Search NASA⌕ Search

SEARCH · Search NASA

Results for “pass/fail data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

23 records · Page 2

Definition and Demonstration of a Methodology for Validating Aircraft Trajectory Predictors

This paper presents a new methodology for validating an aircraft trajectory predictor, inspired by the lessons learned from a number of field trials, flight tests and simulation experiments for the development of trajectory-predictor-based automation. The methodology introduces new techniques and a new multi-staged approach to reduce the effort in identifying and resolving validation failures, avoiding the potentially large costs associated with failures during a single-stage, pass/fail approach. As a case study, the validation effort performed by the Federal Aviation Administration for its En Route Automation Modernization (ERAM) system is analyzed to illustrate the real-world applicability of this methodology. During this validation effort, ERAM initially failed to achieve six of its eight requirements associated with trajectory prediction and conflict probe. The ERAM validation issues have since been addressed, but to illustrate how the methodology could have benefited the FAA effort, additional techniques are presented that could have been used to resolve some of these issues. Using data from the ERAM validation effort, it is demonstrated that these new techniques could have identified trajectory prediction error sources that contributed to several of the unmet ERAM requirements.

Vivona, Robert A.↗

Implementation of Leak Test Methods for the International Space Station (ISS) Elements, Systems and Components

The International Space Station (ISS has Qualification and Acceptance Environmental Test Requirements document, SSP 41172 that includes many environmental tests such as Thermal vacuum & Cycling, Depress/Repress, Sinusoidal, Random, and Acoustic Vibration, Pyro Shock, Acceleration, Humidity, Pressure, Electromatic Interference (EMI)/Electromagnetic Compatibility (EMCO), etc. This document also includes (13) leak test methods for Pressure Integrity Verification of the ISS Elements, Systems, and Components. These leak test methods are well known, however, the test procedure for specific leak test method shall be written and implemented paying attention to the important procedural steps/details that, if omitted or deviated, could impact the quality of the final product and affect the crew safety. Such procedural steps/details for different methods include, but not limited to: - Sequence of testing, f or example, pressurization and submersion steps for Method I (Immersion); - Stabilization of the mass spectrometer leak detector outputs fo r Method II (vacuum Chamber or Bell jar); - Proper data processing an d taking a conservative approach while making predictions for on-orbit leakage rate for Method III(Pressure Change); - Proper Calibration o f the mass spectrometer leak detector for all the tracer gas (mostly Helium) Methods such as Method V (Detector Probe), Method VI (Hood), Method VII (Tracer Probe), Method VIII(Accumulation); - Usage of visibl ility aides for Method I (Immersion), Method IV (Chemical Indicator), Method XII (Foam/Liquid Application), and Method XIII (Hydrostatic/Visual Inspection); While some methods could be used for the total leaka ge (either internal-to-external or external-to-internal) rate requirement verification (Vacuum Chamber, Pressure Decay, Hood, Accumulation), other methods shall be used only as a pass/fail test for individual joints (e.g., welds, fittings, and plugs) or for troubleshooting purposes (Chemical Indicator, Detector Probe, Tracer Probe, Local Vacuum Chamber, Foam/Liquid Application, and Hydrostatic/Visual Inspection). Any isolation of SSP 41172 requirements have led to either retesting of hardware or accepting a risk associated with the potential system or component pressure integrity problem during flight.

Underwood, Steve↗

James Webb Space Telescope Deployment Brushless DC Motor Characteristics Analysis

A DC motor's performance is usually characterized by a series of tests, which are conducted by pass/fail criteria. In most cases, these tests are adequate to address the performance characteristics under environmental and loading effects with some uncertainties and decent power/torque margins. However, if the motor performance requirement is very stringent, a better understanding of the motor characteristics is required. The purpose of this paper is to establish a standard way to extract the torque components of the brushless motor and gear box characteristics of a high gear ratio geared motor from the composite geared motor testing and motor parameter measurement. These torque components include motor magnetic detent torque, Coulomb torque, viscous torque, windage torque, and gear tooth sliding torque. The Aerospace Corp bearing torque model and MPB torque models are used to predict the Coulomb torque of the motor rotor bearings and to model the viscous components. Gear tooth sliding friction torque is derived from the dynamo geared motor test data. With these torque data, the geared motor mechanical efficiency can be estimated and provide the overall performance of the geared motor versus several motor operating parameters such as speed, temperature, applied current, and transmitted power.

Tran, Ahn N.↗

Standard Testing Procedure for Quantifying Breathing Gas Carbon Dioxide Partial Pressure for Extravehicular Activity and Launch, Entry, Survival Pressure Suits

This standard test and analysis protocol establishes the procedure for determining the partial pressure of inspired carbon dioxide (PICO2) exposure level experienced by persons operating a pressurized suit. The purpose of this Standard Testing Procedure (STP) is to describe the test conditions and procedures necessary to acquire data in support of certification that manufacturer submitted Extravehicular Activity (EVA) and/or Launch, Entry, Survival (LES) suit designs maintain safe levels of carbon dioxide (CO2) in the helmet during suited operations. The STP shall be used to measure the in-suit inhaled and exhaled dry-gas partial pressure of CO2 (PCO2), followed by calculation of the water vapor saturated PICO2 during the inhalation portion of the breathing cycle, while a human test subject is performing work at levels anticipated during suited operations in ground and flight environments. The procedure is designed to test the evaluated suit on a human test subject as a dynamic system, generate repeatable results under defined laboratory conditions, and perform consistent analysis on acquired samples.This STP is used to evaluate space suits in a hyperbaric environment (above atmospheric pressure). Changes would need to be made to the test equipment/setup to accommodate a hypobaric environment. There is no specific EVA or LES suit performance requirement to meet or pass/fail criteria associated with this STP.

Bekdash, Omar↗

Are Soft Short Tests Good Indicators of Internal Li-ion Cell Defects?

The self discharge test at full state of charge, may not be a good one to detect subtle defects since the li-ion chemistry has the highest self discharge at full state of charge. One should characterize self discharge versus storage time for each cell manufacturer/design to differentiate between normal self discharge and that due to a subtle manufacturing defect. The various soft short test methods indicate that if this test is carried out at full discharge (0% SOC) with all capacity removed (by lowering the current load in a stepwise manner to the same end of discharge voltage), then the cells need to be placed in storage for more than 72 hours to get a good analysis on the presence of subtle defects since it takes more than 72 hours to achieve voltage stabilization. If the cells are to be charged up even to a small percentage (ex. 1%), 72 hours are sufficient to determine issues. However, the pass/fail criteria should be based on a valid OCV decline. Less than 10 mV voltage decline is not a good method to detect subtle defects. As mentioned in the first bullet, self discharge is a competing reaction when a charge is introduced and hence a characterization of the self discharge versus storage time is required to fully correlate voltage decline to a failure due to a subtle defect. Soft short test method cannot be relied on for defect detection because cells with and without voltage decline seemed to have similar defects and characteristics. Screening methods such as internal resistance and capacity as well as a 3-sigma range for OCV, mass and dimensions should be used to screen out outliers. A very critical aspect in the understanding of subtle defects is to carry out destructive analysis of cells from every lot to confirm the quality of production and screen all cells and batteries in a stringent manner to have a high quality set of flight cells. Self Discharge Test: Fully charged cells shall be placed in Open circuit stand for 72 hours (OCV measurement twice a day); continue for total of 14 days with 1 reading per day 2. Soft Short Test 1: Fully charge; cells discharged to manufacturer's end of disch. Voltage (EODV) cutoff at C/5 rate; stand for 30 minutes; discharge with C/500 to the same EODV. stand for another 30 minutes; discharge the cells again using C/1000 current to the same EODV. OCV measurements twice a day for 72 hours and then for total of 14 days (data collection same as in 1.) 3. Soft Short Test 2: Fully charge; cells discharged to the manuf. EODV with a C/13 constant current; provide a 10 hour rest, discharge again to the same EODV with a current of C/250, provide a 10 hour rest, discharge again using a C/250 rate, provide a 24 hour rest, charge using C/250 to 3.15 V (for ~12 hours). OCV measurements twice a day for at 72 hours. (data collection same as in 1.) 4. Soft Short Test 3: Fully charge; cells shall be discharged using C/10 current to manuf. EODV. Allow the cell to remain at Open circuit for 10 seconds. Discharge the cell at C/20 rate to the same EODV, hold open circuit for 24 hours. Discharge the cells at C/200 rate to the same end of voltage cutoff and hold open circuit for 24 hours. Discharge the cells one more time at C/200 rate to the same EODV and hold open circuit for 36 hours. Charge at C/200 rate to 3.15 V and hold for 3 days. Record OCV during the open circuit stand periods every 12 hours and at the beginning and end of the 3 day hold (include the 12 hour OCV recording during this time also). Capacity Cycling: Cells with declining voltages - one cell from each manufacturer chosen for cycling Destructive Physical Analysis (DPA): Cells with and without decline chosen from each lot for DPA.

Jeevarajan, J.↗