Search NASA⌕ Search

SEARCH · Search NASA

Results for “proactive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Standards Roadmapping for Mission Assurance in Commercial Spaceflight

This paper explores the application of established roadmapping approaches in standards planning and roadmap development to support mission assurance objectives. Mission assurance requires proactive planning across multiple domains including technical, schedule, cost, organizational, and policy. The intersection of these domains happens at the enterprise level, and enterprise systems engineering processes can systematically guide mission assurance activities, including development of standards roadmaps. Standards planning and development is a critical contributor to an effective mission assurance strategy, although standards are often developed and adopted reactively. Technology and standards planning is a key Enterprise Process Management activity, as identified by the Systems Engineering Body of Knowledge, and technology and standards roadmaps are strategic tools used to enable that process. Technology roadmapping has proven effective in guiding enterprise architecture and concept design, and standards planning supports enterprise requirements definition and management. However, there are limited methodologies to guide such standards planning activities. The application of technology roadmapping principles to standards planning formalizes the process and establishes a repeatable framework for standards development and integration. The framework development described in this paper fills a methodological gap by adapting proven roadmapping techniques to standards planning. Through a comparison of roadmapping methodologies and a case study analysis, this approach outlines a systematic process for anticipating and planning standards needs. In the case of developing a standards integration roadmap for NASA’s Office of Safety and Mission Assurance (OSMA), technology roadmapping principles were adapted to develop a roadmap framework to allow NASA and OSMA to define an agency-wide standards integration plan for commercial and industry safety and mission assurance standards. The outcome highlights key adaptations required for roadmapping in a standards context and describes the process steps to formalize a standards planning activity. The roadmapping framework adapted for standards development and integration enables more strategic, forward-looking standards planning and allows for better alignment between evolving capabilities and mission assurance requirements. Beyond its application to mission assurance, this methodology can be transferred to other domains requiring standards development, providing a systematic approach that integrates systems engineering principles into policy strategy and decision-making processes.

Enterprise Systems Engineering↗

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continuous Improvement in Battery Testing at the NASA/JSC Energy System Test Area

The Energy Systems Test Area (ESTA) at the Lyndon B. Johnson Space Center in Houston, Texas conducts development and qualification tests to fulfill Energy System Division responsibilities relevant to ASA programs and projects. EST A has historically called upon a variety of fluid, mechanical, electrical, environmental, and data system capabilities spread amongst five full-service facilities to test human and human supported spacecraft in the areas of propulsion systems, fluid systems, pyrotechnics, power generation, and power distribution and control systems. Improvements at ESTA are being made in full earnest of offering NASA project offices an option to choose a thorough test regime that is balanced with cost and schedule constraints. In order to continue testing of enabling power-related technologies utilized by the Energy System Division, an especially proactive effort has been made to increase the cost effectiveness and schedule responsiveness for battery testing. This paper describes the continuous improvement in battery testing at the Energy Systems Test Area being made through consolidation, streamlining, and standardization.

Boyd, William↗

Automatic generation of efficient orderings of events for scheduling applications

In scheduling a set of tasks, it is often not known with certainty how long a given event will take. We call this duration uncertainty. Duration uncertainty is a primary obstacle to the successful completion of a schedule. If a duration of one task is longer than expected, the remaining tasks are delayed. The delay may result in the abandonment of the schedule itself, a phenomenon known as schedule breakage. One response to schedule breakage is on-line, dynamic rescheduling. A more recent alternative is called proactive rescheduling. This method uses statistical data about the durations of events in order to anticipate the locations in the schedule where breakage is likely prior to the execution of the schedule. It generates alternative schedules at such sensitive points, which can be then applied by the scheduler at execution time, without the delay incurred by dynamic rescheduling. This paper proposes a technique for making proactive error management more effective. The technique is based on applying a similarity-based method of clustering to the problem of identifying similar events in a set of events.

Morris, Robert A.↗

Automated Planning and Scheduling for Space Mission Operations

Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

scheduling↗

An architecture for object-oriented intelligent control of power systems in space

A control system for autonomous distribution and control of electrical power during space missions is being developed. This system should free the astronauts from localizing faults and reconfiguring loads if problems with the power distribution and generation components occur. The control system uses an object-oriented simulation model of the power system and first principle knowledge to detect, identify, and isolate faults. Each power system component is represented as a separate object with knowledge of its normal behavior. The reasoning process takes place at three different levels of abstraction: the Physical Component Model (PCM) level, the Electrical Equivalent Model (EEM) level, and the Functional System Model (FSM) level, with the PCM the lowest level of abstraction and the FSM the highest. At the EEM level the power system components are reasoned about as their electrical equivalents, e.g, a resistive load is thought of as a resistor. However, at the PCM level detailed knowledge about the component's specific characteristics is taken into account. The FSM level models the system at the subsystem level, a level appropriate for reconfiguration and scheduling. The control system operates in two modes, a reactive and a proactive mode, simultaneously. In the reactive mode the control system receives measurement data from the power system and compares these values with values determined through simulation to detect the existence of a fault. The nature of the fault is then identified through a model-based reasoning process using mainly the EEM. Compound component models are constructed at the EEM level and used in the fault identification process. In the proactive mode the reasoning takes place at the PCM level. Individual components determine their future health status using a physical model and measured historical data. In case changes in the health status seem imminent the component warns the control system about its impending failure. The fault isolation process uses the FSM level for its reasoning base.

Holmquist, Sven G.↗

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The LUVOIR study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale. While NASA's flagships perform exquisitely once on-orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA's future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship's lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA's current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity.. This paper briefly comments on the science motivation for NASA's flagships and on the science motivation for a LUVOIR-like mission. We argue the motivation for improving NASA's flagships development cost and schedule performance. We review the specific challenges of NASA's flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagship and other large government project lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA's flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA's future flagship's cost and schedule performance.

Crooke, Julie A.↗

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The large ultraviolet optical infrared surveyor (LUVOIR) study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale within the context of NASA’s flagships cost and schedule performances to date. While NASA’s flagships perform exquisitely once on orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA’s future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship’s lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA’s current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity. This paper briefly comments on the motivations for NASA’s flagships and on the science motivations for a LUVOIR-like mission. We argue the incentives for improving NASA’s flagships development cost and schedule performance. We review the specific additional challenges of NASA’s flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagships and other large government projects lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA’s flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA’s future flagship’s cost and schedule performance.

Crooke, Julie A.↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Early Career Research Program Annual Progress Report: Using ARM Data and Multiscale Models to Advance the Understanding of Liquid-Phase Cloud Response to Aerosol Perturbation over Ocean and Land

This report is for the first fiscal year of this ECRP project. This ECRP project aims to study the response of liquid-phase clouds to aerosol perturbation and reduce the related uncertainty in the DOE Earth system model. During this fiscal year, this project mainly made progress on the tasks about observational analyses for Objective 1; and successfully set up two Large-Eddy Simulation (LES) models for Objective 2. A postdoctoral researcher and a graduate student summer intern are on board and fully dedicated to this project. In addition to internal collaboration within LLNL, this project has routinely maintained external collaboration with scientists from universities, NASA Langley Research Center, and other DOE national laboratories. For the next reporting period, we plan to complete the tasks scheduled for the second year. Furthermore, we will promote the findings to communities of interest and proactively seek new collaborations to increase the impact of this project.

54 ENVIRONMENTAL SCIENCES↗

Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages

This report is being submitted for the task “Final Report” of DOE NEUP Project 15-8121 “Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages.” Typical nuclear power plant (NPP) outages always involve thousands of maintenance and refueling activities and a large number of workers in limited workspaces, while having tight schedules and zero-tolerance for accidents. During an outage, thousands of workers will be working in various workspaces across the NPP. High outage costs and expensive delays (approximately 1.5 million dollars of loss per day of delay) in NPP maintenance demand tight outage schedules. In packed workspaces, an automatic system that monitors human behaviors in real-time and provides insights about current and pending schedule deviations from the plan is critical for ensuring: 1) effective collaboration among workers and worker teams from different trades; 2) less waste of time and resources due to the lack of situational awareness; and 3) proactive outage project control. The overall goal of this project is to test the hypothesis that real-time imagery-based object tracking and spatial analysis, as well as human behavior modeling of outage participants, will significantly improve the efficiency of outage control while lowering the rates of accidents and incidents. Three objectives of this project are: 1) Establish real-time object tracking and spatiotemporal analysis methods that automatically assess the productivity of field activities and detect anomalous spatiotemporal relationships among activities that cause inefficiencies and risks; 2) Establish realtime human tracking and human factor modeling methods for automatically diagnosing unexpected actions of and interactions between outage participants, those which cause inefficient collaborations between Advanced Outage Control Center (AOCC), satellite outage centers, NPP workers, and maintenance service providers; and 3) Test the proposed automated object tracking, human behavior modeling, and spatiotemporal analysis methods in outage control case studies in order to characterize the effectiveness of automated imagery-data-driven methods in proactively improving the efficiency and safety of workflows in outage coordination and risk management. Recent studies of detailed human behavior monitoring on construction sites have examined the potential of applying advanced computer vision algorithms in detecting and tracking anomalous workers (i.e., workers who do not wear hard hats or safety vests) for ensuring job site safety. Some studies of human factor studies revealed the importance of modeling detailed interactions between individuals within and across teams in better understanding the impact of human in proactive project control. Other studies in the construction domain have developed computational simulation frameworks that formalize detailed spatiotemporal interactions between tasks in order to simulate the impacts of individual tasks on the performance of workflows. While integrated analyses that combine human factor assessment, as well as image processing and simulation, are in demand for effective decision-making, limited studies have examined the potential of such integrated analyses in NPP outage control. This research project has examined an automatic outage monitoring and control system that integrates human factor analysis, computer vision techniques, and simulation methods in order to enable engineers to better understand the interactions between humans, resources, and workflows during outage processes. The project aims at providing NPP maintenance agencies insights into more efficient use of limited resources in extending the life of a nuclear plant, as well as reducing waste while ensuring sufficient generation of electricity. This study is significant for the safety of nuclear plants, sustainable electricity generation for livable communities, and cost savings for maintaining electricity infrastructures in the United States.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Predictive Model for Starlink Maritime Performance Using Multi-Horizon RandomForest

Low Earth orbit (LEO) satellite systems have become a crucial enabler of broadband access for maritime industries, where traditional networks are unavailable. However, the high mobility of LEO constellations and constantly changing weather conditions result in unpredictable link fluctuations, limiting the ability of maritime platforms to plan bandwidth usage proactively. To the best of our knowledge, no prior work has developed a short-term predictive model for maritime LEO connectivity using real experimental field measurements. This paper proposes a data-driven forecasting model that predicts future downlink throughput using multi-horizon RandomForest regression. The model is trained using real experimental coastal measurement data incorporating recent throughput history, network-layer indicators, and environmental variables. The proposed approach reduces mean absolute error by approximately 31% compared to a persistence baseline for 15-minute horizons. It maintains a measurable improvement at 30 minutes, despite increased stochasticity. These findings confirm that proactive bandwidth awareness is feasible on maritime platforms and can effectively support operational decisions such as adaptive streaming, routing, and resource scheduling. The performance gap between forecasting horizons also highlights the need for expanded offshore datasets to improve prediction robustness under harsher maritime environments.

97 MATHEMATICS AND COMPUTING↗

Development of Performance Validation Tool for the NPCS for APR1400

Availability of nuclear power plant is highly dependent on the quality of major control systems including NSSS Control Systems. It has been experienced that a small flaw hidden among the control functions resulted in large operational transient or even reactor trip. The proactive quality control of these systems is not easy because of the dynamical characteristics of control algorithms. In a stand-alone or open loop state, it is not possible to perform integral system tests because they need control loads to form an appropriate closed control loop. In the construction plant, Power Ascension Test (PAT) is the first chance to witness the overall performance of the control systems. Because the PAT is the last activity of plant construction schedule, the cost of corrective actions is very high if any functional defect is found in this stage. To minimize risk caused by late detection of control system defects, we developed a validation tool as a proactive test device for the NSSS Process Control System (NPCS) for the SKN Unit 3 which is the first APR1400 plant in Korea. In this paper, the features of the dynamic performance test tool, test methodology, and the test results are described.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Vector-level feedforward control of LPBF melt pool area using a physics-based thermal model

Laser powder bed fusion (LPBF) is an additive manufacturing technique that has gained popularity thanks to its ability to produce geometrically complex, fully dense metal parts. However, these parts are prone to internal defects and geometric inaccuracies, stemming in part from variations in the melt pool. Here, this paper proposes a novel vector-level feedforward control framework for regulating melt pool area in LPBF. By decoupling part-scale thermal behavior from small-scale melt pool physics, the controller provides a scale-agnostic prediction of melt pool area and efficient optimization over it. This is done by operating on two coupled lightweight models: a finite-difference thermal model that efficiently captures vector-level temperature fields and a reduced-order, analytical melt pool model. Each model is calibrated separately with minimal single-track and 2D experiments, and the framework is validated on a complex 3D geometry in both Inconel 718 and 316L stainless steel. Results showed that feedforward vector-level laser power scheduling reduced geometric inaccuracy in key dimensions by 62%, overall porosity by 16.5%, and photodiode root-mean-squared deviation by 38.5% on average. Overall, this modular, data-efficient approach demonstrates that proactively compensating for known thermal effects can significantly improve part quality while remaining computationally efficient and readily extensible to other materials and machines.

Additive manufacturing↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

NASA Collaborative Approach Mitigates Environmentally-Driven Obsolescence

National Aeronautics and Space Administration (NASA) missions, like Department of Defense (DoD) organizations, require the rigorous testing and qualification of critical materials. Obsolescence supply risks created by environmental requirements can affect the cost, schedule and performance of NASA missions and the resilience of critical infrastructure. The NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center helps to identify obsolescence supply risks driven by environmental requirements and works proactively with NASA Centers and Programs, the DoD, the European Space Agency (ESA) and other agencies and partners to identify and evaluate environmentally friendly alternatives. TEERM tracks environmental regulations, identifies the potential loss of material availability and works with NASA programs and Centers to evaluate potential impacts through a risk assessment approach. TEERM collaborative projects identify, demonstrate and evaluate commercially viable alternative technologies and materials. A major focus during the Space Shuttle Program was the need to replace ozone depleting substances that were used in spray foam and cleaning applications. The potential obsolescence of coatings containing hexavalent chromium and the risks associated with lead free solder were also of concern for the Space Shuttle and present ongoing risks to new programs such as the Space Launch System. One current project teams NASA and ESA in the evaluation and testing of individual coatings and coating systems as replacements for hexavalent chromium coatings in aerospace applications. The proactive, collaborative approach used by TEERM helps reduce the cost burden on any one team partner, reduces duplication of effort, and enhances the technical quality and overall applicability of the testing and analysis.

environmentall-driven obsolescence↗

Diagnostics and Prognostics Tools for Assessing Remaining Useful Life of Nuclear Power Plant Materials

In recent years, there has been renewed interest in expanding the use of nuclear power to provide sustainable, carbon-free energy. As part of these activities in the USA, there are major initiatives focused on "life extension" for existing light-water nuclear power reactors (LWR) from 60 to 80 (or 100) years. To enable longer term operation, a range of advanced diagnostics and prognostics methods that are suitable for on-line, continuous, in-plant monitoring over extended time periods (months to years) are necessary. A central issue in life extension for the current fleet of LWRs is the early detection and monitoring of materials degradation. Material aging and degradation due to stresses and irradiation is a critical element in assessing potential for the failure of components in legacy nuclear power plants. A related issue is the ability to estimate remaining useful life (RUL) of components and systems based on condition assessment or degradation information. Detection of early stage damage in materials and assessment of remaining life is important in proactive or prognostic-based life management of legacy nuclear power plants. These approaches go beyond what is currently included in "condition-based maintenance," this strategy can potentially improve safety and reduce costs by detecting damage and scheduling appropriate maintenance/mitigation strategies early in the component lifecycle. For early detection of degradation, novel nondestructive (i.e., without destroying the utility of the specimen) tests that are suitable for continuous monitoring over extended time periods are needed, as are new techniques for data integration. The challenge of predicting remaining life starting from earlier phases of degradation is also largely unsolved and will require new prognostics tools. This paper will discuss the development and application of advanced diagnostics and prognostics tools to the life extension problem. The focus of these activities will be on ferritic and stainless steels, and degradation mechanisms common to an LWR operating environment in these materials. The use of micromagnetic measurements to assess early stages of degradation will be discussed. The measurements will be used, along with models of degradation accumulation over time, to assess the remaining useful life using a Bayesian prognostic algorithm. The primary advantage of a Bayesian approach is the ability to incorporate a priori information to constrain the solution of the problem and mitigate uncertainties in the measurements. Further, a Bayesian approach enables the incorporation of additional information as it becomes available, which can be used to update, and refine, the RUL estimates. Results of the proposed techniques on experimentally acquired measurements will be presented in the full paper.

diagnostics↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗