Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Massively Parallel Dantzig-Wolfe Decomposition Applied to Traffic Flow Scheduling

Optimal scheduling of air traffic over the entire National Airspace System is a computationally difficult task. To speed computation, Dantzig-Wolfe decomposition is applied to a known linear integer programming approach for assigning delays to flights. The optimization model is proven to have the block-angular structure necessary for Dantzig-Wolfe decomposition. The subproblems for this decomposition are solved in parallel via independent computation threads. Experimental evidence suggests that as the number of subproblems/threads increases (and their respective sizes decrease), the solution quality, convergence, and runtime improve. A demonstration of this is provided by using one flight per subproblem, which is the finest possible decomposition. This results in thousands of subproblems and associated computation threads. This massively parallel approach is compared to one with few threads and to standard (non-decomposed) approaches in terms of solution quality and runtime. Since this method generally provides a non-integral (relaxed) solution to the original optimization problem, two heuristics are developed to generate an integral solution. Dantzig-Wolfe followed by these heuristics can provide a near-optimal (sometimes optimal) solution to the original problem hundreds of times faster than standard (non-decomposed) approaches. In addition, when massive decomposition is employed, the solution is shown to be more likely integral, which obviates the need for an integerization step. These results indicate that nationwide, real-time, high fidelity, optimal traffic flow scheduling is achievable for (at least) 3 hour planning horizons.

Rios, Joseph Lucio↗

Optimal scheduling for profit maximization of energy storage merchants considering market impact based on dynamic programming

This paper analyzes how electricity merchants' market impact affects merchants' profit. Energy storage has long been studied for its role in maximizing profit, and merchant decisions are assumed to have no impact on market prices. However, the trading decisions of large-scale energy storage merchants (e.g., pumped storage hydro) will affect the market prices. This paper employs dynamic programming theory to investigate merchants' optimal economic dispatch considering the market impact and physical characteristics of storage systems. Our findings show that the State-of-Charge (SOC) based analytical solution significantly facilitates energy storage merchants' decision-making. The SOC range is segmented into three regions by two optimal SOC reference points, which depend on the available energy in storage, given prices, and market impact. By comparing the current storage SOC with the reference points, the merchant can get the corresponding optimal actions. We analytically show that if the merchant neglects the market impact on the power market, she will exaggerate her expected profit when the price-taker and price-maker merchants have the same generating and pumping upper limits offered to Independent System Operators (ISOs). Furthermore, the profit-maximizing merchant must, therefore, assay to balance the trade-off correctly between the intensity of market impact and the dispatched power. Our findings are verified by numerical simulation, and results demonstrate the ramifications for electricity merchants in energy arbitrage decisions.

25 ENERGY STORAGE↗

Tri-level hybrid interval-stochastic optimal scheduling for flexible residential loads under GAN-assisted multiple uncertainties

Various building loads, such as heating, ventilation, and air conditioners (HVACs), electric water heaters (EWHs), and electric vehicles (EVs), can introduce opportunities for improving the flexibility of electricity consumption while satisfying the needs of building owners as well as benefiting the resilience of distribution system. To utilize such flexibility, a tri-level distribution market framework is established, including residential consumers, load aggregators (LAs), and the distribution system operator (DSO). In this work, the uncertainties from all three levels are considered. The random consumption behavior at the consumer level is modeled as a Gaussian noise that is also aggregated and transmitted to the LA level. The weather temperature in the LA level is forecasted as an interval, and the photovoltaic (PV) power in the market-clearing level is modeled by a set of power scenarios generated by Generative Adversarial Networks (GANs). Then, a hybrid interval-stochastic programming is proposed to transform the uncertain problems in the first two levels into deterministic ones. For real-time implementations, a rolling horizon optimization (RHO) scheme is employed to continuously optimize the power consumption based on the latest operating information. Finally, case studies on a modified IEEE 69-bus system validate the effectiveness of the proposed uncertainty modeling strategies and the RHO scheme.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs

The increasing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electric grids. Often, this pressure leads to electrical component failures, which might ignite wildfires. This work develops a novel model to balance the reliability of power network operations and the risk of wildfire ignition by opti- mizing the operational schedule of power transmission networks considering time-varying risk measures that include exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfire risk. The results demonstrate the ability of the model to significantly reduce wildfire risk without considerable load shedding.

power systems operations↗

On optimal scheduling and air traffic control in the near terminal area

A scheme is proposed for automated air traffic control of landing aircraft in the vicinity of the airport. Each aircraft is put under the control of an airport-based computer as soon as it enters the near-terminal area (NTA). Scheduling is done immediately thereafter. The aircraft is given a flight plan which, if followed precisely, will lead it to the runway at a prespecified time. The geometry of the airspace in the NTA is chosen so that delays are executed far from the outer marker, and violations of minimum altitude and lateral separations are avoided. Finally, a solution to the velocity mix problem is proposed.

Sarris, A. H.↗

Integrated Arrival and Departure Schedule Optimization Under Uncertainty

In terminal airspace, integrating arrivals and departures with shared waypoints provides the potential of improving operational efficiency by allowing direct routes when possible. Incorporating stochastic evaluation as a post-analysis process of deterministic optimization, and imposing a safety buffer in deterministic optimization, are two ways to learn and alleviate the impact of uncertainty and to avoid unexpected outcomes. This work presents a third and direct way to take uncertainty into consideration during the optimization. The impact of uncertainty was incorporated into cost evaluations when searching for the optimal solutions. The controller intervention count was computed using a heuristic model and served as another stochastic cost besides total delay. Costs under uncertainty were evaluated using Monte Carlo simulations. The Pareto fronts that contain a set of solutions were identified and the trade-off between delays and controller intervention count was shown. Solutions that shared similar delays but had different intervention counts were investigated. The results showed that optimization under uncertainty could identify compromise solutions on Pareto fonts, which is better than deterministic optimization with extra safety buffers. It helps decision-makers reduce controller intervention while achieving low delays.

stochastic optimization↗

Guidance for Developing Digital Twins for Online Condition Monitoring of Nuclear Power Plant Components

Online condition monitoring is an area of active research that may enable optimized scheduling, maintenance, and safety of nuclear power plant components, reducing unnecessary derates while simultaneously improving operational capacity. Digital twins (DTs) are one avenue to conduct online condition monitoring and are currently being explored by national laboratories and universities alike. DTs for online condition monitoring are, in essence, state concurrent models that emulate a physical process which predicts a parameter and compares it against a measured value. The promise of DT is that they may provide additional insights by combining and interpreting various sources of information and may be used for preventative maintenance scheduling optimization or early fault detection. DTs for condition monitoring are projected to be valuable for meeting requirements under 10 CFR 50.55a and 10 CFR 50.65. However, DT technologies are still under significant development and the process for developing a DT for condition monitoring has not been formalized. Therefore, in this work, we present an initial framework for developing a DT, discuss and review the various challenges and considerations for DT deployment, and identify the opportunities that a DT can improve. Here, the presented framework is intended to help developers formulate a strategy when approaching DT development for condition monitoring. A DT use case for a reactor coolant pump is presented to demonstrate the proposed framework.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Digital-Twin-Enabling Technologies for Online Condition Monitoring of Nuclear Power Plant Components

Online condition monitoring is an area of active research that may enable optimized scheduling, maintenance, and safety of nuclear power plant components, reducing unnecessary derates while simultaneously improving operational capacity. Digital twins (DTs) are one avenue to conduct online condition monitoring and are currently being explored by national laboratories and universities alike. DTs for online condition monitoring are, in essence, state concurrent models that emulate a physical process which predicts a parameter and compares it against a measured value. A DT’s goal is to provide additional insights by combining and interpreting various sources of information for preventative maintenance scheduling optimization or early fault detection. DTs for condition monitoring are projected to be valuable for meeting requirements under 10 CFR 50.55a, “Codes and Standards,” and 10 CFR 50.65, “Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants”. However, DT technologies are still under significant development, and the process for developing a DT for condition monitoring has not been formalized. Therefore, in this work, we present an initial framework for developing a DT, discuss and review the various challenges and considerations for DT deployment, and identify the opportunities that a DT can improve. The presented framework is intended to help developers formulate a strategy when approaching DT development for condition monitoring. In conclusion, a DT use case for a reactor coolant pump is presented to demonstrate the proposed framework.

advanced sensor instrumentation↗

Polyhedral Relaxations for Optimal Pump Scheduling of Potable Water Distribution Networks

The classic pump scheduling or optimal water flow (OWF) problem for water distribution networks (WDNs) minimizes the cost of power consumption for a given WDN over a fixed time horizon. In its exact form, the OWF is a computationally challenging mixed-integer nonlinear program (MINLP). It is complicated by nonlinear equality constraints that model network physics, discrete variables that model operational controls, and intertemporal constraints that model changes to storage devices. To address the computational challenges of the OWF, this paper develops tight polyhedral relaxations of the original MINLP, derives novel valid inequalities (or cuts) using duality theory, and implements novel optimization-based bound tightening and cut generation procedures. The efficacy of each new method is rigorously evaluated by measuring empirical improvements in OWF primal and dual bounds over 45 literature instances. The evaluation suggests that our relaxation improvements, model strengthening techniques, and a thoughtfully selected polyhedral relaxation partitioning scheme can substantially improve OWF primal and dual bounds, especially when compared with similar relaxation-based techniques that do not leverage these new methods.

bound tightening↗

A prototype combinatorial scheduler for space-borne observational instruments

A prototype scheduler has been developed for observations to be carried out by the NASA Gamma Ray Observatory. The purpose of the scheduling system is to provide an automated method to determine optimized schedules conforming to all scheduling guidelines. Strategies used in creating COMPTEL/EGRET schedules and in scheduling OSSE targets are examined. It is concluded that the hybrid scheduler creates optimal schedules, or very nearly optimal schedules, and reduces the estimated scheduling time by 18 or 19 orders of magnitude, from about 10 to the 14th years to as few as 561 seconds.

Gilstrap, Lewey O.↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

Integration of Uncertain Ramp Area Aircraft Trajectories and Generation of Optimal Taxiway Schedules at Charlotte Douglas (CLT) Airport

The integration of aircraft maneuver characteristics into an optimal taxiway scheduling solution is challenging due to the uncertainties that are intrinsic to ramp area aircraft trajectories. To address the challenge, we build a stochastic model of ramp area aircraft trajectories that is used to generate a probabilistic measure of conflict within the Charlotte Douglas International Airport (CLT) ramp area. Parameters of the conflict distributions are estimated and passed to a Mixed Integer Linear Program that solves for an optimal taxiway schedule constrained to be conflict free in the presence of trajectory uncertainties. Here we extend our previous research by accounting for departing and arriving aircraft whereas our prior formulation only accounted for departing aircraft.

taxiway schedule↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SMART-COM – Scalable Multi-Agent Adaptive Resolution Tools for Collaborative Outage Management

The purpose of this grant was to conduct scientific research and prototype applications to support NPP outage staff in their adaptive decision-making in efficient scheduling and resource allocation while preventing violation of safety technical specifications. The project contributed to scientific knowledge and engineering methods in (1) user interface design, (2) scheduling optimization and risk estimation, and (2) natural language processing that would benefit the nuclear power plants in minimizing schedule overruns and even unexpected shutdowns. The research team conducted site visits at a test reactor facility and an operating nuclear power plant to gather necessary information and inputs for research and development of a software application to support NPP staff in executing their outages. The final software application consisted of three modules. First, the natural language processing module supports interactive processing of technical documentation to build a database for outage staff to query non-permissible actions on system components. This module can alleviate outage staff from reviewing extensive documentation and minimize violation of technical specifications, especially in time-sensitive situations. Second, the schedule optimization module schedules outage activities and compute risk indices that outperform existing software and current practice. This module can reduce completion time of an outage that typically have too many activities for human to optimize based on current practice that does not apply the latest operations research. Finally, the visualization module presents progress and risk information of the overall outage and individual activities, as well as enabling access to the natural language processing and schedule optimization modules. This module can provide outage staff with situation awareness that are necessary to make risk-informed decisions in response to unexpected events during the execution of an outage.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal Energy Scheduling and Sensitivity Analysis for Integrated Power-Water-Heat Systems

The conventionally independent power, water, and heating networks are becoming more tightly connected, which motivates their joint optimal energy scheduling to improve the overall efficiency of an integrated energy system. However, such a joint optimization is known as a challenging problem with complex network constraints and couplings of electric, hydraulic, and thermal models that are nonlinear and nonconvex. We formulate an optimal power-water-heat flow (OPWHF) problem and develop a computationally efficient heuristic to solve it. The proposed heuristic decomposes OPWHF into subproblems, which are iteratively solved via convex relaxation and convex-concave procedure. Simulation results validate that the proposed framework can improve operational flexibility and social welfare of the integrated system, wherein the water and heating networks respond as virtual energy storage to time-varying energy prices and solar photovoltaic generation. Moreover, we perform sensitivity analysis to compare two modes of heating network control: by flow rate and by temperature. Our results reveal that the latter is more effective for heating networks with a wider space of pipeline parameters.

24 POWER TRANSMISSION AND DISTRIBUTION↗