Search NASA⌕ Search

SEARCH · Search NASA

Results for “notification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Expedited Demolition Notification for Structures at Technical Area 54

The National Nuclear Security Administration (NNSA) and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are informing the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB) of the need to expedite the demolition of structures summarized in the enclosure. These structures have recently been identified to receive funding and be demolished. Structure TA-54-0296 will be demolished prior to December 30, 2012. The remaining structures covered by this notification will be demolished within the January 1, 2013 through March 31, 2013 quarter.

42 ENGINEERING↗

Notification of General Class 1 Permit Modification for the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit, EPA ID # NM0890010515

This document contains a notification for a Class 1 Permit Modification to modify the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit). The text modifications are provided herein and have been made to the Permit by the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS), collectively the Permittees. The modifications to the text of the Permit have been identified using red text and red lines through the texts for deletions. Description: This modification includes three changes. One change includes an address change within the Attachment D, Contingency Plan, and the remaining changes correct two typographical errors in Permit Section 2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Notification of Class 1 Permit Modification to Attachment B, Part A Application for the Los Alamos National Laboratory Hazardous Waste Facility Permit, EPA ID # NM0890010515

This document contains a notification for a Class 1 Permit Modification to modify the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit) issued to the Department of Energy and the Los Alamos National Security, LLC, collectively known as the Permittees, in November 2010. All changes have been made to Attachment B, Part A Application, and a full, updated form, Revision 10.0, is enclosed. The modification updates the facility contact and address information, and the process codes and design capacity section for Technical Area (TA) 14; TA-16; TA-39; TA-54 West; TA-54, Area G; and TA-55 within the Attachment B, Part A Application. The process codes and design capacity section for TA-14, TA-16, and TA-39 was updated to incorporate a statement that the Permittees have notified of the intent to close units at these locations. The process design capacity for TA-54, Area G has been updated from 3,664,150 gallons to 4,346,590 gallons to account for the TA-54, Area G Pad 11 container storage unit that was added when the Permit was issued in 2010 but at the time did not previously store hazardous waste. The number of units at TA-54, Area G was also updated to 9 units to include this new unit. The process design capacity for TA-55 has also been updated from 178,500 gallons to 207,600 gallons to incorporate the addition of the TA-55-185 container storage unit that was also added when the Permit was issued. The number of storage units at TA-55 was updated to 7 to include the unit. The process design capacity at TA-54 West was changed to 11,660 gallons to correct a typographical error in previous versions of the form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Explicit Congestion Notification with the Mark-Front Strategy

Delivering congestion signals is essential to the performance of networks. Current TCP/IP networks use packet losses to signal congestion. Packet losses not only reduces TCP performance, but also adds large delay. Explicit Congestion Notification (ECN) delivers a faster indication of congestion and has better performance. However, current ECN implementations mark the packet from the tail of the queue. In this paper, we propose the mark-front strategy to send an even faster congestion signal. We show that mark-front strategy reduces buffer size requirement, improves link efficiency and provides better fairness among users. Simulation results that verify our analysis are also presented.

Liu, Chunlei↗

Automated Status Notification System

NASA Lewis Research Center's Automated Status Notification System (ASNS) was born out of need. To prevent "hacker attacks," Lewis' telephone system needed to monitor communications activities 24 hr a day, 7 days a week. With decreasing staff resources, this continuous monitoring had to be automated. By utilizing existing communications hardware, a UNIX workstation, and NAWK (a pattern scanning and processing language), we implemented a continuous monitoring system.

Source record↗

Enhanced, Partially Redundant Emergency Notification System

The Johnson Space Center Emergency Notification System (JENS) software utilizes pre-existing computation and communication infrastructure to augment a prior variable-tone, siren-based, outdoor alarm system, in order to enhance the ability to give notice of emergencies to employees working in multiple buildings. The JENS software includes a component that implements an administrative Web site. Administrators can grant and deny access to the administrative site and to an originator Web site that enables authorized individuals to quickly compose and issue alarms. The originator site also facilitates maintenance and review of alarms already issued. A custom client/server application program enables an originator to notify every user who is logged in on a Microsoft Windows-based desktop computer by means of a pop-up message that interrupts, but does not disrupt, the user s work. Alternatively or in addition, the originator can send an alarm message to recipients on an e-mail distribution list and/or can post the notice on an internal Web site. An alarm message can consist of (1) text describing the emergency and suggesting a course of action and (2) a replica of the corresponding audible outdoor alarm.

Pounds, Clark D.↗

Direct memory access transfer completion notification

Methods, compute nodes, and computer program products are provided for direct memory access (`DMA`) transfer completion notification. Embodiments include determining, by an origin DMA engine on an origin compute node, whether a data descriptor for an application message to be sent to a target compute node is currently in an injection first-in-first-out (`FIFO`) buffer in dependence upon a sequence number previously associated with the data descriptor, the total number of descriptors currently in the injection FIFO buffer, and the current sequence number for the newest data descriptor stored in the injection FIFO buffer; and notifying a processor core on the origin DMA engine that the message has been sent if the data descriptor for the message is not currently in the injection FIFO buffer.

Chen, Dong↗

Methods, apparatus and system for notification of predictable memory failure

A method for providing notification of a predictable memory failure includes the steps of: obtaining information regarding at least one condition associated with a memory; calculating a memory failure probability as a function of the obtained information; calculating a failure probability threshold; and generating a signal when the memory failure probability exceeds the failure probability threshold, the signal being indicative of a predicted future memory failure.

97 MATHEMATICS AND COMPUTING↗

Notification of Concurrence - K-25/K-27 D&D Project, ETTP - Change Number of EMWMF Waste Lots in the Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the ETTP, Oak Ridge, TN From Two to Three

Section 5.1 of the approved Waste Handling Plan for Demolition ofthe K-25 and K-2 7 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (WHP) includes two Environmental Management Waste Management (EMWMF) waste lots: (1) Asbestos-contaminated roofing/transite; and (2) Construction debris, such as nonasbestos roofing, structural steel/miscellaneous metal/equipment, nonradiological piping, wood, and miscellaneous small quantities of concrete. This concurrence form adds an additional EMWMF waste lot 6.47 for lavatory sink drains. Based on an analysis of the building structure characterization data, the only individual building structure with either an analytic carcinogenic or Hazard Index (HI) sum-of-fractions (SOF) greater than 1 is the lavatory sink drains (Table 1). The HI SOF for the lavatory sink drains is 1.34 (Table 2). When all media are combined with the material of construction calculations, the HI SOF is 1.22 (Table 3). However, when the lavatory sink drains are segregated from all other media, the HI SOF is only 0.256, which is well below the EMWMF waste acceptance criteria SOF limit of 1 (Table 4). Given the large volume (124, 625 cubic yards) of other building structure media with a small HI SOF of 0.256 and the small volume (one cubic yard) of lavatory sink drains with a large HI SOF of 1.34, a separate waste lot for lavatory sink drains is recommended. Lead is the primary contributor to the large HI SOF in the lavatory sink drains. Lead in the lavatory sink drains was shown using the Wilcoxon rank-sum test statistically to have higher concentrations than all other building structure media combined. Other analytes having statistically different median concentrations in the lavatory sink drains compared to all other media are antimony, arsenic, boron, cadmium, selenium, solver, vanadium, zinc, mercury, strontium, and Uranium-233/234 (Table 5). A separate waste lot for the lavatory sink drains minimizes the volume weighted sum-of fractions since a much smaller volume of waste will have the higher HI SOF of 1.34, while a much larger volume of waste will have a small HI SOF of 0.256.

54 ENVIRONMENTAL SCIENCES↗

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demolition Notification for Quarter Ending June 30, 2013

The National Nuclear Security Administration (NNSA) and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are submitting notice of demolition activities for the quarter ending June 30,2013, in accordance with Permit Section 1.17.2 of the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit), to the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB).

54 ENVIRONMENTAL SCIENCES↗

Demolition Notification for Quarter Ending March 30, 2014

The National Nuclear Administration (NNSA) and Los Alamos National Security, LLC (LANS), (collectively the Permittees) are submitting notice of demolition activities for quarter ending March 30, 2014 in accordance with Permit Section 1.17.2 of the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit to the New Mexico Environment Department Hazardous Waste Bureau (NMED_HWB).

54 ENVIRONMENTAL SCIENCES↗

Startup Notification Report 3rd Quarter FY17.

This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.

99 GENERAL AND MISCELLANEOUS↗

Notification of Operational Scope Change for the FTWC Venting Project at Los Alamos National Laboratory (LANL)

This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗