Search NASA⌕ Search

SEARCH · Search NASA

Results for “process improvement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Environmental Data Flow Six Sigma Process Improvement Savings Overview

An overview of the Environmental Data Flow Six Sigma improvement project covers LANL’s environmental data processing following receipt from the analytical laboratories. The Six Sigma project identified thirty-three process improvements, many of which focused on cutting costs or reducing the time it took to deliver data to clients.

54 ENVIRONMENTAL SCIENCES↗

Process Improvement: Reduce unplanned chlorine delivery shutdowns for the plutonium purification processing [Slides]

Chlorine delivery system used by MET-1 leaked in 2012 and operations were suspended. The existing chlorine gas deliver and detection system is in need of upgrade or replacement. It is reaching the end of the 25 year design life. The current system is a bench scale system that is now running on a continuous basis ~ 10 hours per day. Chlorine is used as a reagent for a number of nuclear material metal preparation and purification applications at LANL Plutonium Facility. MET-1 uses Chlorine for purification. Benefits of improving this process immediately benefit MET-1 who deals with the throughput of Plutonium on the technical and engineering side and benefits NCO-1&2 on the safety side.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Waste reduction and process improvements in the analysis of plutonium by x-ray fluorescence

Significant modifications were made to a sample preparation process for quantifying gallium in plutonium metal by wavelength dispersive X-ray fluorescence. These changes were made to minimize waste and improve process safety and efficiency. Sample sizes were reduced, cheaper sample preparation acids were used, and safety improvements were implemented. Using this modified process, results from analyzing a batch oftest samples indicated that relative precision and accuracy were {approx}0.2% and {approx}0.1% respectively, which is comparable to that obtained using the older, established sample preparation method.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas

This document summarizes the activities of Cooperative Agreement DE-FE0026590, “Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas” during the performance period of October 1, 2015 through May 31, 2017. This project was funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime contractor and co-funder of the project. Mitsubishi Heavy Industries America (MHIA) and AECOM were project team members. The overall project objective was to improve costs, energy requirements, and performance of an existing amine-based CO 2 capture process. This will occur via improvements in three areas: 1. Reboiler design – The first objective of the program was to demonstrate performance of an integrated stripper/reboiler (termed Built-in Reboiler, or BIR) to reduce footprint, capital costs, and integration issues of the current technology. 2. Particulate management – The second objective was to carry out a Particulate Matter Management (PMM) test. This has the potential to reduce operating costs and capital costs due to the reduced or eliminated need for mechanical filtration. 3. Solvent – The third objective was to carry out a new solvent test plan (referred to as NSL) to demonstrate a new solvent (termed New Solvent A), which is expected to reduce regeneration steam. The bulk price is also expected to be lower than KS-1, which is the current solvent used in this process. NSL testing would include baseline testing, optimization, long term testing, solvent reclamation testing, and final inspection. These combine to form the Advanced Carbon Capture (ACC) technology. Much of this work will be applicable to generic solvent processes, especially in regards to improved reboiler design, and focused to meet or exceed the DOE’s overall carbon capture performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of $40/tonne of CO 2 by 2025 and at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches by 2030. This project was divided into two phases. Phase 1 is the planning phase, and Phase 2 is the construction, operations, testing, and analysis phase. A down select occurred after Phase 1. Phase 1 activities were carried out during this reporting period, and therefore, Phase 1 activities are solely considered in this report. The project was not selected for Phase 2 funding.

01 COAL, LIGNITE, AND PEAT↗

Two-stage dynamic deregulation of metabolism improves process robustness & scalability in engineered E. coli.

Here, we report that two-stage dynamic control improves bioprocess robustness as a result of the dynamic deregulation of central metabolism. Dynamic control is implemented during stationary phase using combinations of CRISPR interference and controlled proteolysis to reduce levels of central metabolic enzymes. Reducing the levels of key enzymes alters metabolite pools resulting in deregulation of the metabolic network. Deregulated networks are less sensitive to environmental conditions improving process robustness. Process robustness in turn leads to predictable scalability, minimizing the need for traditional process optimization. We validate process robustness and scalability of strains and bioprocesses synthesizing the important industrial chemicals alanine, citramalate and xylitol. Predictive high throughput approaches that translate to larger scales are critical for metabolic engineering programs to truly take advantage of the rapidly increasing throughput and decreasing costs of synthetic biology.

59 BASIC BIOLOGICAL SCIENCES↗

Development of an Improved Process for Installation Projects of High Technology Manufacturing Equipment

High technology manufacturing equipment is utilized at Los Alamos National Laboratory (LANL) to support nuclear missions. This is undertaken from concept initiation where equipment is designed and then taken through several review phases, working closely with system engineers (SEs) responsible for each of the affected systems or involved disciplines (from gasses to HVAC to structural, etc.). After the design is finalized it moves to procurement and custom fabrication of the equipment and equipment installation, including all of the paperwork involved. Not only are the engineering and manufacturing aspects important, but also the scheduling, financial forecasting, and planning portions that take place initially and are sometimes modified as the project progresses should requirements, changes or additions become necessary. The process required to complete a project of this type, including equipment installation, is unique and involves numerous steps to complete. These processes can be improved and recent work on the Direct Current Arc (DC Arc) Glovebox Design, Fabrication and Installation Project provides an opportunity to identify some important lessons learned (LL) that can be implemented in the future for continued project improvement and success.

42 ENGINEERING↗

Process Improvements Result in Schedule and Cost Savings for Waste Shipping Campaign

In 2006, the U.S. Department of Energy-led nuclear cleanup project at the West Valley Demonstration Project (WVDP) in New York State initiated a waste processing and shipping campaign to accomplish the disposal of approximately 20,000 drums of low-level radioactive cement waste at the Nevada Test Site (NTS) in the state of Nevada. Although the WVDP had considerable experience in the processing and shipment of low-level waste (LLW), the WVDP had not previously embarked upon a waste shipping of this magnitude. Efforts in 2006 focused on the development of processes and procedures to facilitate the start-up of this project. In 2007, the shipping campaign was redirected toward more efficient waste retrieval, processing and shipment. The last drum was accepted for disposal at NTS in November 2007, nearly one year ahead of the original estimated project completion date. The efficiency of this campaign is mainly attributed to process improvements. In summary: The last drums were shipped from the WVDP Drum Cell in October 2007 with all drums received and accepted for disposal at the NTS in November 2007. The total Project cost of this work-scope, including packaging, transport, and final demobilization was approximately $20.7 M. Process and engineering improvements were key to the success of this project, and resulted in project completion more than one year ahead of schedule and at a sizeable cost savings over preliminary cost estimates. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process Improvements to Biomass Pretreatment of Fuels and Chemicals

MBI, a 501c(3) company focusing on de-risking and scaling up bio-based technologies, has teamed with Michigan State University and the Idaho National Laboratory to develop and demonstrate process improvements to the ammonia fiber expansion (AFEX) pretreatment process. The logistical hurdles of biomass handling are well known, and the regional depot concept - in which small, distributed bioprocessing operations collect, preprocess, and densify biomass before shipping to a centralized refinery - is a promising alternative to centralized collection. AFEXTM (AFEX is a trademark of MBI) has unique features among pretreatments that would make it desirable as a pretreatment prior to densification at the depot scale. MBI has developed a novel design, using a packed bed reactor for the AFEX process that can be scaled down economically to the depot scale at a lower capital cost as compared to the traditional design (Pandia type reactor). Thus, the purpose of this project was to develop, scale-up, demonstrate, and improve this novel design The key challenges are the recovery of ammonia, consistent and complete pretreatment performance, and the overall throughput of the reactor. In this project an engineering scale packed bed AFEX system with 1-ton per day capacity was installed at MBI’s building. The system has been operational since mid-2013. During that time, MBI has demonstrated the robustness, reliability, and consistency of the process. To date, nearly 500 runs have been performed in the reactors. There have been no incidences of plugging (i.e., inability to remove ammonia from biomass after the treatment), nor has there been any instance of a major ammonia release into the atmosphere. Likewise, the sugar released via enzyme hydrolysis has remained consistent throughout these runs. Our economic model shows a 46% reduction in AFEX capital cost at the 100 ton/day scale compared to the traditional design of AFEX (Pandia type reactor). The key performance factors were demonstrated; >94% ammonia recovery, >75% sugar yields at high solid loading, and complete utilization of the sugars for ethanol production at the 2500 liter scale. Fermentation tests were performed using Zymomonas mobilis 8b and densified AFEX-treated corn stover at >20% solid loading. The obtained titer (~60g/l), productivity (2.5 g/L-h), and yield (330 L/tonne of biomass) exceeded the performance targets set out by NREL. The key findings from these efforts are: no contamination was observed, no cleanup of the sugar stream was required, and no major nutrient addition was required. Our economic model shows that using a packed bed design for the AFEX process and pelleted AFEX-treated biomass reduces the ethanol production cost by 24% when compared to using the traditional AFEX design.

09 BIOMASS FUELS↗

Insights Gained from Ultrasonic Testing of Piping Welds Subjected to the Mechanical Stress Improvement Process

Pacific Northwest National Laboratory (PNNL) is assisting the United States Nuclear Regulatory Commission (NRC) in developing a position on the management of primary water stress corrosion cracking (PWSCC) in leak-before-break piping systems. Part of this involves determining whether inspections alone, or inspections plus mitigation, are needed. This work addresses the reliability of ultrasonic testing (UT) of cracks that have been mitigated by the mechanical stress improvement process (MSIP). The MSIP has been approved by the NRC (NUREG-0313) since 1986 and modifies residual stresses remaining after welding with compressive, or neutral, stresses near the inner diameter surface of the pipe. This compressive stress is thought to arrest existing cracks and inhibit new crack formation. To evaluate the effectiveness of the MSIP and the reliability of ultrasonic inspections, flaws were evaluated both before and after MSIP application. An initial investigation was based on data acquired from cracked areas in 325-mm-diameter piping at the Ignalina Nuclear Power Plant (INPP) in Lithuania. In a follow-on exercise, PNNL acquired and evaluated similar UT data from a dissimilar metal weld (DMW) specimen containing implanted thermal fatigue cracks. The DMW specimen is a carbon steel nozzle-to-safe end-to-stainless steel pipe section that simulates a pressurizer surge nozzle. The flaws were implanted in the nozzle-to-safe end Alloy 82/182 butter region. Results are presented on the effects of MSIP on specimen surfaces, and on UT flaw responses.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Letter Report - Analysis of Ultrasonic Data on Piping Cracks at Ignalina Nuclear Power Plant Before and After Applying a Mechanical Stress Improvement Process, JCN-N6319, Task 2

Pacific Northwest National Laboratory (PNNL) is assisting the United States Nuclear Regulatory Commission (NRC) in developing a position on the management of primary water stress corrosion cracking (PWSCC) in piping systems previously analyzed for leak-before-break (LBB). Part of this work involves determining whether inspections alone are sufficient or if inspections plus mitigation techniques are needed. The work described in this report addresses the reliability of ultrasonic phased-array (PA) examinations for inspection of cracks that have been subjected to the mitigation method of mechanical stress improvement process (MSIP). It is believed that stresses imparted during MSIP may make ultrasonic crack responses in piping welds more difficult to detect and accurately characterize. To explore this issue, data were acquired, both before and after applying MSIP, and analyzed from cracked areas in piping at the Ignalina Nuclear Power Plant (INPP) in Lithuania. This work was performed under NRC Project JCN-N6319, PWSCC in Leak-Before-Break Systems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

WE-D-204-02: Errors and Process Improvements in Radiation Therapy

Speakers in this session will present overview and details of a specific rotation or feature of their Medical Physics Residency Program that is particularly exceptional and noteworthy. The featured rotations include foundational topics executed with exceptional acumen and innovative educational rotations perhaps not commonly found in Medical Physics Residency Programs. A site-specific clinical rotation will be described, where the medical physics resident follows the physician and medical resident for two weeks into patient consultations, simulation sessions, target contouring sessions, planning meetings with dosimetry, patient follow up visits, and tumor boards, to gain insight into the thought processes of the radiation oncologist. An incident learning rotation will be described where the residents learns about and practices evaluating clinical errors and investigates process improvements for the clinic. The residency environment at a Canadian medical physics residency program will be described, where the training and interactions with radiation oncology residents is integrated. And the first month rotation will be described, where the medical physics resident rotates through the clinical areas including simulation, dosimetry, and treatment units, gaining an overview of the clinical flow and meeting all the clinical staff to begin the residency program. This session will be of particular interest to residency programs who are interested in adopting or adapting these curricular ideas into their programs and to residency candidates who want to learn about programs already employing innovative practices. Learning Objectives: To learn about exceptional and innovative clinical rotations or program features within existing Medical Physics Residency Programs. To understand how to adopt/adapt innovative curricular designs into your own Medical Physics Residency Program, if appropriate.

60 APPLIED LIFE SCIENCES↗

Simplifying the Tracking of Waste Disposal Inventories: Process Improvement for Rapid Data Interpretation and Reduced Errors - 16143

Tracking the inventory of low-level radioactive waste at an operating disposal facility offers unique challenges. At the Savannah River Site's Saltstone Disposal Facility (SDF) the inventory used in Performance Assessment modeling is determined based on radionuclide concentrations from the aqueous waste in a feed tank and the volume of the waste that is transferred from the feed tank to the Saltstone Production Facility (SPF). These inputs are reported quarterly. As such, the disposal inventories are also updated quarterly; however, due to decay and ingrowth, the inventory values for some radionuclides can be misrepresented if the data is not tracked appropriately. Additionally, it is not feasible to analyze the feed tank samples for every possible radionuclide; therefore, a series of adjustments are necessary to estimate the concentrations of radionuclides that are not explicitly measured but still pose a potential dose risk. Prior to 2015, the SDF disposal inventories were updated using a series of spreadsheets that required users to perform a significant number of steps (including manually transferring data back and forth between a separate decay and ingrowth calculation software). Despite this labor intensive approach, the process only provided single point-in-time results. With multiple steps, minimal automation, and limited result data, this approach to inventory tracking was not ideal and minor mistakes were often identified during the equally cumbersome review process. As a process improvement, the simplified SDF Waste Inventory Disposed Estimator (SDF-WIDE) Model was developed using GoldSim software. The software allows users to identify specific dates to define the duration of the simulation, from the beginning of operations until the time of future facility closure, and provides graphical interfaces for displaying data over time. Further, GoldSim's Contaminant Transport Module is used to perform the decay and ingrowth calculations, making the model completely self-contained (i.e., there is no need to transfer intermediate data back and forth between different programs). GoldSim also includes model 'versioning' features that significantly reduce the time needed to perform the appropriate quality assurance reviews as required for each quarterly inventory update. By transitioning from the complex spreadsheets to the simplified SDFWIDE model, the time needed to perform updates to the SDF inventory has been reduced from days to hours, the risk of making human errors has been greatly mitigated, and users are able to quickly observe trends in the data over time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Mechanical Stress Improvement Process for Mitigating Primary Water Stress Corrosion Cracking in Nickel Alloy Butt Welds in Piping Systems Approved for Leak-Before-Break

In recent years, operating experience has shown that Alloy 82/182/600 materials used in reactor coolant system (RCS) pressure boundaries of pressurized water reactors (PWRs) are susceptible to primary water stress corrosion cracking (PWSCC). Cracking can initiate at the inside surface of these materials, in part, because of tensile residual stresses introduced by welding. These materials are present in piping systems that were approved by the U.S. Nuclear Regulatory Commission (NRC) for leak before-break (LBB) before PWSCC was found in RCS dissimilar metal butt welds. The identification of PWSCC led to concerns regarding the potential effect of this degradation on existing LBB analyses. In response to these concerns, the NRC Office of Nuclear Regulatory Research initiated a program entitled, “PWSCC in Leak-Before-Break Systems,” and a follow-on program entitled, “Degradation in Extremely Low Probability of Rupture (xLPR) Systems.” Under these programs, Pacific Northwest National Laboratory (PNNL) is assessing the various strategies being used by industry to manage potential or existing PWSCC in susceptible welds in piping systems approved for LBB. The commercial nuclear power industry has implemented strategies to manage potential or existing PWSCC at Alloy 82/182 dissimilar metal welds (DMW) in PWRs. One general strategy consists of management by a combination of mitigation plus inspection, where several mitigation techniques have been used by industry. The other general strategy is to manage potential PWSCC by inspection alone. At the request of the NRC, the American Society of Mechanical Engineers (ASME) took actions to develop improvements to the existing Code requirements to address the potential for PWSCC in Class 1 PWR piping butt welds fabricated with Alloy 82/182 weld materials. The ASME developed Code Case N-770, “Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities, Section XI, Division 1.” It was realized that the Code Case needed to be revised to address specific examinations such as welds with a design life of less than 10 years and post-weld preservice surface examinations. In general, the revised Code Case (N-770-1) has requirements for inspection of unmitigated as well as mitigated Alloy 82/182 RCS butt welds. As such, specific inspection requirements for welds mitigated by the Mechanical Stress Improvement Process (MSIP®), the subject of this technical letter report (TLR), are contained in the Code Case. The NRC incorporated ASME Code Case N-770-1 by reference into §50.55a (76 FR 36232, p. 36278) in June 2011.

MSIP↗

Improving process performances in coal gasification for power and synfuel production

This paper is aimed at developing process alternatives of conventional coal gasification. A number of possibilities are presented, simulated, and discussed in order to improve the process performances, to avoid the use of pure oxygen, and to reduce the overall CO{sub 2} emissions. The different process configurations considered include both power production, by means of an integrated gasification combined cycle (IGCC) plant, and synfuel production, by means of Fischer-Tropsch (FT) synthesis. The basic idea is to thermally couple a gasifier, fed with coal and steam, and a combustor where coal is burnt with air, thus overcoming the need of expensive pure oxygen as a feedstock. As a result, no or little nitrogen is present in the syngas produced by the gasifier; the required heat is transferred by using an inert solid as the carrier, which is circulated between the two modules. First, a thermodynamic study of the dual-bed gasification is carried out. Then a dual-bed gasification process is simulated by Aspen Plus, and the efficiency and overall CO{sub 2} emissions of the process are calculated and compared with a conventional gasification with oxygen. Eventually, the scheme with two reactors (gasifier-combustor) is coupled with an IGCC process. The simulation of this plant is compared with that of a conventional IGCC, where the gasifier is fed by high purity oxygen. According to the newly proposed configuration, the global plant efficiency increases by 27.9% and the CO{sub 2} emissions decrease by 21.8%, with respect to the performances of a conventional IGCC process. 29 refs., 7 figs., 5 tabs.

01 COAL, LIGNITE, AND PEAT↗

Modification of carbon nanotubes with fluorinated ionic liquid for improving processability of fluoro-ethylene-propylene

Fluorinated ionic liquid (F-IL), 1-(3-perfluorooctylpropyl)-3-methylimidazolium bis(perfluoroethylsufonyl)amine, had been successfully prepared and employed to modify multi-wall carbon nanotubes (MWCNTs) for improving the processability of fluoro-ethylene-propylene (FEP). The thermally decomposed temperature of F-IL was higher than 350 °C measured by thermal gravimetric analysis (TGA) which indicated that the fluorinated ionic liquid could be suitable for melting blend with FEP (blending at 290 °C) by a twin-screw extruder. Through “cation-π” interaction between the imidazolium cation of F-IL and the graphene surface of MWCNTs, MWCNTs can be modified with F-IL and used as nanofillers to improve the dispersity of MWCNTs in fluorocopolymer FEP verified by SEM images of the FEP nanocomposite. The structural characterization and mechanical property of FEP nanocomposite during the deformation were investigated by tensile experiments and simultaneous time-resolved wide-angle X-ray diffraction (WAXD) and small-angle X-ray scattering (SAXS) techniques.

36 MATERIALS SCIENCE↗

Improving Process Level Understanding of Boundary Layer Winds over the Northeast U.S. Shelf: The Third Wind Forecast Improvement Project (WFIP3)

The third Wind Forecast Improvement Project (WFIP3), a U.S. Department of Energy and National Oceanic and Atmospheric Administration sponsored investigation, sought to improve understanding of the physical phenomena in the atmosphere and ocean that dictate the structure and variability of wind and thermodynamic fields within the marine atmospheric boundary layer. WFIP3 focused on mesoscale and submesoscale flows -- including sea breezes, low-level jets, low-level clouds, and coastal storms -- and the ability of advanced numerical model parameterizations to represent them within fully coupled oceanic and atmospheric modeling systems and foundational weather forecast models. WFIP3 conducted a comprehensive 18-month observational study over the Northeast U.S. outer continental shelf, a high-use coastal zone, using a 3D multiscale sensor array to highly resolve the temporal, vertical, and horizontal structure of the coupled atmospheric and oceanic boundary layers. Multiple land-based study sites adjacent to the coastal ocean observed surface meteorology and vertical profiles of atmospheric properties via passive infrared and microwave radiometers, active lidars and radars, and radiosondes. At sea, an array of surface flux buoys and two vertical profiling lidar buoys observed both atmospheric and oceanic properties, augmented by land-based oceanographic radar systems and routine ship-based surveys. Intensive observations of the marine atmospheric boundary layer over the ocean was done from an air-sea interaction flux tower and extended deployments of a large autonomous barge platform. Numerous critical forecasting phenomena were observed that are being evaluated within regional coupled and uncoupled modeling systems, including the National Oceanic and Atmospheric Administration's foundational High-Resolution Rapid Refresh forecast model.

Kirincich, Anthony↗

Silicon Carbide Temperature Monitor Processing Improvements. Status Report

Silicon carbide (SiC) temperature monitors are used as temperature sensors in Advanced Test Reactor (ATR) irradiations at the Idaho National Laboratory (INL). Although thermocouples are typically used to provide real-time temperature indication in instrumented lead tests, other indicators, such as melt wires, are also often included in such tests as an independent technique of detecting peak temperatures incurred during irradiation. In addition, less expensive static capsule tests, which have no leads attached for real-time data transmission, often rely on melt wires as a post-irradiation technique for peak temperature indication. Melt wires are limited in that they can only detect whether a single temperature is or is not exceeded. SiC monitors are advantageous because a single monitor can be used to detect for a range of temperatures that occurred during irradiation. As part of the process initiated to make SiC temperature monitors available at the ATR, post-irradiation evaluations of these monitors have been previously completed at the High Temperature Test Laboratory (HTTL). INL selected the resistance measurement approach for determining irradiation temperature from SiC temperature monitors because it is considered to be the most accurate measurement. The current process involves the repeated annealing of the SiC monitors at incrementally increasing temperature, with resistivity measurements made between annealing steps. The process is time consuming and requires the nearly constant attention of a trained staff member. In addition to the expensive and lengthy post analysis required, the current process adds many potential sources of error in the measurement, as the sensor must be repeatedly moved from furnace to test fixture. This time-consuming post irradiation analysis is a significant portion of the total cost of using these otherwise inexpensive sensors. An additional consideration of this research is that, if the SiC post processing can be automated, it could be performed in an MFC hot cell, further reducing the time and expense of lengthy decontaminations prior to processing. Sections of this report provide a general description of resistivity techniques currently used to infer peak irradiation temperature from silicon carbide temperature monitors along with some representative data, the proposed concepts to improve the process of analyzing irradiated SiC temperature monitors, the completed efforts to prove the proposed concepts, and future activities. The efforts detailed here succeeded in designing and developing a real-time automated SiC resistivity measurement system, and performed two initial test runs. Activities carried out include the assembly and integration of the system hardware; the design and development of a preliminary monitor fixture; the design of a technique to automate the data analysis and processing; the development of the communication, coordination, and user software; and the execution and troubleshooting of test run experiments using the box furnace. Although the automation system performed as required, the designed fixture did not succeed in establishing the needed electrical contacts with the SiC monitor.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗