Search NASA⌕ Search

SEARCH · Search NASA

Results for “post-launch anomalies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

25 records · Page 2

Prelaunch and On-Orbit Electronic Calibration for Earth Observing Instruments

"The Electronic Calibration (Ecal) tests are performed during various stages of instrument development to examinethe linearity of the instrument electronics. During this process, charges with stepwise increments are injected inthe analog electronics circuitry to generate a ramp signal that can be used to characterize any nonlinearities in theelectronics. The prelaunch characterization of MODIS (on the Terra and Aqua platforms) and VIIRS (on SNPP,JPSS-1 and JPSS-2) involved a regular evaluation of the electronics linearity using the Ecal tests. On orbit,the Ecal tests have been regularly performed over the mission for both the MODIS instruments to derive theelectronics gain and linearity. Unlike MODIS, the Ecal tests on the VIIRS instruments are performed on an as-needed basis. To date, no Ecal tests were performed for S-NPP VIIRS on orbit. The VIIRS instrument on JPSS-1(now NOAA 20) was launched on November 18, 2017. An Ecal test was performed to support the instrumentsinitial post-launch performance assessment. Shortly after the first on-orbit emissive band calibration, degradationin the instrument gain was observed for the LWIR bands (M15, M16 and I5). As a part of the investigationrelated to this anomaly, a second Ecal test was performed and results were compared with the prelaunch results.In this paper, we discuss the prelaunch Ecal tests and representative results from MODIS and VIIRS prelaunchcharacterization. Also, discussed are the on-orbit results from the two MODIS instruments as well as from therecently launched VIIRS instrument."

ECAL↗

Reliability inputs to Mariner 9 data explosion

This paper describes the prelaunch and post-launch reliability functions which contributed to the success of the Mariner 9 spacecraft. Examples are included to illustrate how each reliability activity was a vital part of each phase of the project. Prelaunch reliability functions included: (1) establishing, negotiating, and monitoring system and subsystem requirements, (2) participating in spacecraft system and subsystem design/hardware reviews, (3) monitoring preparation of failure mode effects and criticality analyses (FMECA), (4) establishing and managing a problem failure reporting (PFR) system for the spacecraft and its support equipment, (5) monitoring electronic parts activities, and (6) participating in spacecraft reviews. Particular emphasis is placed on mission operations reliability assurance activities, which included: (1) spacecraft problem/failure reporting, (2) managing an integrating failure reporting system which covered all mission operations activities, (3) real-time analysis of spacecraft anomalies, and (4) risk assessment.

Macgregor, D. S.↗

Heat Capacity Mapping Radiometer (HCMR) data processing algorithm, calibration, and flight performance evaluation

The rationale and procedures used in the radiometric calibration and correction of Heat Capacity Mapping Mission (HCMM) data are presented. Instrument-level testing and calibration of the Heat Capacity Mapping Radiometer (HCMR) were performed by the sensor contractor ITT Aerospace/Optical Division. The principal results are included. From the instrumental characteristics and calibration data obtained during ITT acceptance tests, an algorithm for post-launch processing was developed. Integrated spacecraft-level sensor calibration was performed at Goddard Space Flight Center (GSFC) approximately two months before launch. This calibration provided an opportunity to validate the data calibration algorithm. Instrumental parameters and results of the validation are presented and the performances of the instrument and the data system after launch are examined with respect to the radiometric results. Anomalies and their consequences are discussed. Flight data indicates a loss in sensor sensitivity with time. The loss was shown to be recoverable by an outgassing procedure performed approximately 65 days after the infrared channel was turned on. It is planned to repeat this procedure periodically.

Bohse, J. R.↗

Scientific and technical support for the Galileo net flux radiometer experiment

This report describes work supported by a post-launch grant (NCC 2-679) that originally covered the period from 1 January 1990 through 31 December 1992. This was extended an additional nine months at no cost until 30 September 1993, and once more until to 30 November 93. A final report on the effort from 1 January 1990 through 30 November 1993 (anticipated) is provided following the background discussion. Tasks required during the post launch period are briefly as follows: (1) attend PSG (Project Science Group) meetings; (2) support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); (3) organize and maintain documentation; (4) finish calibration measurements, documentation, and analysis; (5) characterize and diagnose instrument anomalies; (6) develop descent data analysis tools; and (7) science data analysis and publication. The following sections provide background information on the NFR instrument followed by the complete progress report.

Sromovsky, Lawrence A.↗

Space Technology 5 Post-Launch Ground Attitude Estimation Experience

The Space Technology (ST)-5 satellites were launched March 22, 2006 on a Pegasus XL launch vehicle into a Sun-synchronous orbit. The three micro-satellites which constituted the ST-5 mission were kept in a formation which allowed three successive measurements taken of the Earth s magnetic field in order to study short term fluctuations of the field. The attitude of each satellite was computed on the ground using data from the science grade magnetometer as well as the miniature spinning Sun sensor (MSSS) which was the primary attitude sensor. Attitude and orbit maneuvers were performed using a single axial cold gas thruster. This paper describes the ground attitude estimation process and performance as well as anomaly resolutions.

Harman, Richard R.↗

GOES-16 Magnetometers Anomaly Solar-Angle Based Characterization and Correction

GOES-R launched aboard an Atlas V 541 rocket from Space Launch Complex-41 at Cape Canaveral Air Force Station, Florida, on November 19, 2016. The first satellite in the series, GOES-R, was renamed GOES-16 upon reaching geostationary orbit GOES-16 at GOES-Checkout location (89.5 degrees West Longitude) during PLT (Post-Launch Testing). The GOES-16 magnetometer boom was deployed on December 7, 2016 and magnetometer checkout began. GOES-16 replaced GOES-13 as NOAA's operational GOES-East satellite on December 18, 2017. The GOES-16 satellite operational location (GOES-East) is at 75.2 degrees West Longitude.

Magnetometers↗

On-Orbit Calibration Assessment of NOAA-21 VIIRS Thermal Emissive Bands and Implications for JPSS-4 VIIRS

The Visible Infrared Imaging Radiometer Suite (VIIRS) instrument onboard the NOAA-21 (N21) satellite has been successfully operating for over three years collecting valuable scientific measurements. A large suite of weather forecasting models and scientific research applications are supported with the VIIRS measurements from N21 combined with those acquired from the VIIRS instrument onboard the S-NPP and NOAA-20 spacecraft. Among the 22 VIIRS spectral bands, there are seven thermal emissive bands (TEB) covering the 3.7 to 12.2 µm spectral range at two different spatial resolutions. The VIIRS TEB detectors are calibrated onboard using a blackbody at a controlled temperature and a space view for background signal measurement. In this paper, we discuss the on-orbit performance of the N21 VIIRS TEB using various parameters such as the detector gain, noise, and offset. This on-orbit assessment provides critical insights into instrument behavior and calibration performance that will inform pre-launch testing and post-launch validation strategies for the upcoming JPSS-4 VIIRS mission scheduled for launch in 2027. The methodologies and lessons learned from characterizing the N21 TEB performance will enable more efficient and comprehensive radiometric assessment of the next VIIRS instrument. Specific focus is placed on identifying performance trends and anomaly signatures observed during the N21 commissioning phase that can enhance the JPSS4 instrument checkout procedures and accelerate the transition to routine on-orbit operations. The established performance baselines and uncertainty estimates will serve as an acceptance criterion for the JPSS-4 commissioning activities, ensuring mission readiness and data continuity for operational users.

Amit Angal↗