Search NASA⌕ Search

SEARCH · Search NASA

Results for “post-separation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

19 records · Page 2

Preliminary Node Separation Orbit Determination Analysis for the HelioSwarm Observatory

The HelioSwarm Observatory is a nine-spacecraft swarm design, consisting of one Hub and eight Node spacecraft co-orbiting the Earth in a ~13.7-day orbit. Each Node separates from the Hub during the Node Commissioning Phase, and the Nodes’ sole source of tracking is inter-satellite relative ranging with the Hub. This study characterizes how soon the relative ranging should occur post-separation to maintain a reasonable knowledge of the Nodes’ position relative to the hub and quantifies how often, and at what measurement cadence, relative ranging needs to occur during the early days of commissioning.

orbit determination↗