navigation Experiences & Lessons Learned from the OSIRIS-REx Mission

On October 20th, 2020, the nearly two-year proximity operations campaign for the Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx)mission at the near-Earth asteroid (101955) Bennu culminated in a successful Touch-and-Go (TAG) sample collection event. Navigation performance was a significant driver for flight activities at Bennu, which consisted of multiple phases geared towards characterizing the asteroid, selecting a sample site, and safely guiding the spacecraft to and from the surface in order to collect at least 60 g of pristine regolith. The entire operations team gained a tremendous amount of experience operating in the challenging small body environment and overcame many challenges. In this paper, we summarize navigation-focused experiences and lessons learned from OSIRIS-REx proximity operations at Bennu that are applicable to future missions to small asteroids, comets, and planetary moons. Areas of focus include staffing and organization, ground system infrastructure, mission phase planning, navigation operations, and spacecraft and payload considerations.

Kenneth M. Getzandanner↗

OSIRIS-REx Proximity Operations and Navigation Performanceat (101955) Bennu

The NASA Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx) spacecraft began close proximity operations at the small (500-m diameter) B-type asteroid (101955) Bennu in December 2018 and concluded in May 2021. Hundreds of grams of pristine surface regolith were collected on October 20, 2020, when the OSIRIS-REx spacecraft successfully executed the Touch and Go (TAG) sample collection sequence. The spacecraft touched down within 1 meter of the targeted site on the surface of Bennu. TAG was the culmination of over 2 years of navigation performance refinement as a result of extraordinary interagency teamwork between the Flight Dynamics System (FDS), science and spacecraft teams while in close proximity to Bennu. This paper will discuss the navigation processes, planning and performance during the proximity operations at Bennu.

Peter G. Antreasian↗

OSIRIS-REx Proximity Operations and Navigation Performance at (101955) Bennu

The NASA Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx) spacecraft began close proximity operations at the small (500-mdiameter) B-type asteroid (101955) Bennu in December 2018 and concluded in May 2021.Hundreds of grams of pristine surface regolith were collected on October 20, 2020, when the OSIRIS-REx spacecraft successfully executed the Touch and Go (TAG) sample collection sequence. The spacecraft touched down within 1 meter of the targeted site on the surface of Bennu. TAG was the culmination of over 2 years of navigation performance refinement as a result of extraordinary interagency teamwork between the Flight Dynamics System (FDS),science and spacecraft teams while in close proximity to Bennu. This paper will discuss the navigation processes, planning and performance during the proximity operations at Bennu.

Peter G Antresian↗

Navigation Flight Operations for Mars Pathfinder

On July 4, 1997, Mars Pathfinder became the first spacecraft to land on the surface of Mars in 21 years. Pathfinder was launched on December 4, 1996 and spent seven months en route to the red planet. This report discusses the navigation flight experience for the Mars Pathfinder interplanetary cruise. In particular, orbit determination and maneuver design and execution results are presented. Special emphasis is given to the navigation role in the days and hours leading up to and including the Entry, Descent, and Landing (EDL) phase.

Vaughan, Robin M.↗

Optical Navigation for the Dawn Mission at Vesta

The Dawn S/C was launched in September 2007 in order to perform remote sensing observations of the asteroids Vesta and Ceres. Dawn entered into orbit about Vesta in July 2011, completed successfully the mission goals, that were carried out in four different science orbits, by August 2012 and has since departed towards asteroid Ceres. An important component of the Dawn navigation was optical navigation, which was performed at almost all mission phases.Optical data types were used in the overall orbit determination process. In addition they were used to determine some key aspects of the asteroid's physical characteristics, such as the rotational axis, shape and surface morphology and gravity terms. In this paper we present an overview of the optical navigation operations at Vesta, the optical navigation planning, image acquisition strategy, data reduction methodology, and the up-to-date post operations assessment. Of particular importance is the extensive use of landmark navigation, which was performed for the first time for real-time support of operations and which comprised the bulk of the optical data processing.

orbital operations↗