Search NASA⌕ Search

SEARCH · Search NASA

Results for “notification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demolition Notification for Quarter Ending June 30, 2013

The National Nuclear Security Administration (NNSA) and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are submitting notice of demolition activities for the quarter ending June 30,2013, in accordance with Permit Section 1.17.2 of the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit), to the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB).

54 ENVIRONMENTAL SCIENCES↗

Demolition Notification for Quarter Ending March 30, 2014

The National Nuclear Administration (NNSA) and Los Alamos National Security, LLC (LANS), (collectively the Permittees) are submitting notice of demolition activities for quarter ending March 30, 2014 in accordance with Permit Section 1.17.2 of the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit to the New Mexico Environment Department Hazardous Waste Bureau (NMED_HWB).

54 ENVIRONMENTAL SCIENCES↗

Startup Notification Report 3rd Quarter FY17.

This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.

99 GENERAL AND MISCELLANEOUS↗

Notification of Operational Scope Change for the FTWC Venting Project at Los Alamos National Laboratory (LANL)

This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Legacy Depleted Uranium (DU) Discovered on TTR Lakebed (subsurface)(DOE Occurrence Report Final Notification)

Soil from an excavated test was being surveyed and fresh DU fragments removed so the soil could be returned to the excavation hole. Sandia RCTs discovered two locations where highly oxidized DU was present just below the undisturbed lake bed surface. The oxidized DU was removed for disposal as radioactive waste. Approximately one cubic foot of oxidized DU mixed with soil was removed. Line Manager, Sr. Manager and Acting Director were all notified of this event.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compendium of Cyber Incident Notification Requirements for Critical Infrastructure Utilities by State

Cyber attacks targeting critical infrastructure in the United States are on the rise and pose serious risks to the economy and health and safety of its citizens. Experts suggest a sound cyber risk mitigation strategy includes constant monitoring for signs of cyber intrusions and rapid reporting of incidents so that other critical infrastructure operators may benefit from early warnings. Reporting incidents to Public Utility Commissions (PUCs) and other state agencies who have roles in energy emergency planning and incident response and recovery is essential for them to maintain situational awareness and provide necessary support to ensure rapid restoration of utility services, should disruptions occur.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DMTN-165: A Hybrid Notification and Alert Retrieval Service

We consider the implications of providing a subset of alert packet contents in the alert stream, with the full alert packets available for rate-limited retrieval using an identifier included in the "lightweight" alert. This hybrid approach would enable much wider dissemination of the complete lightweight alert stream, potentially to thousands more users than is possible in the current baseline. In turn this "alerts on your laptop" access would allow users to conduct more sophisticated filtering and analysis than the current Alert Filtering Service, increasing the overall scientific returns of the alert stream. Community brokers would still be able to retrieve all of the contents of the full alert stream within the 60 second latency window and would gain greater control over their ingestion of the bulk alert data. Technically, this hybrid system may represent a modest increase in complexity over the current baseline but is likely to be more operationally robust.

79 ASTRONOMY AND ASTROPHYSICS↗

Remote shock sensing and notification system

A low-power shock sensing system includes at least one shock sensor physically coupled to a chemical storage tank to be monitored for impacts, and an RF transmitter which is in a low-power idle state in the absence of a triggering signal. The system includes interface circuitry including or activated by the shock sensor, wherein an output of the interface circuitry is coupled to an input of the RF transmitter. The interface circuitry triggers the RF transmitter with the triggering signal to transmit an alarm message to at least one remote location when the sensor senses a shock greater than a predetermined threshold. In one embodiment the shock sensor is a shock switch which provides an open and a closed state, the open state being a low power idle state.

Muralidharan, Govindarajan↗

Improving User Notification on Frequently Changing HPC Environments

Today s HPC centers user environments can be very complex. Centers often contain multiple large complicated computational systems each with their own user environment. Changes to a system s environment can be very impactful; however, a center s user environment is, in one-way or another, frequently changing. Because of this, it is vital for centers to notify users of change. For users, untracked changes can be costly, resulting in unnecessary debug time as well as wasting valuable compute allocations and research time. Communicating frequent change to diverse user communities is a common and ongoing task for HPC centers. This paper will cover the OLCF s current processes and methods used to communicate change to users of the center s large Cray systems and supporting resources. The paper will share lessons learned and goals as well as practices, tools, and methods used to continually improve and reach members of the OLCF user community.

communication↗

Route-vehicle road load management and/or operator notification thereof

A vehicle may include a controller configured to control the vehicle to operate in an active control mode or a passive control mode. In the passive control mode, the controller may provide a feedback indicator on a human machine interface. In the active control mode, the controller may provide a control command to an engine control unit.

42 ENGINEERING↗