Search NASA⌕ Search

SEARCH · Search NASA

Results for “phase 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Prevalence of pretransition disordering in the rutile-to- CaCl 2 phase transition of GeO 2

WE report the ability to tailor a material's electronic properties using density driven disordering has emerged as a powerful route to materials design. The observation of anomalous structural and electronic behavior in the rutile to CaCl 2 phase transition in SnO 2 led to the prediction that such behavior is inherent to all oxides experiencing such a phase transition sequence [Smith et al., J. Phys. Chem. Lett. 10, 5351 (2019)]. Here, the ultrawide band gap semiconductor GeO 2 is confirmed to exhibit anomalous behavior during the rutile to CaCl 2 phase transition. A phase pure rutile GeO 2 sample synthesized under high-pressure, high-temperature conditions is probed using synchrotron diffraction and x-ray and optical spectroscopy under high pressure conditions. Density functional theory calculations show that the enthalpic barrier to displacing an oxygen along the B 1g librational mode decreases with pressure leading up to the rutile to CaCl 2 phase transition. The band structure of the distorted state shows that such oxygen displacements form small polarons.

36 MATERIALS SCIENCE↗

Emerging technologies and approaches to minimize discharges into Lake Michigan, phase 2 module 4 report.

The Great Lakes Initiative (GLI) established the new water quality-based discharge criteria for mercury (Hg), thereby increasing the need for many municipal and industrial wastewater treatment plants in the region to lower the mercury in their effluents. Information on deployable technologies to satisfy these requirements for industrial and municipal dischargers in the Great lakes region is scarce. Therefore, BP funded Purdue University Calumet and Argonne to identify deployable Hg removal technologies to meet the GLI discharge criterion at its Whiting Refinery in Indiana. The joint PUC/Argonne project was divided into 2 phases. Results from Phase I and Phase II Modules 1-3 have been previously reported. This report summarizes the work done in Phase 3 Module 4, which consisted of the pilot scale testing of Hg removal technologies previously selected in Module 3. The pilot testing was an Argonne/PUC jointly directed project that was hosted at and funded by the BP refinery in Whiting, IN. As two organizations were involved in data analysis and interpretation, this report combines two independent sets of evaluations of the testing that was done, prepared respectively by Argonne and Purdue. Each organization retains sole responsibility for its respective analysis conclusions and recommendations. Based on Module 3 bench testing with pre-Effluent To Lake (pre-ETL) and clarifier effluent (CE) samples from the Whiting refinery, three different technologies were chosen for pilot testing: (1) Ultrafiltration (using GE ZeeWeed(reg sign) Technology, 0.04 {mu}m pore size and made up of PVDF) for particulate mercury removal; (2) Adsorption using Mersorb(reg sign) LW, a sulfur-impregnated activated carbon, for dissolved mercury removal if present and (3) The Blue PRO(reg sign) reactive filtration process for both particulate and dissolved (if present) mercury removal. The ultrafiltration and the Blue PRO(reg sign) reactive filtration pilot studies were done simultaneously at the BP Whiting refinery using a slipstream of wastewater taken just prior to the Effluent to lake (pre-ETL) outfall. It was the intention of this pilot testing to demonstrate proof of concept, i.e. can the discharge limits obtained at bench scale be consistently met at the pilot scale. Although Mersorb(reg sign) LW was selected for dissolved mercury removal testing, this technology was not pilot tested because of a lack of dissolved mercury in the test wastewater during the pilot study. The overall objective of this pilot testing was to demonstrate the effectiveness of the tested technologies with continuous and varying feed conditions to meet the GLI criterion (1.3 ppt). Optimization for full-scale design was outside of the scope of this work. In addition to demonstrating whether the Hg criterion can be met, information on residue generation rate, frequency of backwashing and other maintenance issues were collected to better understand the implications for a full-scale system.

54 ENVIRONMENTAL SCIENCES↗

ITER Core Imaging X-Ray Spectrometer Conceptual Design and Performance Assessment - Phase 2

During Phase 2 of our study of the CIXS conceptual design we have tackled additional important issues that are unique to the ITER environment. These include the thermal control of the crystal and detector enclosures located in an environment with a 100-250 C ambient temperature, tritium containment, and the range of crystal and detector movement based on the need for spectral adjustments and the desire to make measurements of colder plasmas. In addressing these issues we have selected a ''Dewar''-type enclosure for the crystals and detectors. Applying realistic view factors for radiant heat and making allowance for conduction we have made engineering studies of this enclosure and showed that the cooling requirements can be solved and the temperature can be kept sufficiently constant without compromising the specification parameters of the CIXS. We have chosen a minimum 3 mm combined thickness of the six beryllium windows needed in a Dewar-type enclosure and showed that a single window of 0.5 mm thickness satisfies tritium containment requirements. For measuring the temperature in cooler ITER plasmas, we have chosen to use the K-shell lines of Fe24+. Iron is the preferred choice because its radiation can be analyzed with the identical CIXS settings used for analyzing the tungsten radiation, i.e., essentially no adjustments besides a simple crystal rotation need to be made. We have, however, included an xy{theta}-drive motor arrangement in our design for fine adjustments and full rotation of the crystal mounts.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Remote sensing of hydrologic variables in boreal areas, phase 2

During Phase 2 airborne Gamma Radiation measurements were conducted over 48 BOREAS (boreal ecosystem atmosphere study) flight lines. Ground measurements of the soil moisture (SM) of the mineral soil and the depth and water content (WC) of the moss/humus layer were collected for calibration of the flight lines. Special attention has been given to the flight lines over, and near, the primary tower sites in the southern study area (SSA); Old Black Spruce (OBS), Old Jack Pine, Old Aspen, and Young Aspen. Multiple ground surveys (September 1993, July, August, and September 1994) show the variation of the water content of the moss/humus layers and changes in the amount of standing water near the SSA OBS tower during the period September 1993 to September 1994. All ground data, airborne estimates and locations of flight lines and ground sampling points have been submitted to BORIS (BOREAS Information System). On 8-10 September 1994 exceptionally high values of cosmic radiation were observed by the airborne gamma radiation system over the SSA. Follow up investigation has not determined the source of, or what caused, the high cosmic count rates.

Peck, Eugene L.↗

NASA Hybrid Thermally Efficient Core (HyTEC) Phase 2 Q3’GFY25 to Q2’GFY26 Unlimited Rights Annual Report for CLIN 1 and 2

The HyTEC Phase 2 Project focuses on the development and demonstration of high-power density, small engine core gas turbine engine technologies. The focus of HyTEC on these small engine core technologies will provide direct benefits to the next single-aisle class aircraft in terms of thermal efficiency, as well as integrate with other technologies, through increased hybridization, as they mature to provide substantial continuous fuel burn reductions during the aircraft lifecycle. These advances will strengthen the US position in the commercial aviation engine market and enable cost benefits in commercial aviation. In Government fiscal year 26 the HyTEC Project was closed and contract moved to the Subsonic Vehicle Technologies and Tools Project. GE Aerospace is executing two major work plans as part of the HyTEC Phase 2 contract. The first is Contract Line-Item Number (CLIN) 001 and its objective is to mature High Pressure Turbine (HPT) aerodynamics technology to TRL 5 through multiple rigs so that it may be incorporated into a complete TRL 6 evaluation and unlock learnings for the engine core demonstration as applicable. CLIN 002, the second work plan, is to design, procure and test a cost shared portion of technologies on the TRL6 Compact Core test vehicle. The compact core demonstrated through HyTEC Phase 2 along with the HPT rig TRL advancement directly matures the technologies being developed as part of the CFM RISE demonstrator program which is targeting a more than 20% fuel burn reduction at the engine level versus today’s state of the art. The RISE program’s objective is to advance both the novel Open Fan architecture, compact core technologies and advanced systems such as hybrid electric needed to achieve the desired fuel burn reduction to TRL6 ahead of a new product introduction in the single-aisle class aircraft in the 2030s timeframe.

gas turbine engine↗

Flow interaction experiment. Volume 2: Aerothermal modeling, phase 2

An experimental and computational study is reported for the flow of a turbulent jet discharging into a rectangular enclosure. The experimental configurations consisting of primary jets only, annular jets only, and a combination of annular and primary jets are investigated to provide a better understanding of the flow field in an annular combustor. A laser Doppler velocimeter is used to measure mean velocity and Reynolds stress components. Major features of the flow field include recirculation, primary and annular jet interaction, and high turbulence. A significant result from this study is the effect the primary jets have on the flow field. The primary jets are seen to create statistically larger recirculation zones and higher turbulence levels. In addition, a technique called marker nephelometry is used to provide mean concentration values in the model combustor. Computations are performed using three levels of turbulence closures, namely k-epsilon model, algebraic second moment (ASM), and differential second moment (DSM) closure. Two different numerical schemes are applied. One is the lower-order power-law differencing scheme (PLDS) and the other is the higher-order flux-spline differencing scheme (FSDS). A comparison is made of the performance of these schemes. The numerical results are compared with experimental data. For the cases considered in this study, the FSDS is more accurate than the PLDS. For a prescribed accuracy, the flux-spline scheme requires a far fewer number of grid points. Thus, it has the potential for providing a numerical error-free solution, especially for three-dimensional flows, without requiring an excessively fine grid. Although qualitatively good comparison with data was obtained, the deficiencies regarding the modeled dissipation rate (epsilon) equation, pressure-strain correlation model, and the inlet epsilon profile and other critical closure issues need to be resolved before one can achieve the degree of accuracy required to analytically design combustion systems.

Nikjooy, M.↗

Brain-wave measures of workload in advanced cockpits: The transition of technology from laboratory to cockpit simulator, phase 2

The present Phase 2 small business innovation research study was designed to address issues related to scalp-recorded event-related potential (ERP) indices of mental workload and to transition this technology from the laboratory to cockpit simulator environments for use as a systems engineering tool. The project involved five main tasks: (1) Two laboratory studies confirmed the generality of the ERP indices of workload obtained in the Phase 1 study and revealed two additional ERP components related to workload. (2) A task analysis' of flight scenarios and pilot tasks in the Advanced Concepts Flight Simulator (ACFS) defined cockpit events (i.e., displays, messages, alarms) that would be expected to elicit ERPs related to workload. (3) Software was developed to support ERP data analysis. An existing ARD-proprietary package of ERP data analysis routines was upgraded, new graphics routines were developed to enhance interactive data analysis, and routines were developed to compare alternative single-trial analysis techniques using simulated ERP data. (4) Working in conjunction with NASA Langley research scientists and simulator engineers, preparations were made for an ACFS validation study of ERP measures of workload. (5) A design specification was developed for a general purpose, computerized, workload assessment system that can function in simulators such as the ACFS.

Horst, Richard L.↗

Western Wind and Solar Integration Study Phase 2 (Presentation)

This presentation accompanies Phase 2 of the Western Wind and Solar Integration Study, a follow-on to Phase 1, which examined the operational impacts of high penetrations of variable renewable generation on the electric power system in the West and was one of the largest variable generation studies to date. High penetrations of variable generation can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 calculated these costs and emissions, and simulated grid operations for a year to investigate the detailed impact of variable generation on the fossil-fueled fleet. The presentation highlights the scope of the study and results.

14 SOLAR ENERGY↗

Orbit transfer rocket engine technology program. Phase 2: Advanced engine study

In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.

Erickson, C.↗

Space transfer vehicle concepts and requirements study, phase 2

This final report is a compilation of the Phase 1 and Phase 2 study findings and is intended as a Space Transfer Vehicle (STV) 'users guide' rather than an exhaustive explanation of STV design details. It provides a database for design choices in the general areas of basing, reusability, propulsion, and staging; with selection criteria based on cost, performance, available infrastructure, risk, and technology. The report is organized into the following three parts: (1) design guide; (2) STV Phase 1 Concepts and Requirements Study Summary; and (3) STV Phase 2 Concepts and Requirements Study Summary. The overall objectives of the STV study were to: (1) define preferred STV concepts capable of accommodating future exploration missions in a cost-effective manner; (2) determine the level of technology development required to perform these missions in the most cost effective manner; and (3) develop a decision database of programmatic approaches for the development of an STV concept.

Cannon, Jeffrey H.↗

Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 1: Executive summary

The LAWS phase 1 and phase 2 studies have been completed on schedule and have led to significant advances in CO2 laser development. The Phase 2 Design Definition Study has shown that a large scanning mirror/high pulse energy laser LAWS Instrument is feasible and within the existing technology. The capability to monitor wind velocities with backscatter ratios of 10(exp 11) m(exp -1) SR(exp -1) is feasible. The weight budget allocated for the baseline LAWS is adequate, and sufficient reserves exist with the potential downsized configuration. With the possible decrease in available power from the baseline of 2.2 kW guideline, power and shot management is critical for the baseline configuration (15 to 20 J). This is particularly true during the 100 day occultation period each year. With the downsized configurations (5 to 7 J), power management is still necessary during the occultation but is primarily limited to shot management over the polar regions. The breadboard effort has produced significant laser advances for a tight 18 month schedule and the minimum budgets available from NASA, Lockheed, and TDS. Using the NASA funds and Lockheed and TDS fixed assets budgets, the breadboard was designed, fabricated, and brought on-line with first laser light within 16 months after ATP. First laser beam was obtained on 21 April 1992 at a 5 J power level. Tests since then have been conducted at sustained, repetitive pulse levels of over 7 J and 20 Hz. This is an increase of over two or three times greater than any system previously developed from this type laser. Increased power levels and additional life tests will be accomplished in the next LAWS phase. The Lockheed LAWS design will operate in the gravity gradient mode on-orbit, and all possible instrument vibration and jitter modes have been considered. Adequate pointing stability and control is state-of-the-art technology for the critical time periods, frequency rates, and control responses required by LAWS. Lockheed recommends a 6-1/2 year phase C/D program for LAWS to provide adequate feedback from the engineering unit and the qualification unit to the final flight unit. Assuming a one year period for LAWS integration to the spacecraft, followed by a six-month period for launch vehicle integration, LAWS could be successfully developed and launched in eight years. Our baseline design or downsized design can be accommodated by either the Atlas 2AS or the Delta launch vehicles. Lockheed's recommendation is that, based on the successful phase 2 design study and breadboard program, a follow-on 18 month extended breadboard testing program and additional system engineering studies, primarily in interfacing with a to be defined platform, be initiated. This should be immediately followed by the phase C/D program, leading to a LAWS launch in late 2001 or early 2002.

Source record↗

Bagnold Dunes Campaign Phase 2: Visible/Near-Infrared Reflectance Spectroscopy of Longitudinal Ripple Sands

As part of the Phase 2 Bagnold Dune campaign at Gale Crater, Mars, constraints on the geochemistry, mineralogy, and oxidation state of pristine and disturbed linear sand ripples were made using visible/near–infrared spectral observations for comparison to Phase 1 spectra of the barchan dunes to the north. Spectra acquired by the ChemCam and Mastcam instruments (400–1,000 nm) at four Phase 2 locations revealed similar overall spectral trends between the two regions, but most Phase 2 sands were redder in the visible wavelengths. The majority of targets exhibited lower red/infrared ratios, higher ~530–nm band depths, and higher red/blue ratios than Phase 1 samples, suggesting a greater proportion of redder, fine–grained, ferric sands in Phase 2 samples. Here, this is consistent with the slightly greater proportion of hematite in Phase 2 samples as determined from CheMin analyses of the Ogunquit sands, which may reflect contamination from the surrounding hematite–bearing Murray formation bedrock.

58 GEOSCIENCES↗

Enhanced HLW Glass Property-Composition Models – Phase 2

As a continuation of the Phase 1 HLW model development work as part of a phased approach to enhance and expand HLW glass property-composition models, additional data were collected for the HLW glass dataset and used to revise the models developed during Phase 1. These data are for glasses that are collectively referred to as ORP-2014 glasses. The sources of additional data for the Phase 2 work included: (i) actively designed glasses formulated to support various glass studies at VSL since the completion of Phase 1; and (ii) glasses from two statistically designed matrices to supplement the existing HLW compositional space. The Phase 2 matrix design was intended to augment and improve the coverage in the high aluminum region.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The phase 2 NRA

We present points of special interest to potential proposers for the Compton Observatory Phase 2 Guest Investigator (GI) program. A general summary of some of the most important details of the phase 2 NASA Research Announcement (NRA) is followed by an enumeration of the modes of participation and proposal types available to GI proposers. Finally, the method which is planned for the selection of the Phase 2 Guest Investigators in parallel with the development of a preliminary Phase 2 observing timeline is outlined. The ways in which the selection of targets by GI's could be affected by the Phase 2 timeline development procedure is described.

Chipman, Eric↗