Modular & Scalable Small-Scale Mass-on-Spring Wave Energy Convertor (MOSWEC) PowerBuoy System for Reliable Powering of Autonomous Ocean Monitoring System
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Reliable systems health management is an important research area of NASA. A health management system that can accurately and quickly diagnose faults in various on-board systems of a vehicle will play a key role in the success of current and future NASA missions. We introduce in this paper the ProDiagnose algorithm, a diagnostic algorithm that uses a probabilistic approach, accomplished with Bayesian Network models compiled to Arithmetic Circuits, to diagnose these systems. We describe the ProDiagnose algorithm, how it works, and the probabilistic models involved. We show by experimentation on two Electrical Power Systems based on the ADAPT testbed, used in the Diagnostic Challenge Competition (DX 09), that ProDiagnose can produce results with over 96% accuracy and less than 1 second mean diagnostic time.
Reliable power system operation requires that system operators maintain a satisfactory small-signal stability margin at all times. Mode meters allow system operators to continuously monitor the stability margin by analyzing synchrophasor measurements. Experience with mode meters at the Bonneville Power Administration (BPA) has revealed that mode meters sometimes suffer severe bias following transient disturbances. In this paper, a robust version of the Yule-Walker mode meter algorithm is proposed to mitigate this bias. The robust capability is introduced by modifying the estimator of the autocovariance sequence (ACS) on which the algorithm depends. Tests with field-measured data demonstrate that the robust Yule-Walker (RYW) algorithm significantly outperforms its conventional counterpart and is better able to provide system operators with accurate information about the system's stability margin.
As power systems are undergoing a significant transformation with more uncertainties, less inertia and closer to operation limits, there is increasing risk of large outages. Thus, there is an imperative need to enhance grid emergency control to maintain system reliability and security. Towards this end, great progress has been made in developing deep reinforcement learning (DRL) based grid control solutions in recent years. However, existing DRL-based solutions have two main limitations: 1) they cannot handle well with a wide range of grid operation conditions, system parameters, and contingencies; 2) they generally lack the ability to fast adapt to new grid operation conditions, system parameters, and contingencies, limiting their applicability for real-world applications. Here, in this paper, we mitigate these limitations by developing a novel deep meta-reinforcement learning (DMRL) algorithm. The DMRL combines the meta strategy optimization together with DRL, and trains policies modulated by a latent space that can quickly adapt to new scenarios. We test the developed DMRL algorithm on the IEEE 300-bus system. We demonstrate fast adaptation of the meta-trained DRL polices with latent variables to new operating conditions and scenarios using the proposed method, which achieves superior performance compared to the state-of-the-art DRL and model predictive control (MPC) methods.
Not Available
With the increased adoption of distributed energy resources (DER), they are expected to contribute to power system reliability services and enhance power system stability. This paper presents a distributed consensus control approach for the real-time active power reserve estimation and power management in distributed PV (photovoltaic) systems. The proposed method estimates the cumulative active power reserve from numerous PV generators using only the sparse communication network for a DER aggregator to provide active power regulation services. The real-time active power reserve estimation using the proposed approach can be used by DER aggregators to manage curtailment in distributed PV systems to maintain stipulated reserves and further to provide power system frequency regulation. Using the proposed approach, the DER aggregator only requires measurements at the feeder substation and it does not require information from individual DER units, thereby improving system resiliency. The proposed distributed consensus control method is validated on IEEE 123 testbed using PSCAD simulations.
In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.
With the increased adoption of distributed energy resources (DER), they are expected to contribute to power system reliability services and enhance power system stability. This paper presents a distributed consensus control approach for the real-time active power reserve estimation and power management in distributed PV (photovoltaic) systems. The proposed method estimates the cumulative active power reserve from numerous PV generators using only the sparse communication network for a DER aggregator to provide active power regulation services. The real-time active power reserve estimation using the proposed approach can be used by DER aggregators to manage curtailment in distributed PV systems to maintain stipulated reserves and further to provide power system frequency regulation. Using the proposed approach, the DER aggregator only requires measurements at the feeder substation and it does not require information from individual DER units, thereby improving system resiliency. The proposed distributed consensus control method is validated on IEEE 123 testbed using PSCAD simulations.
Maintaining reliability of the bulk power system, which supplies and transmits electricity, is a constant focus of electric grid planners, operators, and regulators. Based on the standards set by power system reliability entities, the U.S. grid has been and continues to be very reliable. Over the past decade the average U.S. customer has only experienced about 15 minutes of outages per year due to supply limitations, with most of those outages occurring due to failures on the distribution system. However, there have been a few notable incidents in recent years tied to extreme weather events. The fact sheet provides and introduction to reliability of the bulk power system in the U.S.
This report documents an energy system planning study for the village of Ouzinkie, Alaska, conducted by the U.S. Department of Energy's (DOE) Energy Transitions Initiative Partnership Project (ETIPP). Ouzinkie is a small remote community located on Spruce Island, Alaska, in the Kodiak Archipelago. The Ouzinkie community is served by a local electrical system powered by a combination of diesel generators and a hydroelectric turbine. Due to aging assets, however, the power system reliability has declined in recent years, while the cost of operating the diesel generators has increased significantly. To address these problems, Ouzinkie asked ETIPP to provide technical assistance to develop an updated integrated plan for improvements to the Ouzinkie power system, in order to transition to a more reliable and resilient system powered by renewable energy resources.
During Phase II, the Engineering Development Phase, the SP-100 Project has defined and is pursuing a new approach to developing reliable power systems. The approach to developing such a system during the early technology phase is described along with some preliminary examples to help explain the approach. Developing reliable components to meet space reactor power system requirements is based on a top-down systems approach which includes a point design based on a detailed technical specification of a 100-kW power system. The SP-100 system requirements implicitly recognize the challenge of achieving a high system reliability for a ten-year lifetime, while at the same time using technologies that require very significant development efforts. A low-cost method for assessing reliability, based on an understanding of fundamental failure mechanisms and design margins for specific failure mechanisms, is being developed as part of the SP-100 Program.
Power system configurations and reliability for interplanetary missions to Mercury, Venus, Mars, and Jupiter
Abstract Hydroelectric power is playing a new and often expanded role in the world’s major power grids, offering low carbon generating capacity in industrializing, dam-building economies while providing reserve and flexibility to co-manage fledgling wind and solar resources in high income countries. Driven by river flows, conventional hydropower is exposed to the vagaries of weather and climate, motivating drought and climate change hydropower impact studies at large spatial scales. Here we review methods of climate-driven hydropower simulation at large spatial scales, specifically multi-basin regions to global. We identify four types of approach based on complexity of tools and richness of data applied to the problem. Since the earliest attempts to model climate-driven hydropower at continental scale almost two decades ago, the field has transitioned from one of scientific curiosity to practical application, with studies increasingly motivated by the need to inform power grid expansion planning and operation. As the hydrological and water management models used in large-scale hydropower studies become more sophisticated, new opportunities will emerge to study the impacts of changing hydropower on power system reliability and performance at large power grid scale. To grasp these opportunities, the water resources community must continue to enhance data and models for representing river flows and anthropogenic water use and management at subcontinental to global scales.
Deep space science missions have typically used radioisotope thermoelectric generator (RTG) power systems. The RTG power system has proven itself to be a rugged and highly reliable power system over many missions, however the thermal-to-electric conversion technology used was approximately 5% efficient. While the relatively low efficiency has some benefits in terms of system integration, there are compelling reasons why a more efficient conversion system should be pursued. The cost savings alone that are available as a result of the reduced isotope inventory are significant. The Advanced Radioisotope Power System (ARPS) project was established to fulfill this goal. Although it was not part of the ARPS project, Stirling conversion technology is being demonstrated with a low level of funding by both NASA and DOE. A power system with Stirling convertors. although intended for use with an isotope heat source. can be combined with other advanced technologies to provide a novel power system for deep space missions. An inflatable primary concentrator would be used in combination with a refractive secondary concentrator (RSC) as the heat source to power the system. The inflatable technology as a structure has made great progress for a variety of potential applications such as communications reflectors, radiators and solar arrays. The RSC has been pursued for use in solar thermal propulsion applications, and it's unique properties allow some advantageous system trades to be made. The power system proposed would completely eliminate the isotope heat source and could potentially provide power for science missions to planets as distant as Uranus. This paper will present the background and developmental status of the technologies and will then describe the power system being proposed.
The large-scale integration of variable renewable energy technologies around the world is forcing electric power systems into an unprecedented transition. This paper reports on power grid modernization and reliability issues related to the planning and operation of power systems with high levels of variable renewable energy. The contents of this paper stem from recent qualitative research in the form of a summary of an industry survey. The technical feedback from the interviewed 37 industry experts helped us identify 12 key areas of potential concern, which are discussed throughout this paper.
The Advanced eLectrical Bus (ALBus) CubeSat project is a technology demonstration mission of a 3-UCubeSat with an advanced, digitally controlled electrical power system capability and novel use of Shape Memory Alloy (SMA) technology for reliable deployable solar array mechanisms. The objective of the project is to, through an on orbit demonstration, advance the state of power management and distribution (PMAD) capabilities to enable future missions requiring higher power, flexible and reliable power systems. The goals of the mission include demonstration of: 100 Watt distribution to a target electrical load, efficient battery charging in the orbital environment, flexible power system distribution interfaces, adaptation of power system control on orbit, and reliable deployment of solar arrays and antennas utilizing re-settable SMA mechanisms. The power distribution function of the ALBus PMAD system is unique in the total power to target load capability of 100 W, the flexibility to support centralized or point-to-load regulation and ability to respond to fast transient power requirements. Power will be distributed from batteries at 14.8 V, 6.5 A to provide 100 W of power directly to a load. The deployable solar arrays utilize NASA Glenn Research Center superelastic and activated Nitinol(Nickel-Titanium alloy) Shape Memory Alloy (SMA) technology for hinges and a retention and release mechanism. The deployable solar array hinge design features utilization of the SMA material properties for dual purpose. The hinge uses the shape memory properties of the SMA to provide the spring force to deploy the arrays. The electrical conductivity properties of the SMA also enables the design to provide clean conduits for power transfer from the deployable arrays to the power management system. This eliminates the need for electrical harnesses between the arrays and the PMAD system in the ALBus system design. The uniqueness of the SMA retention and release mechanism design is the ability to reset the mechanism, allowing functional tests of the mechanisms prior to flight with no degradation of performance. The project is currently in preparation at the NASA Glenn Research Center for a launch in late calendar year of 2017. The 100 Watt power distribution and dual purpose, re-settable SMA mechanisms introduced several system level challenges due to the physical constraints in volume, mass and surface area of 3-U CubeSats. Several trade studies and design cycles have been completed to develop a system which supports the project objectives. This paper is a report on the results of the system level trade studies and assessments. The results include assessment of options for thermal control of 100 Watts of power dissipation, data from system analyses and engineering development tests, limitations of the 3-U system and extensibility to larger scale CubeSat missions.
Advanced eLectrical Bus (ALBus) CubeSat is a technology demonstration mission of a 3-U CubeSat with an advanced digitally controlled electrical power system and novel use of Shape Memory Alloy (SMA) technology for reliable deployable solar array mechanisms. The primary objective was to advance the power management and distribution (PMAD) capabilities to enable future missions requiring more flexible and reliable power systems with higher output power capabilities. Goals included demonstration of 100W distribution to a target electrical load, response to continuous and fast transient power requirements, and exhibition of reliable deployment of solar arrays and antennas utilizing re-settable SMA mechanisms. The power distribution function of the ALBus PMAD system is unique in the total power to target load capability, as power is distributed from batteries to provide 100W of power directly to a resistive load. The deployable solar arrays utilize NASA’s Nickel-Titanium-Palladium-Platinum (NiTiPdPt) high-temperature SMAs for the retention and release mechanism, and a superelastic binary NiTi alloy for the hinge component. The project launched as part of the CubeSat Launch Initiative (CLI) Educational Launch of Nanosatellites (ELaNa) XIX mission on Rocket Lab’s Electron in December 2018. This paper summarizes the final launched design and the lessons learned from build to flight.
High efficiency radioisotope power generators will play an important role in future NASA space exploration missions. Stirling Radioisotope Generators (SRG) have been identified as a candidate generator technology capable of providing mission designers with an efficient, high specific power electrical generator. SRGs high conversion efficiency has the potential to extend the limited Pu-238 supply when compared with current Radioisotope Thermoelectric Generators (RTG). Due to budgetary constraints, the Advanced Stirling Radioisotope Generator (ASRG) was canceled in the fall of 2013. Over the past year a joint study by NASA and DOE called the Nuclear Power Assessment Study (NPAS) recommended that Stirling technologies continue to be explored. During the mission studies of the NPAS, spare SRGs were sometimes required to meet mission power system reliability requirements. This led to an additional mass penalty and increased isotope consumption levied on certain SRG-based missions. In an attempt to remove the spare power system, a new generator architecture is considered which could increase the reliability of a Stirling generator and provide a more fault-tolerant power system. This new generator called the Modular Stirling Radioisotope Generator (MSRG) employs multiple parallel Stirling convertor/controller strings, all of which share the heat from the General Purpose Heat Source (GPHS) modules. For this design, generators utilizing one to eight GPHS modules were analyzed, which provide about 50 to 450 watts DC to the spacecraft, respectively. Four Stirling convertors are arranged around each GPHS module resulting in from 4 to 32 Stirling/controller strings. The convertors are balanced either individually or in pairs, and are radiatively coupled to the GPHS modules. Heat is rejected through the housing/radiator which is similar in construction to the ASRG. Mass and power analysis for these systems indicate that specific power may be slightly lower than the ASRG and similar to the MMRTG. However, the reliability should be significantly increased compared to ASRG.