Search NASA⌕ Search

SEARCH · Search NASA

Results for “performance qualifiers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Prompt-delayed $\gamma$-ray spectroscopy with AGATA, EXOGAM and VAMOS++

Here, a new experimental setup to measure prompt-delayed γ-ray coincidences from isotopically identified fission fragments, over a wide time range of 100ns-200μ s, is presented. The fission fragments were isotopically identified, on an event-by-event basis, using the VAMOS++ large acceptance spectrometer. The prompt γ rays emitted at the target position and corresponding delayed γ rays emitted at the focal plane of the spectrometer were detected using, respectively, thirty two crystals of the AGATA γ-ray tracking array and seven EXOGAM HPGe Clover detectors. Finally, fission fragments produced in fusion and transfer-induced fission reactions, using a 238 U beam at an energy of 6.2 MeV/u impinging on a 9 Be target, were used to characterize and qualify the performance of the detection system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗

Status of the INFN LASA in-kind contribution to PIP-II project

The status of INFN LASA in-kind contribution to the PIP-II project at Fermilab is reported in this paper. The effort for the series production of the 38 INFN LASA designed, 5-cell cavities with beta 0.61 for the LB650 section of the linac commenced and the status of ongoing activities and major procurements is here conveyed. At the same time, preliminary tests on INFN LB650 cavity prototypes are progressing in order to optimize the complete preparation and qualification cycle. All cavities will be produced, and surface treated in industry to reach the unprecedented performances required, qualified through vertical cold test at state-of-the art infrastructures and delivered as installation ready at the string assembly site.

43 PARTICLE ACCELERATORS↗

STC Qualification Tests of PIP-II HB650 Cavities

Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q₀ > 3.3 · 10^{z}EhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. The Fermilab Spoke Test Cryostat (STC) has been upgraded to accommodate testing of 650 MHz cavities. Commissioning of upgraded STC has been reported at SRF’19 conference. In this paper we present results of testing of the prototype HB650 cavity in upgraded STC facility. We characterize cavity performance and qualify it for the prototype HB650 cryomodule assembly.

43 PARTICLE ACCELERATORS↗

Building America Best Practices Series: Volume 17 - Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

This guide will help contractors and homeowners identify ways to make their homes more comfortable, more energy efficient, and healthier to live in. It also identifies the steps to take, with the help of a qualified home performance contractor, to increase their home’s insulation, ensure healthy levels of ventilation, and prevent moisture problems. Contractors can use this document to explain the value of these insulation measures to their customers. The references in this document provide further explanation of insulation techniques and technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Validation of Printed Strain Gauges at Moderate Temperatures (up to 300°C)

Strain gauges in material test reactors serve to generate critical mechanical property data for qualifying the performance of reactor components. Resistance based strain gauge technologies are both well established and commercially available; however, they present limitations in terms of reactor experiment conditions, especially in areas where physical space is a challenge. In this work, an additively manufactured capacitance-based strain gauge was printed on a stainless-steel specimen and tested at up to the prototypic pressurized-water reactor operating temperature of 300°C. In addition, a high-temperature resistive strain gauge (RSG) was used to better understand how the RSGs operate, and to provide baseline measurements for comparison against the printed strain gauges. Future development of printed strain gauges will focus on expanding their temperature limits to 500°C and enabling applications currently beyond the capabilities of commercial RSGs.

36 MATERIALS SCIENCE↗

Load Test of Alum-a-Lift Serial No. 33053261

An Alum-A-Lift A800CSPD-60 (Lift) was procured to support mechanical testing of programmatic equipment. This testing will take place within the Bldg. 131 Hi Bay. The design of the Lift procured for the purposes at LLNL was a modification of a machine that had previously been engineered and sold by Alum-a-Lift, see Fig. 1. The modification was to shorten the boom from a 56 in. length to a 28 in. length. The modified design is illustrated in Fig. 2. The Lift was fabricated and shipped to LLNL, received ~ June 2022. Upon arrival, it was successfully evaluated for “no-load” performance capability. Upon inspection of the documentation provided by Alum-a-Lift, it was noted that the load test was performed to qualify the machine for a lifting capacity of 200 lb. The LLNL requirement was that the capacity of the machine be 400 lb. Conversations with the vendor, Alum-A-Lift, followed this discovery. Rather than send the machine back to the vendor for load testing, discussions concurred that LLNL would load test the machine and Alum-A-Lift would provide the relevant load test placard to be placed on the machine subsequent to the successful load test. This MESN provides documentation of the load test to qualify the Alum-a-Lift to its’ rated capacity of 400 lb.

42 ENGINEERING↗

NREL 25-cm2 High-Pressure Low-Temperature Electrolysis Cell Hardware (Open Source)

This data resource describes an open-source cell hardware that enables low temperature electrolysis (LTE) testing at elevated pressures. Existing commercial options have several downsides when it comes to R&D testing. They are often not designed for repeated reassembly, may not be able to accommodate porous transport layers with different thicknesses, and do not give state-of-the-art performance. Therefore, this hardware was developed specifically with LTE R&D in mind and its design is being made available to the global LTE community. This work was planned and funded by the U.S. Department of Energy's H2NEW consortium (https://h2new.energy.gov/). The hardware design package (.zip file) details the drawings, auxiliary materials, and procedures required to fabricate, assemble, and operate the National Renewable Energy Laboratory's (NREL's) high-pressure low-temperature electrolysis cells. While the hardware itself—end plates, current collectors, flow fields, bolts and washers, tube fittings—is always the same, the assembly and operating procedures may change depending on the active materials being tested, especially for the membrane. Material-specific assembly and operating procedures will be posted to the H2NEW website as they are developed and validated. Disclaimer: The documents and drawings included in this download package describe a design for a low temperature electrolysis hardware that is intended to comply with leak testing according to ASME B31.1. Safe operation at ambient and elevated pressures is the sole responsibility of the end user, which should be evaluated on a case-by-case basis for each individual cell. Factors affecting the sealing capability may depend on, for example, machining quality, cell assembly components, operating conditions, and operating history. Operation at pressure should only be performed on qualified test stands by qualified operators. NREL/ALLIANCE FOR SUSTAINABLE ENERGY, LLC/DOE DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, AND MAKES NO WARRANTY AS TO THE ACCURACY, COMPLETENESS, OR USEFULNESS OF ANY INFORMATION PROVIDED HEREIN. USE OF THIS PACKAGE IS AT THE USER’S OWN RISK.

08 HYDROGEN↗

Analysis of NSTX Upgrade OH Magnet and Center Stack

The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drilling reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

In Search of Excellence and Equity in Physics

Equal opportunity is central to the concept of meritocracy. Opportunity and leadership should go to the people most qualified by performance, and not on the basis of arbitrary or irrelevant attributes. This principle is arguably most important for high-level leadership due to their outsized impact on the field. At the moment, many in the community perceive that the choice of leaders is infused with a lack of meritocracy and too often driven by cronyism. This is possibly a reason why far worse underrepresentation persists than could be expected from a functioning meritocracy. If we want to change this, we need to change our behavior, i.e., practices.

Barzi, Emanuela (ORCID:0000000158292147)↗

Application Of The ASME Boiler And Pressure Vessel Code In The Design Of SSR Cryomodule Beamlines For PIP-II Project At Fermilab

This contribution reports the design of the main components used to interconnect SRF cavities and superconducting focusing lenses in the SSR Cryomodule beamlines, developed in the framework of the PIP-II project at Fermilab. The focus of the present contribution is on the design and testing of the edge-welded bellows according to ASME Boiler and Pressure Vessel Code. The activities performed to qualify the bellows to be assembled in cleanroom, for operation in high vacuum, cryogenic environments, and their characterization from magnetic standpoint, will also be presented.

43 PARTICLE ACCELERATORS↗

Verification of the Serpent-Griffin Workflow using the SNAP 8 Experimental Reactor

The Systems for Nuclear Auxiliary Power (SNAP) program accumulated extensive experimental measurements over a span of 15 years. This work builds upon previous studies which validated Serpent against experimental data for various criticality configurations of the SNAP 8 Experimental Reactor (S8ER). A 2-stage sequence is applied here with Serpent used for the generation of few-group cross sections and Griffin as the transport eigenvalue solver. Sensitivity studies are performed to qualify the effect and uncertainty of various parameters, comparing against reference models for the S8ER. The results from this work will then be expanded to create a generalized methodology for the Serpent-Griffin 2-stage approach for microreactor applications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transitioning from Construction to Startup at WTP from a Plant Engineering Perspective - 16461

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind facility being designed, built and commissioned for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to solidify liquid radioactive waste stored in underground tanks at the Hanford Site. WTP consists of 20 infrastructure facilities and structures, known as Balance of Facilities, designed to support the Plant's four major facilities - Pretreatment Facility, High-Level Waste Vitrification Facility, Low-Activity Waste Vitrification Facility and the Analytical Laboratory. As construction moves toward startup and commissioning, a turnover process facilitates the transition of facilities and systems between organizations. The transition from Construction is initiated by an approved Design Completion List, which documents that design and construction have been completed, and the facility or system is ready for startup testing. Qualified individuals perform an inspection to ensure the facility or system has been constructed per the design during an eight-week engineering walk-down. During this phase in turnover, Plant Engineering personnel are responsible for updating and maintaining the Master Equipment List, developing spare parts recommendations, developing and issuing instrument calibration data sheets, evaluating temporary modifications, and supporting plant operations and maintenance activities. As of 2015, two electrical switchgear buildings and the non-radioactive liquid waste disposal system have been turned over from Construction to Startup. This paper discusses the turnover process, organizational interfaces, and experiences from a Plant Engineering perspective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guideline for Performing Systematic Approach to Evaluate and Qualify Legacy Documents that Support Advanced Reactor Technology Activity

The establishment of a systematic process for the evaluation of historic technology information for use in advanced reactor licensing is described. Efforts are underway to recover and preserve Experimental Breeder Reactor II and Fast Flux Test Facility historical data. These efforts have generally emphasized preserving information from data-acquisition systems and hard-copy reports and entering it into modern electronic formats suitable for data retrieval and examination. The guidance contained in this document has been developed to facilitate consistent and systematic evaluation processes relating to quality attributes of historic technical information (with focus on sodium-cooled fast reactor (SFR) technology) that will be used to eventually support licensing of advanced reactor designs. The historical information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The evaluation process is prescribed in terms of SFR technology, but the process can be used to evaluate historical information for any type of advanced reactor technology. An appendix provides a discussion of typical issues that should be considered when evaluating and qualifying historical information for advanced reactor technology fuel and source terms, based on current light water reactor (LWR) requirements and recent experience gained from Next Generation Nuclear Plant (NGNP).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data Analysis for the Born Qualified Grand LDRD Project

This report summarizes the data analysis activities that were performed under the Born Qualified Grand Challenge Project from 2016 - 2018. It is meant to document the characterization of additively manufactured parts and processes for this project as well as demonstrate and identify further analyses and data science that could be done relating material processes to microstructure to properties to performance.

42 ENGINEERING↗

Automated qualification and analysis of protective spark gaps for DC accelerators

Protective spark gaps are used in the high voltage multiplier column of a 3 MeV DC Accelerator to prevent excessive voltage build-ups. Precise gap of 5 mm is maintained between the electrodes in these spark gaps for obtaining 120 kV± 5 kV in 6 kg/cm{sup 2} SF{sub 6} environment which is the dielectric medium. There are 74 such spark gaps used in the multiplier. Each spark gap has to be qualified for electrical performance before fitting in the accelerator to ensure reliable operation. As the breakdown voltage stabilizes after a large number of sparks between the electrodes, the qualification process becomes time consuming and cumbersome. For qualifying large number of spark gaps an automatic breakdown analysis setup has been developed. This setup operates in air, a dielectric medium. The setup consists of a flyback topology based high voltage power supply with maximum rating of 25 kV. This setup works in conjunction with spark detection and automated shutdown circuit. The breakdown voltage is sensed using a peak detector circuit. The voltage breakdown data is recorded and statistical distribution of the breakdown voltage has been analyzed. This paper describes details of the diagnostics and the spark gap qualification process based on the experimental data. (author)

43 PARTICLE ACCELERATORS↗