Search NASA⌕ Search

SEARCH · Search NASA

Results for “power grid simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Model based co-simulation platform for integrated building system control and design optimization

Both steady-state and dynamic simulations have been widely used by HVAC&R industry to support product/equipment development for decades. Steady-state simulation focuses on the system mass, energy and momentum balance of an equilibrium state. It is based on high-fidelity components models, and thus is suitable for system and component design optimization. Dynamic simulation studies the system transient response and is generally used for controls development and verification. It usually does not require rigorous component models of high accuracy because 1) the commonly used PID control is feedback control whose control performance evaluation doesn’t require high fidelity system/plant model; 2) high-fidelity dynamic model significantly increases the number of equations and variables and creates tremendous challenge for math solver. For supervisory control, transactive control or optimization of an integrated building system, the HVAC&R equipment is often one of the sub-components to be controlled. High-fidelity equipment models are required for accurately evaluating control strategies. In addition, building equipment manufacturers have developed a lot of high-fidelity steady-state equipment/component models per their expertise. Thus, a platform that can integrate OEM high-fidelity steady-state model with dynamic building simulation and/or electric power system & grid simulation to support the development and verification of supervisory control for integrated building systems is necessary. In this study, ORNL’s heat pump design tool (HPDM) is utilized to develop a co-simulation platform for supervisory control and optimization in integrated building systems. It is based on a model that integrates high-fidelity steady-state simulation equipment models with dynamic building simulation. A practical case of using the proposed co-simulation platform to develop and evaluate the supervisory control and optimization is presented and discussed.

Sun, Jian↗

Short-term wind forecasting using statistical models with a fully observable wind flow

The utility of model output data from the Weather Research and Forecasting mesoscale model is explored for very short-term forecasting (5-30 minutes horizon) of wind speed to be used in large scale simulations of an autonomous electric power grid. Using this synthetic data for the development and evaluation of short-term forecasting algorithms offer many unique advantages over observational data, such as the ability to observe the full wind flow field in the surrounding region. Several short-term forecasting algorithms are implemented and evaluated using the synthetic data at several different time horizons and for three different geographic locations. Comparison is made with observational data from one location. We find that short-term forecasts of the synthetic data considering wind flow from the surrounding region perform 26% better than persistence in terms of root mean square error at the 5-minute time horizon. This improvement is comparable to studies of observational data in the literature. These results provide motivation to use synthetic data for short term forecasting in grid simulations, and open the door to future algorithmic improvements.

17 WIND ENERGY↗

Control and Simulation of a Grid-Forming Inverter for Hybrid PV-Battery Plants in Power System Black Start

Power system restoration is an important part of system planning. Power utilities are required to maintain black start capable generators that can energize the transmission system and provide cranking power to non-blackstart capable generators. Traditionally, hydro and diesel units are used as black start capable generators. With the increased penetration of bulk size solar farms, inverter based generation can play an important role in faster and parallel black start thus ensuring system can be brought back into service without the conventional delays that can be expected with limited black start generators. Inverter-based photovoltaic (PV) power plants have advantages that are suitable for black start. This paper proposes the modeling, control, and simulation of a grid-forming inverter-based PV-battery power plant that can be used as a black start unit. The inverter control includes both primary and secondary control loops to imitate the control of a conventional synchronous machine. The proposed approach is verified using a test system modified from the IEEE 9-bus system in the time-domain electromagnetic transient simulation tool PSCAD. The simulation results shows voltage and frequency stability during a multi-step black-start and network energization process.

Nguyen, Quan H.↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

EMT Simulation of Large PV Plant & Power Grid for Disturbance Analysis

One of the challenges faced during the analysis of various disturbances with inverter-based resources is the ability to replicate the same disturbance in simulations. The main issue arises from lack of electromagnetic transient (EMT) models and adequate fidelity of models. To overcome this problem, in this paper, EMT simulation of power grid and one of the affected photovoltaic (PV) plants is performed to replicate the observations during the Angeles Forest disturbance in 2018. The processes to (i) develop the EMT model of the power grid from traditional transient stability (TS) data, and (ii) develop high-fidelity EMT model of PV plant from data collected on a PV plant are described in the paper. The requirements in the high-fidelity EMT model of the PV plant are also described. Finally, simulation of the Angeles Forest disturbance is performed and similar simulation results (as compared to the observed disturbances) are observed.

Debnath, Suman↗

Applied Mathematics Challenge: Simulation of Power Electronics in Future Power Grid

There has been a buzz around increased grid modernization for more than a decade. Grid modernization includes, but is not limited to, upgrades to the grid to enhance reliability, resilience, security, and access to clean energy sources. One significant change that has been happening in this context is the increased penetration of computing power and controlled devices like power electronics in the power grid. As this change happens, the operation and characteristics of the power grid are set to undergo a significant change. The power grid moves from an older electric machine dominated grid that used analog electronics for controls to a power electronics dominated grid that uses digital computing for controls. As this transition happens, there are significant problems of applied mathematics that will need to be resolved in power electronics and power grid. The problems include the ability to simulate in different timescales, while also leveraging the significantly improved computing capabilities available today. In this paper, the challenges related to simulation of power electronics are discussed and the challenge problems laid down that applied mathematics may help resolve in future.

Debnath, Suman↗

Provision of Grid Services by PV Plants with Integrated Battery Energy Storage System: Preprint

Battery energy storage systems (BESS), due to their tremendous range of uses and configurations, may assist PV integration in any number of ways by increasing power system flexibility. In this paper we describe results of a research project conducted by NREL and First Solar for developing controls and demonstrating many use cases for PV-BESS systems including (1) matching generation to loads through time shifting, reducing PV curtailment,; (2) promoting higher levels of PV penetrations by balancing the grid through ancillary services; (3) use of PV-BESS systems to provide wide-area stability services in the form of oscillations damping controls; and (r) use of gird forming BESS for enabling black start and islanded applications for PV-BESS systems. In the paper we will also describe the unique multi-MW test and validation platform developed at NREL for conducting research on fielded utility-scale PV-BESS systems. The platform consists of First Solar 0.43 MW PV power plant, NREL’s 1MW/1MW BESS, 2MW PV power supplies and 7MVA power electronic grid simulator interfaced with industrial plant controllers and power-hardware-in-the-loop (PHIL) capability.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Medium Voltage Testbed for Comparing Advanced Power Line Sensors vs. Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. These devices measure phase voltages and currents and are commissioned by electrical engineers. PTs/CTs can detect and react to various electrical anomalies that could adversely affect electrical grid operations. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medium-voltage sensor is compared with that of a reference PT and a CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the U.S. Department of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with an integrator for current monitoring. This study simulated a power grid model based on a utility circuit at the Riverside EPB of Chattanooga. The simulation circuit was created with MATLAB/Simulink software and was integrated into an RT-LAB project to run with the OP4510 real-time simulator at the OPLST. During the tests, the real-time simulations were run for 40 s, and the signal to record the test event with the power meter was set at 30 s for the event-trigger circuit. The advanced outdoor power line sensor testbed has a real-time simulator that is used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, and service restoration), while the analog signals are recorded by the same high-resolution power meter. The behaviors of analog signals, harmonic components, total harmonic distortion, and crest factors are assessed for this power line sensor and compared with those of the reference PT/CT because of the absence of testing standards for advanced outdoor power line sensors. The results showed that this OPLS technology responded identically to the PT and CT under all conditions.

Piesciorovsky, Emilio [ORNL]↗

CHARGE-MAP: An integrated framework to study the multicriteria EV charging infrastructure expansion problem

The widespread adoption of electric vehicles (EVs) in recent years has necessitated the development of effective charging infrastructures. However, charging infrastructure expansion is a multifaceted problem that requires careful consideration of the existing infrastructure, spatiotemporal distribution of charging demands, power-grid capacity, and budget constraints. Here, to approach this complex problem, we present CHARGE-MAP, a data-driven simulation-optimization framework, focused on ensuring meaningful charging experience for individual EV owners. CHARGE-MAP integrates three modules: an agent-based simulation module that estimates spatiotemporal distribution of charging demands by modeling EV adopter mobility and charging behavior; an optimization module that determines optimal new charging station/charger locations and capacities, while minimizing expected detour distances and wait-times with a limited number of new stations; and a power module that determines how to connect the stations to the power grid while maintaining its stability. Using the state of Virginia (consisting of 95 counties and 38 independent cities) as a case study, our results show that CHARGE-MAP can meet the demand of ~198,600 predicted EVs with 1,305 new public charging stations and 2,164 new chargers. It reduces average detour distances for charging by 66% and wait-times at stations by 72% compared to the existing infrastructure. Furthermore, transformer capacity requirement analysis reveals that only 1.8% of residential transformers require upgrades, while over 80% of commercial charging locations can be supported with modest transformer infrastructure (25 to 50 kVA). This indicates that targeted investments can facilitate cost-effective EV integration. Consequently, CHARGE-MAP provides policymakers and urban planners with crucial data-driven insights for effective EV charging infrastructure expansion. Sign up for PNAS alerts.

charging infrastructure↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (a five-lab demonstration) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, photovoltaics, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactors, control centers, and gas turbines, across five U.S. Department of Energy (DOE) national laboratories: National Laboratory of the Rockies (NLR), Idaho National Laboratory, National Energy Technology Laboratory, Lawrence Berkeley National Laboratory, and Sandia National Laboratories. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance DOE network, and are controlled via a centralized energy controller hosted at NLR's Advanced Research on Integrated Energy Systems facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Prescient

Prescient is a software package for simulating electricity grid (power systems) operations, under both nominal and extreme event conditions. Core functionality includes discrete event simulation, commitment and dispatch optimization, probabilistic scenario construction, and reporting/visualization. SAND2020-0169 M Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-NA0003525.

Watson, Jean Paul↗

Development of a Hardware-in-The-Loop Testbed for a Decentralized, Data-Driven Electric Vehicle Charging Control Algorithm

This study presents the design of an electric vehicle (EV)-grid integration (EVGI) hardware test-bed to implement smart EV charging algorithms. Here, the proposed test-bed also allows to create different grid events via flexible integration of other power hardware (e.g., controllable loads and battery energy storage systems) and test their impacts on EV charging. The design uses a real-time digital simulator to realize a complex distribution grid model with primary and secondary networks. A grid simulator physically realizes the selected nodes of the simulated grid to power an actual EV, forming a hardware-in-the-loop (HIL) test setup. The EV-grid integration is demonstrated based on the custom hardware and software implementation of the J1772 charging protocol using dSPACE MicroLabBox, operating as a custom EV Supply Equipment (EVSE). The HIL test-bed features a novel testing platform for accurate implementation and analysis of scalable charging algorithms. To this end, a data-driven, decentralized, model-free charging controller based on the Additive Increase and Multiplicative Decrease (AIMD) algorithm is presented and validated on an EV using the HIL test-bed. We tested the proposed algorithm under various case studies, and presented a comparison study with an existing droop-based, decentralized charging solution. The results showed that the EV successfully performed charging commands generated by the EVSE and regulated its charging power to effectively reduce the system loading caused by high EV penetration.

33 ADVANCED PROPULSION SYSTEMS↗

Geomagnetically Induced Current Field Test on Large Grid-Connected Power Transformers: Analysis, Model Development, and Simulations

Geomagnetic-induced current (GIC) flow in power grids can cause undesirable effects such as transformer overheating, harmonics, higher reactive power demand, etc. Many simulation models have been developed to study these effects, but real-world verification on modern transformer designs is rare. Here, this paper presents the first long-duration GIC field test in the U.S. performed on high-voltage, grid-connected transformers featuring winding clamps and tie rods instead of conventional tie bars. Field measurements were taken to evaluate GIC effects. These measurements also aided in developing and validating thermal and electromagnetic transient (EMT) models of the transformers. During the test, significant current and voltage distortions were observed along with considerable transformer reactive power losses. Analysis of the field measurements showed that the transformers’ hottest spot was at the inner windings, and their k-factors were close to factory test and software default values. Thermal simulations indicated that the transformers would not violate their thermal limits even for a GIC waveform that peaks at about 200 A/phase. EMT simulations revealed that increased transformer loading may reduce GIC-induced reactive power demand and harmonics in certain scenarios. The study also highlighted potential inaccuracies in using the k-factor method to calculate transformer reactive power losses.

EMTDC↗

NREL CGI and PHIL Platform for Validation of Multi-Technology Energy Systems at Scale

The presentation is an update on National Renewable Energy Laboratory Flatirons Campus' capabilities around multi-megawatt grid simulation and power hardware-in-the-loop. Recent improvements in operational and dynamic range of existing 7MVA Controllable Grid Interface (CGI) are described together with improvements in site-wide automation and data acquisition systems. In later part of presentation, a second 19.9MVA CGI that is currently under development is introduced. Its features are described further explaining future site's capabilities.

acquisition↗

Sparse Linear Solvers for Large-scale Electromagnetic Transient Simulations

Linear solvers form the basis for electromagnetic transient (EMT) simulations. There is a need to speed up EMT simulations as larger regions are analyzed using EMT simulations. For the same, the performance of linear solvers plays an important role. Exploiting the sparsity of the matrices generated in EMT simulations could assist with speed-up. Scalability is also crucial as power grids expand, demanding solutions capable of accommodating the increasing system size. Recent studies from the North American Electric Reliability Corporation (NERC) increasingly emphasize that EMT simulation models of the power grid will grow larger with the inclusion of power electronics components. Parallelisms in sparsity patterns exploit modern central processing units (CPUs), multi-core CPUs, and graphics processing units (GPUs) architectures in sparse solver designs. Therefore, this paper explores publicly available existing linear solvers and investigates their efficiency in large-scale power grid simulations. A large-scale power grid is developed by increasing the size of the IEEE 39 bus test system to up to 39000 bus systems.

Hsu, Kuan-Chieh↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗