Search NASA⌕ Search

SEARCH · Search NASA

Results for “on-orbit imagery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

EO-1/Hyperion Hyperspectral Imager Design, Development, Characterization, and Calibration

The Hyperion Imaging Spectrometer is one of three principal instruments aboard the EO-1 spacecraft. Its mission as a technology demonstrator is to evaluate on-orbit issues for imaging spectroscopy and to assess the capabilities of a spacebased imaging spectrometer for earth science and earth observation missions. The instrument provides earth imagery at 30 meter spatial resolution, 7.5 km swath width in 220 contiguous spectral bands at 10 nm spectral resolution. Spectral range is from 0.4 gm to 2.5 gm. The instrument includes internal and solar calibration sub-systems. This paper will review the design, construction and calibration of the Hyperion instrument. The on-orbit plans and operations will be presented along with updated calibration and characterization measurements.

Folkman, Mark↗

STS-121: Discovery Space Shuttle Safety Improvements Briefing

Steve Poulos, Space Shuttle Orbiter Projects Office Manager, and John Chapman, Space Shuttle External Tank Project Manager is shown in this STS-121 Space Shuttle Discovery safety improvements briefing. A graphic presentation of the gap filler installation is shown. The graphics include: 1) Protruding gap fillers during STS-114 mission; 2) STS-114 gap fillers removed on orbiter; 3) Gap filler installation prior to STS-114; 4) Post-STS-114 installation techniques; 5) Gap filler installation post STS-114; 6) Gap filler priority areas; 7) Discovery gap filler installation table and status for STS-121; 8) Damaged blanket on STS-114; 9) On-orbit photography and post-landing photography on STS-114; and 10) STS-114 insulation tiles. Poulos presents imagery that was obtained on STS-114. The imagery includes: 1) The Enhanced Launch Vehicle Imaging System (ELVIS); 2) Liquid oxygen external tank view; 3) Hand-held imagery of the external tank falling into the ocean; 4) ELVIS on STS-121, short, medium and long range camera configurations; 5) Radar capability on the ground at Kennedy Space Center, and 6) STS-121 aft external tank door tiles. Poulos says that STS-121 will have even more imagery than STS-114. John Chapman presents video animation of the external tank where modifications were made along with the ice frost ramps with extensions. Chapman explains these areas using an external tank model. Questions are then answered from the media.

Source record↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

ISS Radiator Face Sheet Anomaly Investigation and Return to Function

Maintaining sufficient heat rejection on the International Space Station (ISS) is critical to the function of the Low-Earth Orbit station. The External Active Thermal Control System (EATCS) rejects the excess heat generated by the US On-Orbit Segment (USOS) modules. The system uses single-phase liquid ammonia to collect the heat and reject it to six radiators (three on the Starboard side, three on the Port side). Each radiator is made up of eight panels. In September 2008, imagery of the Starboard radiators was conducted and showed one of the panels’ face sheets had peeled up from the internal honeycomb core structure. Out of an abundance of caution, the radiator was isolated from the rest of the EATCS and the ammonia was vented to space. Since the radiator was vented, periodic imagery of all radiator panels was taken to monitor any changes in the face sheet and inspect for other radiator anomalies. In January 2025, after years of trending and inspections, the radiator was reintegrated into the system to increase heat rejection capabilities. This paper will document the multi-year investigation that took place to determine root cause and mitigations implemented to reduce risk to the system. A summary of the data since the investigation will show rationale for reintegrating the radiator even with the damaged panel. The goal of the paper is to document the investigation for historical purposes and provide future programs with findings discovered during the investigation.

Aaron Rodriguez↗

ISS Radiator Face Sheet Anomaly Investigation and Return to Function

Maintaining sufficient heat rejection on the International Space Station (ISS) is critical to the function of the Low-Earth Orbit station. The External Active Thermal Control System (EATCS) rejects the excess heat generated by the US On-Orbit Segment (USOS) modules. The system uses single-phase liquid ammonia to collect the heat and reject it to six radiators (three on the Starboard side, three on the Port side). Each radiator is made up of eight panels. In September 2008, imagery of the Starboard radiators was conducted and showed one of the panels’ face sheets had peeled up from the internal honeycomb core structure. Out of an abundance of caution, the radiator was isolated from the rest of the EATCS and the ammonia was vented to space. Since the radiator was vented, periodic imagery of all radiator panels was taken to monitor any changes in the face sheet and inspect for other radiator anomalies. In January 2025, after years of trending and inspections, the radiator was reintegrated into the system to increase heat rejection capabilities. This paper will document the multi-year investigation that took place to determine root cause and mitigations implemented to reduce risk to the system. A summary of the data since the investigation will show rationale for reintegrating the radiator even with the damaged panel. The goal of the paper is to document the investigation for historical purposes and provide future programs with findings discovered during the investigation.

Aaron Rodriguez↗

AXAF, a permanent orbiting X-ray observatory - Telescope and instrumentation plans

The Advanced X-ray Astrophysics Facility (AXAF) now under study is to be a long-lived X-ray observatory in space. It is to be launched by the Space Shuttle, maintainable on-orbit, and retrievable for ground re-furbishment. The AXAF is conceived as an X-ray telescope with 6 nested grazing incidence X-ray mirrors (with a maximum aperture of 1.2 m) and interchangeable and replaceable focal plane instruments. The optics will provide 0.5 arcsecond imagery over a several arcminute field and somewhat reduced resolution over 1 degree in the X-ray band from 0.1 to 10 keV (1.2 to 120 A). The characteristics and expected performance of the observatory are described.

Zombeck, M. V.↗

AXAF, a permanent orbiting X-ray observatory - Telescope and instrumentation plans

The Advanced X-ray Astrophysics Facility (AXAF) now under study is to be a long-lived X-ray observatory in space. It is to be launched by the Space Shuttle, maintainable on-orbit, and retrievable for ground re-furbishment. The AXAF is conceived as an X-ray telescope with 6 nested grazing incidence X-ray mirrors (with a maximum aperture of 1.2 microns) and interchangeable and repleceable focal plane instruments. The optics will provide 0.5 arcsecond imagery over a several arcminute field and somewhat reduced resolution over 1 degree in the X-ray band from 0.1 to 10 keV (1.2 to 120 A). The characteristics and expected performance of the observatory are described.

Zombeck, M. V.↗

On-Orbit Radiometric Characterization of OLI (Landsat 8) for Applications in Aquatic Remote Sensing

Landsat-8 carries two separate sensors, namely the Operational Land Imager (OLI) and the Thermal Infrared Radiometer Suite (TIRS), that image the earth surface throughout the visible and thermal portions of the spectrum. Compared to Landsat heritage sensors, the OLI has enhanced features, which include its 12-bit radiometric resolution and the addition of a band centered at 443 nm. The dramatically improved data quality/quantity expands existing applications of Landsat imagery in aquatic sciences from the retrieval of bio-geochemical properties, such as near-surface concentrations of chlorophyll-a (CHL) and total suspended solids (TSS), to benthic mapping. This study offers analysis of OLI's absolute radiometric performance over bodies ofwater using benchmark observations, namely the top-of-atmosphere (TOA) ocean color observations and marine in situ radiometric measurements. Sensor-to-sensor comparisons are performed to derive gain factors (g1) from near-concurrent observations in TOA radiance and reflectance domains. The gains in the radiance domain were further validated/adjusted by determining a second set of gains (g2) via analysis of OLI-derived water-leaving radiance, i.e., L(sub w) (gamma), against in situ measurements made either at the Ocean Color AErosol RObotic NETwork (AERONETOC) sites or during field campaigns. The analyses yield the OLI calibration uncertainties that need to be accounted forwhen studying aquatic environments. Itwas found that, for the visible and near-infrared channels, the OLI radiometric responses, on average, are well in agreement (b 2 % discrepancies) with the TOA radiances estimated by ocean color satellites or those predicted by models based onmeasurements of aquatic and atmospheric properties. However, the TOA radiance at the new 443-nm band is found to be, on average, 3.4 % larger than the reference observations. The inter-sensor comparisons in the reflectance domain, however, indicated slightly different results with the OLI responses being low in the blue bands. To enhance the retrieval accuracy of aquatic-science products from OLI datasets, sets of temporally averaged gains (radiance and reflectance) are derived and recommended for use prior to the retrieval of in-water products.

Remote Sensing↗

Status of the MODIS Level 1B Algorithms and Calibration Tables

The Moderate Resolution Imaging Spectroradiometer (MODIS) makes observations using 36 spectral bands with wavelengths from 0.41 to 14.4 m and nadir spatial resolutions of 0.25km, 0.5km, and 1km. It is currently operating onboard the NASA Earth Observing System (EOS) Terra and Aqua satellites, launched in December 1999 and May 2002, respectively. The MODIS Level 1B (L1B) program converts the sensor's on-orbit responses in digital numbers to radiometrically calibrated and geo-located data products for the duration of each mission. Its primary data products are top of the atmosphere (TOA) reflectance factors for the sensor's reflective solar bands (RSB) and TOA spectral radiances for the thermal emissive bands (TEB). The L1B algorithms perform the TEB calibration on a scan-by-scan basis using the sensor's response to the on-board blackbody (BB) and other parameters which are stored in Lookup Tables (LUTs). The RSB calibration coefficients are processed offline and regularly updated through LUTs. In this paper we provide a brief description of the MODIS L1B calibration algorithms and associated LUTs with emphasis on their recent improvements and updates developed for the MODIS collection 5 processing. We will also discuss sensor on-orbit calibration and performance issues that are critical to maintaining L1B data product quality, such as changes in the sensor's response versus scan-angle.

MODIS LEVEL 1B ALGORITHMS↗

A stereo triangulation system for structural identification: Analytical and experimental results

Identification of large space structures' distributed mass, stiffness, and energy dissipation characteristics poses formidable analytical, numerical, and implementation difficulties. Development of reliable on-orbit structural identification methods is important for implementing active vibration suppression concepts which are under widespread study in the large space structures community. Near the heart of the identification problem lies the necessity of making a large number of spatially distributed measurements of the structure's vibratory response and the associated force/moment inputs with sufficient spatial and frequency resolution. In the present paper, we discuss a method whereby tens of active or passive (retro-reflecting) targets on the structure are tracked simultaneously by the focal planes of two or more video cameras mounted on an adjacent platform. Triangulation (optical ray intersection) of the conjugate image centroids yield inertial trajectories of each target on the structure. Given the triangulated motion of the targets, we apply and extend methodology developed by Creamer, Junkins, and Juang to identify the frequencies, mode shapes, and updated estimates for the mass/stiffness/damping parameterization of the structure. The methodology is semi-automated, for example, the post experiment analysis of the video imagery to determine the inertial trajectories of the targets typically requires less than thirty minutes of real time. Using methodology discussed herein, the frequency response of a large number of points on the structure (where reflective targets are mounted) on the structure can be determined from optical measurements alone. For comparison purposes, we also utilize measurements from accelerometers and a calibrated impulse hammer. While our experimental work remains in a research stage of development, we have successfully tracked and stereo triangulated 20 targets (on a vibrating cantilevered grid structure) at a sample frequency of 200 HZ, and have established conclusively the feasibility and desirability of this approach. We discuss, in summary, recent advances in analog and digital video processing methodology, actuation methods, and bring them to bear on the structural identification problem. We include a brief discussion of our experimental hardware and some recent experimental results which support the practical feasibility of this structural vibration sensing approach.

Junkins, J. L.↗

SNPP VIIRS Spectral Bands Co-Registration and Spatial Response Characterization

The Visible Infrared Imager Radiometer Suite (VIIRS) instrument onboard the Suomi National Polar‐orbiting Partnership (SNPP) satellite was launched on 28 October 2011. The VIIRS has 5 imagery spectral bands (I-bands), 16 moderate resolution spectral bands (M-bands) and a panchromatic day/night band (DNB). Performance of the VIIRS spatial response and band-to-band co-registration (BBR) was measured through intensive pre-launch tests. These measurements were made in the non-aggregated zones near the start (or end) of scan for the I-bands and M-bands and for a limited number of aggregation modes for the DNB in order to test requirement compliance. This paper presents results based on a recently re-processed pre-launch test data. Sensor (detector) spatial impulse responses in the scan direction are parameterized in terms of ground dynamic field of view (GDFOV), horizontal spatial resolution (HSR), modulation transfer function (MTF), ensquared energy (EE) and integrated out-of-pixel (IOOP) spatial response. Results are presented for the non-aggregation, 2-sample and 3-sample aggregation zones for the I-bands and M-bands, and for a limited number of aggregation modes for the DNB. On-orbit GDFOVs measured for the 5 I-bands in the scan direction using a straight bridge are also presented. Band-to-band co-registration (BBR) is quantified using the prelaunch measured band-to-band offsets. These offsets may be expressed as fractions of horizontal sampling intervals (HSIs), detector spatial response parameters GDFOV or HSR. BBR bases on HSIs in the non-aggregation, 2-sample and 3-sample aggregation zones are presented. BBR matrices based on scan direction GDFOV and HSR are compared to the BBR matrix based on HSI in the non-aggregation zone. We demonstrate that BBR based on GDFOV is a better representation of footprint overlap and so this definition should be used in BBR requirement specifications. We propose that HSR not be used as the primary image quality indicator, since we show that it is neither an adequate representation of the size of sensor spatial response nor an adequate measure of imaging quality.

Suomi NPP VIIRS↗

Earth Observing-1 Advanced Land Imager: Imaging Performance On-Orbit

This report analyzes the on-orbit imaging performance of the Advanced Land Imager (ALI) on the Earth Observing-1 satellite. The pre-flight calibrations are first summarized. The methods used to reconstruct and geometrically correct the image data from this push-broom sensor are described. The method used here does not refer to the position and attitude telemetry from the spacecraft. Rather, it is assumed that the image of the scene moves across the focal plane with a constant velocity, which can be ascertained from the image data itself. Next, an assortment of the images so reconstructed is presented. Color images sharpened with the 10-m panchromatic band data are shown, and the algorithm for producing them from the 30-m multispectral data is described. The approach taken for assessing spatial resolution is to compare the sharpness of features in the on-orbit image data with profiles predicted on the basis of the pre-flight calibrations. A large assortment of bridge profiles is analyzed, and very good fits to the predicted shapes are obtained. Lunar calibration scans are analyzed to examine the sharpness of the edge-spread function at the limb of the moon. The darkness of the space beyond the limb is better for this purpose than anything that could be simulated on the ground. From these scans, we find clear evidence of scattering in the optical system, as well as some weak ghost images. Scans of planets and stars are also analyzed. Stars are useful point sources of light at all wavelengths, and delineate the point-spread functions of the system. From a quarter-speed scan over the Pleiades, we find that the ALI can detect 6th magnitude stars. The quality of the reconstructed images verifies the capability of the ALI to produce Landsat-type multi spectral data. The signal-to-noise and panchromatic spatial resolution are considerably superior to those of the existing Landsat sensors. The spatial resolution is confirmed to be as good as it was designed to be.

ALI (ADVANCED LAND IMAGER)↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

GOES I/M image navigation and registration

Image Navigation and Registration (INR) is the system that will be used on future Geostationary Operational Environmental Satellite (GOES) missions to locate and register radiometric imagery data. It consists of a semiclosed loop system with a ground-based segment that generates coefficients to perform image motion compensation (IMC). The IMC coefficients are uplinked to the satellite-based segment, where they are used to adjust the displacement of the imagery data due to movement of the imaging instrument line-of-sight. The flight dynamics aspects of the INR system is discussed in terms of the attitude and orbit determination, attitude pointing, and attitude and orbit control needed to perform INR. The modeling used in the determination of orbit and attitude is discussed, along with the method of on-orbit control used in the INR system, and various factors that affect stability. Also discussed are potential error sources inherent in the INR system and the operational methods of compensating for these errors.

Fiorello, J. L., Jr.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-62

A pre-launch debris inspection of the pad and Shuttle vehicle was conducted on 2 March 1994. The detailed walkdown of Launch Pad 39B and MLP-1 also included the primary flight elements OV-102 Columbia (16th flight), ET-62 (LWT 55), and BI-064 SRB's. There were no significant facility or vehicle anomalies. After the launch on March 4th, a debris inspection of Pad 39B was performed. Damage to the pad overall was minimal. On-orbit photographs taken by the flight crew and two films from the ET/ORB umbilical cameras of the External Tank after separation from the Orbiter revealed no major damage or lost flight hardware that would have been a safety of flight concern. Orbiter performance on final approach appeared normal. Infrared imagery of landing gear deployment showed the loss of thermal barrier from the nose gear wheel well. The missing thermal barrier material was not recovered. The Solid Rocket Boosters were inspected at Hanger AF after retrieval. Both frustums had a combined total of 44 MSA-2 debonds over fasteners. Significant amounts of BTA had been applied to closeouts on the RH frustum, forward skirt, and aft skirt. Hypalon paint was blistered/missing over the areas were the BTA had been applied. The underlying BTA was not sooted (IFA STS-62-B-1). Investigation of this condition has concluded there was insufficient heat rates to cause blistering of the Hypalon until late in the ascent phase. A post landing inspection of OV-102 was conducted after the landing at KSC. The Orbiter TPS sustained a total of 97 hits, of which 16 had a major dimension of 1 inch or larger. The Orbiter lower surface had a total of 36 hits, of which 7 had a major dimension of 1 inch or larger. Based on these numbers and comparison to statistics from previous missions of similar configuration, both the total number of debris hits and the number of hits 1 inch or larger was less than average. Six thermal barriers, total size approximately 36 in. x 3 in. x 1.5 in., and one corner tile piece 4 in. x 4 in., were missing from the nose landing gear doors. Runway infrared cameras recorded these objects falling from the Orbiter when the nose landing gear doors were opened on final approach. A search of the area under the flight path failed to recover the missing thermal batteries, which may be submerged in the large body of water south of the runway. The cause for the loss of the material was attributed to the way the substrate was prepared for bonding at the vendor. Orbiter post landing microchemical sample results revealed a variety of residuals in the Orbiter window samples. These were attributed to SRB BSM exhaust, Orbiter TPS, window protective covers and processing, natural landing site products, and paints/primers from various sources. The residual sampling data do not indicate a single source of damaging debris and all of these materials have been documented previously in analyses for post landing sample reports. Data from residual sampling also showed no trends when compared to previous mission data. A total of ten Post Launch Anomalies, including one IFA, were observed during the STS-62 mission assessment.

Katnik, Gregory N.↗

Utilizing HDTV as Data for Space Flight

In the aftermath of the Space Shuttle Columbia accident February 1, 2003, the Columbia Accident Investigation Board recognized the need for better video data from launch, on-orbit, and landing to assess the status and safety of the shuttle orbiter fleet. The board called on NASA to improve its imagery assets and update the Agency s methods for analyzing video. This paper will feature details of several projects implemented prior to the return to flight of the Space Shuttle, including an airborne HDTV imaging system called the WB-57 Ascent Video Experiment, use of true 60 Hz progressive scan HDTV for ground and airborne HDTV camera systems, and the decision to utilize a wavelet compression system for recording. This paper will include results of compression testing, imagery from the launch of STS-114, and details of how commercial components were utilized to image the shuttle launch from an aircraft flying at 400 knots at 60,000 feet altitude. The paper will conclude with a review of future plans to expand on the upgrades made prior to return to flight.

Grubbs, Rodney↗

NPP VIIRS Geometric Performance Status

Visible Infrared Imager Radiometer Suite (VIIRS) instrument on-board the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) satellite is scheduled for launch in October, 2011. It is to provide satellite measured radiance/reflectance data for both weather and climate applications. Along with radiometric calibration, geometric characterization and calibration of Sensor Data Records (SDRs) are crucial to the VIIRS Environmental Data Record (EDR) algorithms and products which are used in numerical weather prediction (NWP). The instrument geometric performance includes: 1) sensor (detector) spatial response, parameterized by the dynamic field of view (DFOV) in the scan direction and instantaneous FOV (IFOV) in the track direction, modulation transfer function (MTF) for the 17 moderate resolution bands (M-bands), and horizontal spatial resolution (HSR) for the five imagery bands (I-bands); 2) matrices of band-to-band co-registration (BBR) from the corresponding detectors in all band pairs; and 3) pointing knowledge and stability characteristics that includes scan plane tilt, scan rate and scan start position variations, and thermally induced variations in pointing with respect to orbital position. They have been calibrated and characterized through ground testing under ambient and thermal vacuum conditions, numerical modeling and analysis. This paper summarizes the results, which are in general compliance with specifications, along with anomaly investigations, and describes paths forward for characterizing on-orbit BBR and spatial response, and for improving instrument on-orbit performance in pointing and geolocation.

Lin, Guoqing↗

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian↗