Search NASA⌕ Search

SEARCH · Search NASA

Results for “proactive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Predictive Model for Starlink Maritime Performance Using Multi-Horizon RandomForest

Low Earth orbit (LEO) satellite systems have become a crucial enabler of broadband access for maritime industries, where traditional networks are unavailable. However, the high mobility of LEO constellations and constantly changing weather conditions result in unpredictable link fluctuations, limiting the ability of maritime platforms to plan bandwidth usage proactively. To the best of our knowledge, no prior work has developed a short-term predictive model for maritime LEO connectivity using real experimental field measurements. This paper proposes a data-driven forecasting model that predicts future downlink throughput using multi-horizon RandomForest regression. The model is trained using real experimental coastal measurement data incorporating recent throughput history, network-layer indicators, and environmental variables. The proposed approach reduces mean absolute error by approximately 31% compared to a persistence baseline for 15-minute horizons. It maintains a measurable improvement at 30 minutes, despite increased stochasticity. These findings confirm that proactive bandwidth awareness is feasible on maritime platforms and can effectively support operational decisions such as adaptive streaming, routing, and resource scheduling. The performance gap between forecasting horizons also highlights the need for expanded offshore datasets to improve prediction robustness under harsher maritime environments.

97 MATHEMATICS AND COMPUTING↗

Development of Performance Validation Tool for the NPCS for APR1400

Availability of nuclear power plant is highly dependent on the quality of major control systems including NSSS Control Systems. It has been experienced that a small flaw hidden among the control functions resulted in large operational transient or even reactor trip. The proactive quality control of these systems is not easy because of the dynamical characteristics of control algorithms. In a stand-alone or open loop state, it is not possible to perform integral system tests because they need control loads to form an appropriate closed control loop. In the construction plant, Power Ascension Test (PAT) is the first chance to witness the overall performance of the control systems. Because the PAT is the last activity of plant construction schedule, the cost of corrective actions is very high if any functional defect is found in this stage. To minimize risk caused by late detection of control system defects, we developed a validation tool as a proactive test device for the NSSS Process Control System (NPCS) for the SKN Unit 3 which is the first APR1400 plant in Korea. In this paper, the features of the dynamic performance test tool, test methodology, and the test results are described.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Vector-level feedforward control of LPBF melt pool area using a physics-based thermal model

Laser powder bed fusion (LPBF) is an additive manufacturing technique that has gained popularity thanks to its ability to produce geometrically complex, fully dense metal parts. However, these parts are prone to internal defects and geometric inaccuracies, stemming in part from variations in the melt pool. Here, this paper proposes a novel vector-level feedforward control framework for regulating melt pool area in LPBF. By decoupling part-scale thermal behavior from small-scale melt pool physics, the controller provides a scale-agnostic prediction of melt pool area and efficient optimization over it. This is done by operating on two coupled lightweight models: a finite-difference thermal model that efficiently captures vector-level temperature fields and a reduced-order, analytical melt pool model. Each model is calibrated separately with minimal single-track and 2D experiments, and the framework is validated on a complex 3D geometry in both Inconel 718 and 316L stainless steel. Results showed that feedforward vector-level laser power scheduling reduced geometric inaccuracy in key dimensions by 62%, overall porosity by 16.5%, and photodiode root-mean-squared deviation by 38.5% on average. Overall, this modular, data-efficient approach demonstrates that proactively compensating for known thermal effects can significantly improve part quality while remaining computationally efficient and readily extensible to other materials and machines.

Additive manufacturing↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Diagnostics and Prognostics Tools for Assessing Remaining Useful Life of Nuclear Power Plant Materials

In recent years, there has been renewed interest in expanding the use of nuclear power to provide sustainable, carbon-free energy. As part of these activities in the USA, there are major initiatives focused on "life extension" for existing light-water nuclear power reactors (LWR) from 60 to 80 (or 100) years. To enable longer term operation, a range of advanced diagnostics and prognostics methods that are suitable for on-line, continuous, in-plant monitoring over extended time periods (months to years) are necessary. A central issue in life extension for the current fleet of LWRs is the early detection and monitoring of materials degradation. Material aging and degradation due to stresses and irradiation is a critical element in assessing potential for the failure of components in legacy nuclear power plants. A related issue is the ability to estimate remaining useful life (RUL) of components and systems based on condition assessment or degradation information. Detection of early stage damage in materials and assessment of remaining life is important in proactive or prognostic-based life management of legacy nuclear power plants. These approaches go beyond what is currently included in "condition-based maintenance," this strategy can potentially improve safety and reduce costs by detecting damage and scheduling appropriate maintenance/mitigation strategies early in the component lifecycle. For early detection of degradation, novel nondestructive (i.e., without destroying the utility of the specimen) tests that are suitable for continuous monitoring over extended time periods are needed, as are new techniques for data integration. The challenge of predicting remaining life starting from earlier phases of degradation is also largely unsolved and will require new prognostics tools. This paper will discuss the development and application of advanced diagnostics and prognostics tools to the life extension problem. The focus of these activities will be on ferritic and stainless steels, and degradation mechanisms common to an LWR operating environment in these materials. The use of micromagnetic measurements to assess early stages of degradation will be discussed. The measurements will be used, along with models of degradation accumulation over time, to assess the remaining useful life using a Bayesian prognostic algorithm. The primary advantage of a Bayesian approach is the ability to incorporate a priori information to constrain the solution of the problem and mitigate uncertainties in the measurements. Further, a Bayesian approach enables the incorporation of additional information as it becomes available, which can be used to update, and refine, the RUL estimates. Results of the proposed techniques on experimentally acquired measurements will be presented in the full paper.

diagnostics↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Sandia National Laboratories, California sewer system management plan.

A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

54 ENVIRONMENTAL SCIENCES↗

Sewer System Management Plan

The Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. In 2008, a Notice of Intent (NOI) was filed for the Sandia National Laboratories, California (SNL/CA) facility to be covered under the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit) and was issued the WDID No. 2SSO11605. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. Provision D.11 of the General Permit requires the development and implementation of a written Sewer System Management Plan (SSMP). This SSMP is prepared according to the mandatory elements required by Provision D.13 and D.14, as well as the schedule for a population less than 2,500 as outlined in Provision D.15.

42 ENGINEERING↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Community-driven development for computational biology at Sprints, Hackathons and Codefests

Background: Computational biology comprises a wide range of technologies and approaches. Multiple technologies can be combined to create more powerful workflows if the individuals contributing the data or providing tools for its interpretation can find mutual understanding and consensus. Much conversation and joint investigation are required in order to identify and implement the best approaches. Traditionally, scientific conferences feature talks presenting novel technologies or insights, followed up by informal discussions during coffee breaks. In multi-institution collaborations, in order to reach agreement on implementation details or to transfer deeper insights in a technology and practical skills, a representative of one group typically visits the other. However, this does not scale well when the number of technologies or research groups is large. Conferences have responded to this issue by introducing Birds-of-a-Feather (BoF) sessions, which offer an opportunity for individuals with common interests to intensify their interaction. However, parallel BoF sessions often make it hard for participants to join multiple BoFs and find common ground between the different technologies, and BoFs are generally too short to allow time for participants to program together. Results: This report summarises our experience with computational biology Codefests, Hackathons and Sprints, which are interactive developer meetings. They are structured to reduce the limitations of traditional scientific meetings described above by strengthening the interaction among peers and letting the participants determine the schedule and topics. These meetings are commonly run as loosely scheduled “unconferences” (self-organized identification of participants and topics for meetings) over at least two days, with early introductory talks to welcome and organize contributors, followed by intensive collaborative coding sessions. We summarise some prominent achievements of those meetings and describe differences in how these are organised, how their audience is addressed, and their outreach to their respective communities. Conclusions: Hackathons, Codefests and Sprints share a stimulating atmosphere that encourages participants to jointly brainstorm and tackle problems of shared interest in a self-driven proactive environment, as well as providing an opportunity for new participants to get involved in collaborative projects.

59 BASIC BIOLOGICAL SCIENCES↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coordinating Garbage Collection for Arrays of Solid-state Drives

Although solid-state drives (SSDs) offer significant performance improvements over hard disk drives (HDDs) for a number of workloads, they can exhibit substantial variance in request latency and throughput as a result of garbage collection (GC). When GC conflicts with an I/O stream, the stream can make no forward progress until the GC cycle completes. GC cycles are scheduled by logic internal to the SSD based on several factors such as the pattern, frequency, and volume of write requests. When SSDs are used in a RAID with currently available technology, the lack of coordination of the SSD-local GC cycles amplifies this performance variance. We propose a global garbage collection (GGC) mechanism to improve response times and reduce performance variability for a RAID of SSDs. We include a high-level design of SSD-aware RAID controller and GGC-capable SSD devices and algorithms to coordinate the GGC cycles. We develop reactive and proactive GC coordination algorithms and evaluate their I/O performance and block erase counts for various workloads. Our simulations show that GC coordination by a reactive scheme improves average response time and reduces performance variability for a wide variety of enterprise workloads. For bursty, write-dominated workloads, response time was improved by 69% and performance variability was reduced by 71%. We show that a proactive GC coordination algorithm can further improve the I/O response times by up to 9% and the performance variability by up to 15%. We also observe that it could increase the lifetimes of SSDs with some workloads (e.g. Financial) by reducing the number of block erase counts by up to 79% relative to a reactive algorithm for write-dominant enterprise workloads.

Flash Memory↗

SECARB Project Overview Book

In 2003, the United States Department of Energy (DOE) issued awards initiating seven Regional Carbon Sequestration Partnerships (RCSP) spanning the United States and portions of Canada. Managed by DOE’s National Energy Technology Laboratory (NETL), the RCSPs currently represent more than 400 state agencies, universities, and private companies, spanning 43 states, three Native American Organizations, and four Canadian provinces. The Southern States Energy Board (SSEB) received an award on October 1, 2003, which established the Board’s overall management and administration of the Southeast Regional Carbon Sequestration Partnership, or SECARB. The geographical region currently includes 13 states and a network of more than 100 stakeholders. The Nation’s leading scientists, university researchers, national laboratories, industrial representatives, environmental organizations, and many others have taken a proactive approach at identifying and characterizing the most promising options for technology deployment and carbon dioxide (CO2) utilization and storage (CCUS) for the Southeast. The results obtained during these injections will be important to the future commercialization of CCUS technologies and the continued use of fossil fuels as a significant energy source in a manner that is environmentally responsible. Each of the six SECARB project locations has been locally coordinated by its own field team. The field teams assume responsibility for the technical scope of work, local education and outreach, permitting, monitoring, verification, and accounting (MVA), and maintaining the validation test’s schedule and budget. Each team contributes new information to the continued characterization of the region. In addition, a task is dedicated to integrating field data and filling gaps in regional characterization data sets. Data and tools developed in the Continued Characterization task are incorporated into a relational database and geographic information system (GIS). All field tests, the continued characterization project, and the cross-cutting functions are designed to support the DOE roadmap by validating technologies and identifying locations throughout the region that could support full-scale CCUS deployment opportunities. Detailed fact sheets for the SECARB projects are available on the SECARB website at www.secarbon.org (see “Projects” tab).

RCSP↗

A low-cost centralized HVAC control system solution for energy savings, load shedding, and improved maintenance

University campuses rely on centralized controls for managing and optimizing complex HVAC systems in larger buildings. However, most campuses also have many smaller buildings with packaged HVAC systems controlled by a stand-alone thermostat. Even when these distributed and often overlooked systems have modern programmable thermostats, they cannot be centrally monitored or controlled, and they are typically not programmed adequately. This paper describes the implementation of a low-cost centralized control solution for these systems serving smaller campus buildings, mostly under 5,000 sf and representative of light commercial spaces. Thanks to advances in technology spurred by residential and commercial IoT developments, simple networked thermostat solutions exist that can easily replace original thermostats, and, connect these systems to a web-based portal for monitoring and control. We show that, with small customizations, these platforms can be integrated into facility management workflows. Beyond the energy savings potential from improved scheduling and closer management of these systems, there are significant advantages for maintenance crews since these systems can now be monitored on smart phones or tablets. A grid-responsive load-shedding program has also been implemented for additional cost savings. The networked thermostats can also be connected to additional systems such as economizer controls for improved ventilation management and energy savings. With data from these systems integrated centrally, it can also be used for improved analytics and fault detection. A toolkit has been developed to share the program with other campuses, whether for energy savings, improved management of ventilation, or a more proactive maintenance approach.

Fauchier-Magnan, Nicolas↗

Connecting the Dots: An Assessment of Cyber-risks in Networked Building and Municipal Infrastructure Systems

The buildings and city streets we walk down are changing. Driven by various data-driven use cases, there is increased interest in networking and integrating lighting and other building systems (e.g., heating, ventilation, and air conditioning (HVAC), security, scheduling) that were previously not internet-facing, and equipping them with sensors that collect information about their environment and the people that inhabit it. These data-enabled systems can potentially deliver improved occupant and resident experiences and help meet the U.S. Department of Energy (DOE) national energy and carbon reduction goals. Deploying connected devices new to being networked, however, is not without its challenges. This paper explores tools available to system designers and integrators that facilitate a cybersecurity landscape assessment – or more specifically the identification of threats, vulnerabilities, and adversarial behaviors that could be used against these networked systems. These assessments can help stakeholders shift security prioritization proactively toward the beginning of the development process.

cyber-risk assesment, adversarial behavior, MITRE ↗

Comparing Coordinated Garbage Collection Algorithms for Arrays of Solid-state Drives

Solid-State Drives (SSDs) offer significant performance improvements over hard disk drives (HDD) on a number of workloads. The frequency of garbage collection (GC) activity is directly correlated with the pattern, frequency, and volume of write requests, and scheduling of GC is controlled by logic internal to the SSD. SSDs can exhibit significant performance degradations when garbage collection (GC) conflicts with an ongoing I/O request stream. When using SSDs in a RAID array, the lack of coordination of the local GC processes amplifies these performance degradations. No RAID controller or SSD available today has the technology to overcome this limitation. In our previous work, we presented a Global Garbage Collection (GGC) mechanism to improve response times and reduce performance variability for a RAID array of SSDs. A coordination method is employed so that GCs in the array can run at the same time. The coordination can exhibit substantial performance improvement. In this paper, we explore various GC coordination algorithms. We develop reactive and proactive GC coordination algorithms and evaluate their I/O performance and block erase counts for various workloads. We show that a proactive GC coordination algorithm can improve the I/O response times by up to 9% further and increase the lifetime of SSDs by reducing the number of block erase counts by up to 79% compared to a reactive algorithm.

99 GENERAL AND MISCELLANEOUS↗

Smart Grid Constraint Violation Management for Balancing and Regulating Purposes

The gradual active load penetration in low voltage distribution grids is expected to challenge their network capacity in the near future. Distribution system operators should for this reason resort to either costly grid reinforcements or to demand side management mechanisms. Since demand side management implementation is usually cheaper, it is also the favorable solution. To this end, this article presents a framework for handling grid limit violations, both voltage and current, to ensure a secure and qualitative operation of the distribution grid. This framework consists of two steps, namely a proactive centralized and subsequently a reactive decentralized control scheme. The former is employed to balance the one hour ahead load while the latter aims at regulating the consumption in real-time. In both cases, the importance of fair use of electricity demand flexibility is emphasized. Thus, it is demonstrated that this methodology aids in keeping the grid status within preset limits while utilizing flexibility from all flexibility participants.

24 POWER TRANSMISSION AND DISTRIBUTION↗