Search NASA⌕ Search

SEARCH · Search NASA

Results for “power system planning and layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

33 records · Page 2

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

The Cost of Floating Offshore Wind Energy in California Between 2019 and 2032

California’s energy planning is centered around meeting the emissions reduction and renewable energy requirements of Senate Bill 350 by 2030. However, state power system planning is expected to eventually address California’s requirement to achieve 100% of total retail electricity sales from renewable energy and zero-carbon resources by 2045, as mandated by Senate Bill 100. To comply with these directives, California needs to investigate the further development of energy efficiency, storage, and a diverse range of renewable energy, zero-carbon emission, and transmission resources, including offshore wind. Wind resources off the coast of California have the potential to generate a significant portion of the state’s electric energy as it moves toward a zero-carbon economy and can help diversify its energy mix. Floating offshore wind technology, which is suitable for the deep waters along the California coast, is currently in a precommercial phase, with approximately 84 megawatts (MW) installed worldwide at the end of 2019. Globally there are over 7,000 MW in planning and permitting phases of development, with the first commercial-scale projects expected to be operational in 2024. This study provides site-specific cost and performance data for floating offshore wind to inform California’s long-term energy planning. The identification of new resources to meet California’s policy goals at least cost is part of the Integrated Resource Planning (IRP) process, which is coordinated by the California Public Utilities Commission (CPUC). In 2019–2020 IRP modeling, offshore wind was included for the first time as a candidate resource in some sensitivity cases (CPUC 2019). The data and information presented in this report can be used to update offshore wind inputs in future IRP cycles. The authors conducted a geospatial cost analysis over portions of the offshore wind resource area of California. The analyzed spatial domain includes sites with a mean wind speed of at least 7 meters per second and water depths between 40 meters (m) and 1,300 m. Costs and energy production vary across this analysis domain. We calculated these parameters on a grid layout with over 750 sites, with each site representing a 1,000-MW commercial offshore wind power plant. Levelized cost of energy (LCOE) was calculated at each site over the analysis domain. The resulting variation in LCOE across the analysis domain is illustrated through heat maps in this report. Five study areas were selected within the analysis domain where more detailed cost analysis was conducted and cost parameters, such as annual energy production, capital cost expenditures (CapEx), operational cost expenditures (OpEx), and net capacity factors are reported. These five study areas include Morro Bay, Diablo Canyon, Humboldt, Cape Mendocino and Del Norte.

17 WIND ENERGY↗

Alchemy: A Model-Based Approach for 2D to 3D Autonomous Nuclear System Design

Engineering design of nuclear power plant (NPP) piping and equipment systems frequently bypasses crucial 2D system planning, instead moving straight to 3D modeling. This often leads to designs that exceed building envelope constraints, forcing expensive and time-consuming redesigns. When 2D modeling is employed, it typically involves labor-intensive manual workflows that convert 2D drawings into 3D models, resulting in inefficiencies and errors across design iterations. These workflows further suffer from poor software interoperability and dependence on proprietary software ecosystems, thereby contributing to schedule delays and cost overruns. This paper presents Alchemy, an autonomous framework that transforms 2D system definitions into Industry Foundation Classes (IFC)-compliant 3D building information models (BIMs) for expediting nuclear facility design at the conceptual preliminary phase. Using a model-based approach, the framework treats the 2D system diagram as the central reference model employed to automatically generate all subsequent outputs, ensuring consistency between the system definition and the resulting physical design. A web-based interface enables engineers to define hierarchical system topologies including associated equipment, geometric properties, and connectivity requirements. A two-phase equipment layout optimization algorithm automatically computes collision-free spatial configurations within predefined building envelopes. An artificial intelligence (AI)-assisted pipe routing module then generates orthogonal, collision-free routing paths, allowing the user to select either an A* search-based method or an Ant Colony Optimization (ACO)-based method. All outputs are authored natively in IFC format, relying on open-source technologies and standardized formats in order to ensure extensibility and eliminate proprietary software dependencies. The proposed framework is validated on two representative pressurized-water reactor (PWR)-based case studies, for which it autonomously generates IFC-compliant 3D models in minutes, drastically reducing workflows that typically require hours of manual effort. The generated model demonstrates topologically correct equipment placement, physically plausible spatial relationships, and collision-free pipe routing consistent with known PWR loop configurations. This work represents a foundational step toward digital engineering for nuclear facility preliminary design, with future ongoing development targeting design code compliance and expanded system complexity.

97 - MATHEMATICS AND COMPUTING↗

Prototype Motor Controllers Demonstrated for the James Webb Space Telescope Cryogenic Environment

NASA is in the process of designing the James Webb Space Telescope. This telescope will investigate images of objects in deep space (stars, galaxies, etc.) by using light in the infrared region of the light spectrum. To make such observations, the telescope must have light sensors that operate at very cold temperatures, near absolute zero. To achieve this low-temperature tolerance, designers must place the light sensors behind a Sun shield that will prevent sunlight, and its heat, from reaching the sensors. In this cold region inside the telescope, electric motors and some motor controls must operate at temperatures near 40 K (40 degrees above absolute zero). These motors will be used to position light filters needed by the telescope. There are motors that operate at the low temperatures, but there is little technology for low-temperature motor-control electronics. The drawing shows how the motors and their controls are positioned behind the Sun shield. Simplified version of the layout of the motor and control electronics that are located, as dictated by mission requirements, in the cold zone of the James Webb Space Telescope. A Sun shield provides protection and isolation of these electronics from the heat of the rays of the sun. Room temperature compoenets (control computer, motor select command, motor phase drive, power supply, parallel to serial, and sun shield) as well as 40-kelvin components (motor select, serial to parallel, and motors) are shown. The Low Temperature Electronics Group at the NASA Glenn Research Center has been working to develop motor control electronics that will operate at a temperature of 40 K. The group conducted tests to determine which electronic components will operate at such very low temperatures. Then, components that were determined to operate successfully at the low temperatures were used to design low-temperature motor-controller circuits. A prototype motor controller circuit was built, evaluated, and demonstrated to operate at 70 K. Next, Glenn researchers plan to determine circuit performance at much colder temperatures--down to 40 K. This low-temperature program was supported by the James Webb Space Telescope Electrical Systems Design Group at the NASA Goddard Space Flight Center and by the NASA Electronic Parts and Packaging Program at NASA Headquarters and the Jet Propulsion Laboratory.

Patterson, Richard L.↗

Incorporating Wind Turbine Choice in High-Resolution Geospatial Supply Curve and Capacity Expansion Models

To achieve national decarbonization goals, U.S. annual deployment of wind energy will need to increase by at least fivefold compared to the recent past. Modeling and analysis frameworks can help inform where and how wind energy deployment might occur and thereby help enable the achievement of decarbonization goals. However, most prior wind energy modeling and analysis studies rely on generalized representations of wind energy technologies. Since wind energy technology advancements are expected to increase the competitiveness of wind energy, it is important to incorporate more detailed representations of turbine technology into wind energy modeling. Here we present a new method that incorporates wind turbine choice into the technology representation of land-based wind energy in long-term planning models. Our method integrates three previously published modeling and analysis capabilities: 1) bottom-up cost modeling to estimate future technology costs, 2) geospatial modeling to represent siting decisions, and 3) power sector modeling to evaluate potential deployment. We refer to this approach as a "customized turbine choice" methodology because it creates a composite turbine scenario by choosing from multiple wind turbine technologies—using site-specific optimized turbine layout and selecting the least-cost technology at each location. We demonstrate the capabilities of this new modeling pipeline by examining how the selection of four different wind turbine configurations might evolve from 2021 through 2040. Our results show that using our customized turbine choice methodology could lead to higher estimates for wind future deployment, which indicates that more simplified modeling might underestimate the role that wind energy could play in meeting decarbonization goals. Future research is needed to further explore the implications of turbine choice and to better inform technology researchers, original equipment manufacturers, and other wind industry stakeholders about the market potential of different wind turbine technologies.

17 WIND ENERGY↗

DEVELOPMENT OF A 25 MWTH FLAMELESS PRESSURIZED OXY-COMBUSTION PILOT

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

20 FOSSIL-FUELED POWER PLANTS↗

MODELING AND TESTING OF A NOVEL ULTRA-LOW TEMPERATURE SCO2 OPPOSING PISTON EXPANDER

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

A New Concurrent Engineering Tool for the New Mission Design Center at NASA Ames Research Center

The NASA Ames Mission Design Center (MDC) has undergone a significant transformation process in recent years, culminating in becoming a true Concurrent Engineering Center. The underlying goal of this transformation is to better serve the Ames PI community in a cost-effective and rapidly-responsive way, providing quality products pivotal to the decision-making proposal strategy of our center. The four pillars of the change focus on four areas: personnel, physical places, tools, and training. Personnel: the MDC switched from using a dedicated pool of engineers—mostly entry-level career—for a matrixed approach with more experienced Subject Matter Experts, usually involved in spaceflight projects. These SMEs get detailed to the MDC for the duration of the study on a part-time or full-time basis. Physical places: The physical aspect pertains mostly to the layout of the new Engineering building and the dedicated concurrent engineering layout to foster collaboration. The current plan includes a dedicated space for concurrent engineering sessions as well as dedicated project rooms for concept studies. Tool: the MDC team is developing a new in-house concurrent engineering tool to facilitate concurrent engineering sessions. The team leveraged the many lessons learned and insight gained from using the current concurrent engineering tool, in use since 2007. SMEs have been involved throughout its design and development, ensuring accuracy and providing validity to the implementation approach. This new tool is database-driven and allows a team to work concurrently on the same model of a mission concept. “Workspaces” are provided for each of the traditional spacecraft mission design disciplines, including cost accounting and systems engineering. There are multiple tiers of fidelity available within each workspace, which can be completed parametrically or independently from the other disciplines as needed or synchronously with the other disciplines. A “commit” step synchronizes a workspace with the mission database and identifies any potential conflicts, along with the user who entered the conflicting data. A Mission Summary workspace enables a Study Lead to run an effective CE session, displaying key graphics, workspace status information, and technical and monetary budget information. This new CE tool will be undergoing Beta Testing with its primary user base and a limited Parts database in the summer of 2020. The team plans to release the first fully operational version in December 2020. Training: working in early concept development and maturation for a space mission requires a unique mindset and being comfortable with uncertainties in an environment where requirements are not yet fully developed, and where changes and trade-offs happen at a high tempo. The MDC started a weekly training program to ensure a common knowledge base on how do develop and mature early concept studies, as well as how to operate in a concurrent engineering environment. In conclusion, the MDC transformation will provide the overall PI community focused on cost-effective small satellite scientific missions with a powerful tool to address and mature early concepts more effectively and efficiently.

David Mauro↗

Low SWaP Onboard Satellite Navigation, Guidance, and Control Technology

Onboard autonomy is a necessity for responsive space operations. Autonomous navigation, guidance, and control (NGC) enables space missions to reduce their dependence on high demand ground assets and costly ground personnel. It also allows for in-situ decision making and higher return on mission data. A flight software and hardware system providing this capability, called “autoNGC,” is currently being developed at NASA Goddard Space Flight Center for infusion into multiple future missions. The first build of autoNGC, providing autonomous navigation for lunar orbiting spacecraft, is targeted for completion by Fall 2024. It provides sensor fusion of multiple measurement types including pseudo-range from a weak signal Global Navigation Satellite Service (GNSS) receiver, 1-way and 2-way direct to Earth (DTE) range and Doppler, bearing and range from optical camera sensed images, and an accelerometer. AutoNGC is also being targeted for future missions that involve small body proximity operations, Sun Earth Libration point orbits, and distributed systems missions (DSMs) including those at outer planets. AutoNGC flight software is being built upon the plug-and-play architecture of the core Flight System (cFS) [Ref. 1]. Figure (Slide 7) shows the message-based software bus layout of various software applications (“apps”) consisting of the standard cFS apps and autoNGC interface apps and libraries. Accurate onboard navigation and timing is obtained through the Goddard Enhanced Onboard Navigation System (GEONS) software library [Ref. 2], which fuses different measurement types through an extended Kalman filter (EKF) framework. Optical measurements that are ingested in GEONS are provided by the cFS Goddard Image Analysis and Navigation Tool (cGIANT) app [Ref. 3]. This app processes optical images to extract the bearing angles of the centroid of the imaged body (near or far), the range to the imaged body, and/or of the features on the surface of a body to perform terrain relative navigation (TRN). Measurement of range to the body’s center of mass can also be derived from the detection of the limb. The first build of autoNGC for a lunar orbiting spacecraft is a minimal size, weight, and power (SWaP) hardware design allowing for inclusion into CubeSats and SmallSat-size class buses. Advancements in miniaturized space processors, such as the SpaceCube 3.0 Mini and the SpaceCube Mini-Z [Ref. 4] are utilized for low SWaP while maintaining a high level of performance. Figure (Slide 11) shows the composition of the first autoNGC build. The current enclosure design has dimensions 12 cm x 17 cm x 13.5 cm. The box mass is expected to be less than 2 kg, and the nominal power is 21 W. The hardware interfaces are designed for flexibility with a variety of sensor inputs. The achievable navigation performance depends on the sensors utilized, including the onboard clock for 1-way pseudo-range measurements. Analysis using a configuration that consists of weak signal GPS, TRN, and 1-way DTE has shown position and velocity accuracies of 10 meters and 2 cm/s (3-σ ) RSS, respectively, with onboard time knowledge estimated to better than 13 ns (3-σ ), for a spacecraft in a representative 12-hour eccentric lunar orbit. Other measurement types such as x-rays from known pulsars (called XNAV) and cross-links can also be processed in GEONS. With the plug-and-play architecture of autoNGC, cFS apps can easily be added and replaced, even after launch. Goddard is actively seeking partners to collaborate in the development of additional capabilities for autoNGC, including industry, academia, and others across the US Government. Plans are being formulated to make the autoNGC software platform available for use by any US government organization to leverage the non-recurring engineering associated with the development of onboard autonomous NGC 3 capabilities. As advancements in space qualified sensors, microprocessors, and algorithms are made, the autoNGC platform provides a ready starting point for inclusion of these technologies.

C. J. Gramling↗

Demonstration and Automation of Reflected Target Optical Measurement for Heliostats

Accurate optical surfaces are a primary driver of concentrated solar power plant performance. Errors in pointing and tracking mirrors, the canting of individual mirror facets, and the surface slope of the mirror itself can be caused by errors during assembly, transportation, wind loading, gravity, and many other sources. The tools that exist to measure these error sources today largely rely on fringe deflectometry (SOFAST, QDec, others), or photogrammetry with targets attached to the mirror surface. Since 2022, NREL has been developing a measurement method called the Reflected Target Non-intrusive Assessment (ReTNA) system. This system differs from most established methods in that we perform deflectometry with a pattern of coded targets, identified in space with photogrammetry. Reflected target systems have several advantages over traditional fringe deflectometry systems. Firstly, they can be operated in bright or ambient lighting, a challenge for fringe systems that use a projector and screen. Reflected target systems also can use a much lighter and less expensive target than projector-based systems. Lastly, 2D slope measurement can be solved from a single image, which leads to several advantages for accommodating faster measurements and smaller sized targets. These advantages make ReTNA particularly well-suited for applications where there are space or lighting constraints, like performing heliostat quality assurance on an assembly line. It's also useful when a lightweight, flexible system is needed, like for heliostat developers to quickly measure a new heliostat design at different orientations, to observe gravitational effects on the mirror surface shape. In the last year, significant improvements were made to this tool to make it more useful for these applications. These improvements were focused around validation of the ReTNA measurement system, and automation of the setup and measurement process. First, we present an improved ReTNA layout, for use on the heliostat assembly line. Next, we detail the various changes to the ReTNA software and computer vision methods to automate data collection in this new setup, and lessons learned from this process. The goal with this new setup is to perform a full heliostat surface characterization without removing the mirror from the assembly line. Lastly, we share results from several ReTNA validation studies undertaken over the last year. These include repeated ReTNA measurement on demonstration mirror facets, comparisons with other optical measurement tools, and some studies aimed at quantifying the uncertainty of ReTNA measurement under various constraints (mirror-target spacing, camera resolution, etc.). These results are compared with 2024 HelioCon performance targets, and our planned next steps for the ReTNA measurement system are presented.

CSP↗

CSP Systems Analysis 2022-2024 (Final Technical Report)

The CSP Systems Analysis project estimates the current market cost of CSP subsystems and technologies for use by the DOE Program and within NREL analysis tools. The project addresses upgrades to NREL's System Advisor Model (SAM) related to CSP, as well as development of new modules within SAM to expand the types of CSP systems that can be simulated and new tools for evaluating CSP subsystem performance or optimizing CSP system layouts, for example, SolarPILOT and SolTrace. The project evaluates the potential cost and performance of new CSP-relevant technologies and generally includes assessment of CSP technologies in support of the DOE subprogram. A primary goal of the CSP System Analysis project is to provide timely and accurate cost data to the DOE to assess the current state of CSP technologies as well as predict performance and cost for pre-commercial and emerging technologies that may impact the industry. Prior work in this task has produced technology cost reports and roadmaps for DOE and highlighted promising research paths that could reduce overall CSP cost, such as the supercritical CO2 power cycle and molten-salt trough systems. CSP Systems Analysis produces modeling tools to evaluate the performance of CSP systems, subsystems, or components, and journal articles, conference papers, technical reports and databases to disseminate information to the CSP industry. CSP technology costs are estimated and tracked using these tools as well as analysis of literature and industry sources. The CSP modeling tools and NREL analysis results are used by researchers; government, financial, and industry analysts; and other CSP stakeholders. The purpose of this final technical report is to summarize the key accomplishments of the past three years of this project. The project was divided into seven separate tasks, and in what follows, we describe the background, objectives, key accomplishments, and path forward for each task within the project, with one section of this report summarizing each task.

14 SOLAR ENERGY↗

Mooring System Cost Estimates for Wave Energy Farms in Shared Mooring Arrays

As wave energy converters (WECs) become more advanced and cost-efficient, so too must their mooring systems. A key question in the development plans for WECs is the cost of the mooring system, particularly for large wave farms. WEC devices deployed in a WEC farm array, where each device can be connected by shared mooring lines in various array layouts, have potential to reduce mooring system costs significantly. This paper presents the modeling and designing of mooring systems for large WEC arrays and the calculation of the cost of each mooring system to determine the change in cost as the number of WECs in a farm increases. A baseline mooring system for a single floating oscillating water column (OWC) WEC was developed for this analysis. The mooring system utilizes four anchored mooring lines connected to a square assembly of wire rope mooring lines, supported by four floating buoys, and attached to the floating WEC by four polyester rope mooring lines. This assembly, referred to as a floating cell, can be tiled to form various rectangular WEC arrays. The objective of this analysis is to determine how the mooring system cost changes as more WECs are added to an array layout, each with their own interconnected floating cell. To do this, complete mooring systems need to be designed for each WEC array layout. To narrow down the design space of a WEC array mooring system, a couple assumptions were made. It was assumed that the floating cell parameters of the baseline design were to stay constant across all floating cells in the WEC array. It was also assumed that the anchored mooring lines would be of the baseline configuration, a predominantly chain mooring line with a short section of polyester rope near the fairlead, and a drag-embedment anchor. These anchored lines were assumed to extend from the outer edges of the WEC array, inline with the headings of the wire rope mooring lines of the floating cells, or diagonal if extending from a corner of the WEC array. Full mooring systems were designed for 2xN and NxN WEC array layouts and efficiently simulated in the mooring dynamics simulation tool, MoorDyn, to ensure all dynamic constraints were met. The system costs were calculated and then refined by shortening unnecessary chain line lengths and reducing the chain diameters of the downstream anchored mooring lines. It was found that, in general, mooring system costs per WEC decrease when WECs are installed in an array. Compared to the baseline mooring system for a single WEC, the 2x3 mooring system array had the lowest mooring system cost per WEC, reducing the cost per WEC by 59%. The 3x3 and 4x4 array mooring systems also saw significant reductions in cost per WEC but had negligible cost savings between the two designs, primarily because the larger 4x4 mooring system requires larger chain diameters, which increases cost. These results provide an interesting glimpse into modeling, designing, and calculating the cost of mooring systems for large WEC arrays.

cost↗