Search NASA⌕ Search

SEARCH · Search NASA

Results for “power system planning and layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

21 records · Page 2

Demonstration and Automation of Reflected Target Optical Measurement for Heliostats

Accurate optical surfaces are a primary driver of concentrated solar power plant performance. Errors in pointing and tracking mirrors, the canting of individual mirror facets, and the surface slope of the mirror itself can be caused by errors during assembly, transportation, wind loading, gravity, and many other sources. The tools that exist to measure these error sources today largely rely on fringe deflectometry (SOFAST, QDec, others), or photogrammetry with targets attached to the mirror surface. Since 2022, NREL has been developing a measurement method called the Reflected Target Non-intrusive Assessment (ReTNA) system. This system differs from most established methods in that we perform deflectometry with a pattern of coded targets, identified in space with photogrammetry. Reflected target systems have several advantages over traditional fringe deflectometry systems. Firstly, they can be operated in bright or ambient lighting, a challenge for fringe systems that use a projector and screen. Reflected target systems also can use a much lighter and less expensive target than projector-based systems. Lastly, 2D slope measurement can be solved from a single image, which leads to several advantages for accommodating faster measurements and smaller sized targets. These advantages make ReTNA particularly well-suited for applications where there are space or lighting constraints, like performing heliostat quality assurance on an assembly line. It's also useful when a lightweight, flexible system is needed, like for heliostat developers to quickly measure a new heliostat design at different orientations, to observe gravitational effects on the mirror surface shape. In the last year, significant improvements were made to this tool to make it more useful for these applications. These improvements were focused around validation of the ReTNA measurement system, and automation of the setup and measurement process. First, we present an improved ReTNA layout, for use on the heliostat assembly line. Next, we detail the various changes to the ReTNA software and computer vision methods to automate data collection in this new setup, and lessons learned from this process. The goal with this new setup is to perform a full heliostat surface characterization without removing the mirror from the assembly line. Lastly, we share results from several ReTNA validation studies undertaken over the last year. These include repeated ReTNA measurement on demonstration mirror facets, comparisons with other optical measurement tools, and some studies aimed at quantifying the uncertainty of ReTNA measurement under various constraints (mirror-target spacing, camera resolution, etc.). These results are compared with 2024 HelioCon performance targets, and our planned next steps for the ReTNA measurement system are presented.

CSP↗

CSP Systems Analysis 2022-2024 (Final Technical Report)

The CSP Systems Analysis project estimates the current market cost of CSP subsystems and technologies for use by the DOE Program and within NREL analysis tools. The project addresses upgrades to NREL's System Advisor Model (SAM) related to CSP, as well as development of new modules within SAM to expand the types of CSP systems that can be simulated and new tools for evaluating CSP subsystem performance or optimizing CSP system layouts, for example, SolarPILOT and SolTrace. The project evaluates the potential cost and performance of new CSP-relevant technologies and generally includes assessment of CSP technologies in support of the DOE subprogram. A primary goal of the CSP System Analysis project is to provide timely and accurate cost data to the DOE to assess the current state of CSP technologies as well as predict performance and cost for pre-commercial and emerging technologies that may impact the industry. Prior work in this task has produced technology cost reports and roadmaps for DOE and highlighted promising research paths that could reduce overall CSP cost, such as the supercritical CO2 power cycle and molten-salt trough systems. CSP Systems Analysis produces modeling tools to evaluate the performance of CSP systems, subsystems, or components, and journal articles, conference papers, technical reports and databases to disseminate information to the CSP industry. CSP technology costs are estimated and tracked using these tools as well as analysis of literature and industry sources. The CSP modeling tools and NREL analysis results are used by researchers; government, financial, and industry analysts; and other CSP stakeholders. The purpose of this final technical report is to summarize the key accomplishments of the past three years of this project. The project was divided into seven separate tasks, and in what follows, we describe the background, objectives, key accomplishments, and path forward for each task within the project, with one section of this report summarizing each task.

14 SOLAR ENERGY↗

Mooring System Cost Estimates for Wave Energy Farms in Shared Mooring Arrays

As wave energy converters (WECs) become more advanced and cost-efficient, so too must their mooring systems. A key question in the development plans for WECs is the cost of the mooring system, particularly for large wave farms. WEC devices deployed in a WEC farm array, where each device can be connected by shared mooring lines in various array layouts, have potential to reduce mooring system costs significantly. This paper presents the modeling and designing of mooring systems for large WEC arrays and the calculation of the cost of each mooring system to determine the change in cost as the number of WECs in a farm increases. A baseline mooring system for a single floating oscillating water column (OWC) WEC was developed for this analysis. The mooring system utilizes four anchored mooring lines connected to a square assembly of wire rope mooring lines, supported by four floating buoys, and attached to the floating WEC by four polyester rope mooring lines. This assembly, referred to as a floating cell, can be tiled to form various rectangular WEC arrays. The objective of this analysis is to determine how the mooring system cost changes as more WECs are added to an array layout, each with their own interconnected floating cell. To do this, complete mooring systems need to be designed for each WEC array layout. To narrow down the design space of a WEC array mooring system, a couple assumptions were made. It was assumed that the floating cell parameters of the baseline design were to stay constant across all floating cells in the WEC array. It was also assumed that the anchored mooring lines would be of the baseline configuration, a predominantly chain mooring line with a short section of polyester rope near the fairlead, and a drag-embedment anchor. These anchored lines were assumed to extend from the outer edges of the WEC array, inline with the headings of the wire rope mooring lines of the floating cells, or diagonal if extending from a corner of the WEC array. Full mooring systems were designed for 2xN and NxN WEC array layouts and efficiently simulated in the mooring dynamics simulation tool, MoorDyn, to ensure all dynamic constraints were met. The system costs were calculated and then refined by shortening unnecessary chain line lengths and reducing the chain diameters of the downstream anchored mooring lines. It was found that, in general, mooring system costs per WEC decrease when WECs are installed in an array. Compared to the baseline mooring system for a single WEC, the 2x3 mooring system array had the lowest mooring system cost per WEC, reducing the cost per WEC by 59%. The 3x3 and 4x4 array mooring systems also saw significant reductions in cost per WEC but had negligible cost savings between the two designs, primarily because the larger 4x4 mooring system requires larger chain diameters, which increases cost. These results provide an interesting glimpse into modeling, designing, and calculating the cost of mooring systems for large WEC arrays.

cost↗