At least 37 records · Page 2

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Load Shedding for Voltage Regulation With Probabilistic Agent Compliance

With the increased observability and controllability of distribution systems, the share of behind-the-meter systems is trending upwards rapidly. As a consequence, the impact of human behaviors on system performance can no longer be ignored and should be reflected in the energy management system models. In this paper, we discuss the problem of distribution system voltage control by active power curtailment where the agent compliance of the load curtailment signal is probabilistic. We discuss the modeling of the optimal voltage control problem with probabilistic agent compliance as a chance-constrained optimization problem, its tractable safe approximation using convex restriction, and a scenario-based mixed-integer reformulation as well as the associated solution method based on augmented Lagrangian method. The numerical simulation on IEEE test system validates the effectiveness of the proposed approach in obtaining high-quality feasible load curtailment signal with low computational cost, which makes it a viable tool for real time decision making.

augmented Lagrangian method↗

Optimizing Power Line Undergrounding Decisions under Varying Wildfire Risk and Weather Scenarios

Abstract—The threat of wildfire ignitions from electric power equipment has led utilities to increasingly turn to preemptive power shutoffs, which, while effective in reducing grid-induced wildfire risk, can cause significant load loss. Undergrounding power lines is an alternative strategy for preventing grid-induced wildfires. However, undergrounding lines is costly, so an efficient undergrounding plan must balance reductions in wildfire risk and load loss with the cost of undergrounding lines. We propose a robust optimization model to identify which power lines to underground to maximize load served while limiting wildfire risk across a range of wildfire risk and weather scenarios. Since solving this problem may be computationally heavy for large power grids and many operating scenarios, we present a delayed constraint generation algorithm to iteratively add scenarios until an optimal solution is found. We evaluate the performance of this framework on the RTS-GMLC with scenarios representing a year of operating conditions and compare it with a stochastic programming formulation. Our results indicate that our undergrounding model is successful in reducing load shed and risk compared to baseline cases in which no mitigation action is taken and only power shutoffs are implemented (no undergrounding). The robust formulation also reduces more load shed than the stochastic formulation in the most extreme scenarios. Index Terms—grid resilience, optimization, transmission systems, underground power lines, wildfire risk.

Taylor, S. [Department of Electrical and Computer ↗

Proactive Operations and Investment Planning via Stochastic Optimization to Enhance Power Systems’ Extreme Weather Resilience

We present scalable stochastic optimization approaches for improving power systems’ resilience to extreme weather events. We consider both proactive redispatch and transmission line hardening as alternatives for mitigating expected load shed due to extreme weather, resulting in large-scale stochastic linear programs (LPs) and mixed-integer linear programs (MILPs). We solve these stochastic optimization problems with progressive hedging (PH), a parallel, scenario-based decomposition algorithm. Our computational experiments indicate that our proposed method for enhancing power system resilience can provide high-quality solutions efficiently. With up to 128 scenarios on a 2,000-bus network, the operations (redispatch) and investment (hardening) resilience problems can be solved in approximately 6 min and 2 h of wall-clock time, respectively. Additionally, we solve the investment problems with up to 512 scenarios, demonstrating that the approach scales very well with the number of scenarios. Moreover, the method produces high quality solutions that result in statistically significant reductions in expected load shed. Our proposed approach can be augmented to incorporate a variety of other operational and investment resilience strategies, or a combination of such strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs: Preprint

The growing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electrical grids. Oftentimes, this pressure leads to electrical components failures which might ignite wildfires. This work develops a novel model to balance the reliability of power networks operations and risks of wildfires ignition by optimizing the operational schedule of power transmission networks considering time-varying risk measures that consider exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfires risk. The results demonstrate the ability of the model to reduce wildfires risks significantly without considerable load shedding.

energy scheduling↗

Resilient Distribution System Restoration with Equitable Load Shedding

A methodology is proposed for the improvement of electric distribution system resilience to high-impact, low-probability catastrophic events. An approach for dynamic network reconfiguration and coordination of distributed energy resources is introduced to assist in restoration efforts. The problem is formulated as a mixed-integer linear program that minimizes generation costs, the cost of lost load, and costs associated with equitable load shedding, while respecting operational limits of generation, loads, and the network. Constraints are imposed on binary switching variables to ensure equitable load shedding in emergency situations. Numerical validation of the proposed approach is conducted on an example distribution feeder, and case studies are performed to analyze the impact of various parameters in the optimization problem formulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid-RL-MPC4CLR (Hybird-Reinforcement-Learning-Model-Predictive-Control-for-Reserve-Policy-Assisted-Critical-Load-Restoration-in-Distribution-Grids)

Hybrid-RL-MPC4CLR was developed as a hybrid controller for active distribution grid critical load restoration, combining deep reinforcement learning (RL) and model predictive control (MPC) aiming at maximizing total restored load following an extreme event. The RL determines a policy for quantifying operating reserve requirements, thereby hedging against uncertainty, while the MPC models grid operations incorporating the RL policy actions (i.e., reserve requirements), renewable (wind and solar) power predictions, and load demand forecasts. The developers formulated the reserve requirement determination problem as a sequential decision-making problem based on the Markov Decision Process (MDP) and design an RL learning environment based on the OpenAI Gym framework and MPC simulation. The RL agent reward and MPC objective function aim to maximize and monotonically increase total restored load and minimize load shedding and renewable power curtailment. The software is developed using various software packages in Python. The MPC's optimal power flow (OPF) model is implemented using the Pyomo package, the RL simulation environment is implemented using the MPC simulation with various scenarios of renewable energy and load demand profiles and power outage beginning times, based on the OpenAI Gym framework. The RL agent training is performed using the RLlib Ray package. The RL algorithm is trained offline using historical forecasts of renewable generation and load demand profiles. Simulation analysis and performance tests are conducted using a modified IEEE 13-bus distribution test feeder containing wind turbine, photovoltaic, microturbine, and battery.

Eseye, Abinet Tesfaye↗

Dual Impacts of Space Heating Electrification and Climate Change Increase Uncertainties in Peak Load Behavior and Grid Capacity Requirements in Texas

Around 60% of households in Texas currently rely on electricity for space heating. As decarbonization efforts increase, non‐electrified households could adopt electric heat pumps, significantly increasing peak (highest) electricity demand in winter. Simultaneously, anthropogenic climate change is expected to increase temperatures, the potential for summer heat waves, and associated electricity demand for cooling. Uncertainty regarding the timing and magnitude of these concurrent changes raises questions about how they will jointly affect the seasonality of peak demand, firm capacity requirements, and grid reliability. This study investigates the net effects of residential space heating electrification and climate change on long‐term demand patterns and load shedding potential, using climate change projections, a predictive load model, and a direct current optimal power flow (DCOPF) model of the Texas grid. Results show that full electrification of residential space heating by replacing existing fossil fuel use with higher efficiency heat pumps could significantly improve reliability under hotter futures. Less efficient heat pumps may result in more severe winter peaking events and increased reliability risks. As heating electrification intensifies, system planners will need to balance the potential for greater resource adequacy risk caused by shifts in seasonal peaking behavior alongside the benefits (improved efficiency and reductions in emissions).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bi-Level Linear Programming Model for Automatic Load Shedding: A Distributed Wide-Area Measurement System-based Solution

Load shedding is currently implemented as a two-step based approach. In the first step, manual load shedding is taken place, were system operators, using estimates, inform distribution utilities of predicted stressful conditions. Information provided include the potential use of energy reserves, as well as load shedding amount. In a second step, automatic load shedding is done. The latter is realized using protection relays. While considering frequency variation, pre-defined values of load to be shed and correspondent number of stages for such to be realized are transformed into relay settings. Under-frequency protection relays use only local measurements towards decision making, thus operate in a decentralized architecture. Decision making is done in milliseconds plus breaker time. While this approach has provided much system reliability, considering the new smart grid paradigm, where system dynamics are much faster due to increasing renewable resources penetration, in some operating conditions it will generate sub-optimal solutions, such as islanding. Phasor measurement units provide a source of information which can be useful for this problem. Centralized architecture-based solutions for automatic load shedding, as present in the state-of-the-art, require though total processing times which are not acceptable for real-life implementation. In this work, considering the above, a bi-level linear programming model is presented. The model is implemented considering a distributed architecture while leveraging phasor measurement units data. The upper-level model estimates the current system state. Results of this model are embedded in a lower-level model, which decision variables are the location and load value to be shed. Easy-to-implement model, built-on the classic weighted least squares solution, highlight potential aspects towards real-life applications.

Bretas, Arturo Suman↗

Managing Wildfire Risk and Promoting Equity through Optimal Configuration of Networked Microgrids

As climate change increases the risk of large-scale wildfires, wildfire ignitions from electric power lines are a growing concern. To mitigate the wildfire ignition risk, many electric utilities de-energize power lines to prevent electric faults and failures. These preemptive power shutoffs are effective in reducing ignitions, but they could result in wide-scale power outages. Advanced technology, such as networked microgrids, can help reduce the size of the resulting power outages; however, even microgrid technology might not be sufficient to supply power to everyone, thus forcing hard questions about how to prioritize the provision of power among customers. In this paper, we present an optimization problem that configures networked microgrids to manage wildfire risk while maximizing the power served to customers; however, rather than simply maximizing the amount of power served in kilowatts, our formulation also considers the ability of customers to cope with power outages, as measured by social vulnerability, and it discourages the disconnection of particularly vulnerable customer groups. To test our model, we leverage a synthetic but realistic distribution feeder, along with publicly available social vulnerability indices and satellite-based wildfire risk map data, to quantify the parameters in our optimal decision-making model. Our case study results demonstrate the benefits of networked microgrids in limiting load shed and promoting equity during scenarios with high wildfire risk.

distribution systems↗

The LSBmax algorithm for boosting resilience of electric grids post (N‐2) contingencies

Abstract A computationally improved algorithm is presented to find the best transmission switching (TS) candidate for boosting resilience of electricity grids subject to ( N ‐2) contingencies. Here, resilience is computed as the reduction in load shed after the above‐mentioned ( N‐ ) contingencies. TS is a planned line outage, and past research shows that changing the transmission system's topology changes the power flow and removes post contingency violations. Finding the best TS candidate in a computationally suitable time for effectively boosting resilience is a challenge. The best TS candidate is found using a novel heuristic method by decreasing the search space based on proximity to the bus with the maximum load shedding (LSB). The LSB algorithm is faster than existing algorithms in the literature; and, it is compatible with both the AC and DC optimal power flow formulations. To validate the authors' claims of speedup and accuracy, two metrics are used to analyze the results from the IEEE 39‐bus and 118‐bus systems. Finally, the inherent parallelism of the LSB algorithm is leveraged on a high‐performance computing platform and applied to the large‐scale Polish 2383‐bus test system to validate scalability in both size and speedup in computation time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CRADA Number NFE-19-07846 with Grid Fruit, LLC (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-19-07846 between Oak Ridge National Laboratory (ORNL) and Grid Fruit, LLC (Grid Fruit) focused on simulating, monitoring, and adjusting controls of commercial refrigerator and freezer systems to provide load flexibility and demand response services from these machines. Viewing these medium and low-temp coolers as thermal masses, the volumes of chilled air in these coolers make them time-shiftable loads ripe for deployment at optimal times. Grid Fruit is a startup company developing methods to schedule the chilling cycles (e.g., in “build load” and “shed load” grid events) to provide energy efficiency, peak shifting, and other benefits both to the grid and the broader environment. These benefits can be magnified by coordinating chillers with HVAC, lights, computers, and other loads. Grid Fruit completed simulations and then selected and ordered controls hardware to prove the technology were successful, but the diversity of chiller models in the field without digital controls, as well as limited market demand at present, make further exploration necessary before commercialization.

42 ENGINEERING↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Cascading Outages in Severe Weather Using Simulation-Based Optimization

Severe weather events can trigger cascading power outages and lead to significant losses. In this work, we investigate cascading outage mitigation under severe weather conditions. Given day-ahead weather forecasts and component failure models, we aim to identify a set of power lines that can be hardened to minimize the expected impact of potential cascading outages. Since the expected load shedding cannot be expressed as an explicit function of line hardening decisions and system states, we developed a cascading outage simulator to estimate the expected value of load shedding under various initial weather-related disruption scenarios generated using a weather forecast. To avoid massive enumeration of all possible combinations of line hardening decisions and reduce the simulation efforts, we employed an efficient simulation-based optimization approach that quickly identifies the (near) optimal line hardening decisions in the presence of both large simulation noises due to the highly variable initial disturbances and system states, and significant randomness in the subsequent cascades. Furthermore, the algorithm is also able to utilize parallel computing to dramatically reduce computation time to support decision making in preparation for severe weather conditions. We performed a case study on the Northeast Power Coordinating Council (NPCC) 140-bus system model to demonstrate that our approach can significantly improve power grid resilience to adverse weather events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unsteady aerodynamic loads on pitching aerofoils represented by Gaussian body force distributions

The actuator line model (ALM) is an approach commonly used to represent lifting and dragging devices like wings and blades in large-eddy simulations (LES). The crux of the ALM is the projection of the actuator point forces onto the LES grid by means of a Gaussian regularisation kernel. The minimum width of the kernel is constrained by the grid size; however, for most practical applications like LES of wind turbines, this value is an order of magnitude larger than the optimal value that maximises accuracy. This discrepancy motivated the development of corrections for the actuator line, which, however, neglect the effect of unsteady spanwise shed vorticity. In this work we develop a model for the impact of spanwise shed vorticity on the unsteady loading of an aerofoil modelled as a Gaussian body force distribution, where the model is applicable within the regime of unsteady attached flow. The model solution is derived both in the time and frequency domain and features an explicit dependence on the Gaussian kernel width. We verify the model with ALM-LES for both pitch steps and periodic pitching. The model solution is compared with Theodorsen theory and validated with both computational fluid dynamics using body fitted grids and experiment. It is concluded that the optimal kernel width for unsteady aerodynamics is approximately 40 % of the chord. The ALM is able to predict the magnitude of the unsteady loading up to a reduced frequency of 𝑘 ≈ 0.2.

17 WIND ENERGY↗

Learning and Fast Adaptation for Grid Emergency Control via Deep Meta Reinforcement Learning

As power systems are undergoing a significant transformation with more uncertainties, less inertia and closer to operation limits, there is increasing risk of large outages. Thus, there is an imperative need to enhance grid emergency control to maintain system reliability and security. Towards this end, great progress has been made in developing deep reinforcement learning (DRL) based grid control solutions in recent years. However, existing DRL-based solutions have two main limitations: 1) they cannot handle well with a wide range of grid operation conditions, system parameters, and contingencies; 2) they generally lack the ability to fast adapt to new grid operation conditions, system parameters, and contingencies, limiting their applicability for real-world applications. Here, in this paper, we mitigate these limitations by developing a novel deep meta-reinforcement learning (DMRL) algorithm. The DMRL combines the meta strategy optimization together with DRL, and trains policies modulated by a latent space that can quickly adapt to new scenarios. We test the developed DMRL algorithm on the IEEE 300-bus system. We demonstrate fast adaptation of the meta-trained DRL polices with latent variables to new operating conditions and scenarios using the proposed method, which achieves superior performance compared to the state-of-the-art DRL and model predictive control (MPC) methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Best of Both Worlds: Combined Thermal and Battery Storage for Widespread Building Decarbonization

To meet 2050 decarbonization targets, widespread building electrification is a critical complement to clean power generation. Behind-the-meter storage (BTMS) (e.g., battery electric energy storage [EES] and thermal energy storage [TES]) integrated with buildings or building end uses to store and supply energy at optimal times can minimize burdens associated with operation, planning, and upgrades to the electrical grid sometimes triggered by building electrification. Such BTMS systems can serve the dual purpose of providing enhanced resilience at the building and grid level, and support the deployment of renewable generation needed for wide-scale decarbonization. While TES can cost-effectively shed and shift thermal loads, it cannot generally backup or shift non-thermal building end uses. EES, by contrast, is more expensive, but applicable to all end uses (i.e., thermal and electrical loads). Combined together, these storage systems can be traded off against one another to perform optimally in meeting demand flexibility, decarbonization goals, and energy resilience of the buildings at a lower total system cost. This paper proposes a framework to define BTMS benefits, provides four illustrative electrification scenarios using TES and EES, and discusses the combined TES/EES benefits with building energy modeling results. The paper also highlights potential barriers to adoption of BTMS and a path forward.

buildings↗