Lowering the RHIC-Injection Lambertson Septum magnet to reduce the strength of the RHIC Injection Kickers
The present RHIC beam-injection-system and one of its components the Lambertson septum magnet will be used by the EIC project to inject the hadrons from the AGS into the EIC hadron ring for further acceleration. The number of hadron bunches injected to fill the EIC ring will be almost three times as many as compared to the number of bunches to fill RHIC. The increase of the injected bunches requires new type of kickers known as “transmission line” or “strip line” kickers which provide faster rise time of ~18 nsec, but this type of kickers may not be strong enough to provide the kick required to place the injected beam trajectory into the reference orbit of the circulating beam. In this technical note we provide a modification of the RHIC injection system which consists of lowering the Lambertson septum to decrease the strength of the kickers required to place the injected beam into the reference orbit of the circulating beam.