Search NASA⌕ Search

SEARCH · Search NASA

Results for “processability assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Technology Readiness Level Assessment Process as Applied to NASA Earth Science Missions

Technology assessments of fourteen science instruments were conducted within NASA using the NASA Technology Readiness Level (TRL) Metric. The instruments were part of three NASA Earth Science Decadal Survey missions in pre-formulation. The Earth Systematic Missions Program (ESMP) Systems Engineering Working Group (SEWG), composed of members of three NASA Centers, provided a newly modified electronic workbook to be completed, with instructions. Each instrument development team performed an internal assessment of its technology status, prepared an overview of its instrument, and completed the workbook with the results of its assessment. A team from the ESMP SEWG met with each instrument team and provided feedback. The instrument teams then reported through the Program Scientist for their respective missions to NASA's Earth Science Division (ESD) on technology readiness, taking the SEWG input into account. The instruments were found to have a range of TRL from 4 to 7. Lessons Learned are presented; however, due to the competition-sensitive nature of the assessments, the results for specific missions are not presented. The assessments were generally successful, and produced useful results for the agency. The SEWG team identified a number of potential improvements to the process. Particular focus was on ensuring traceability to guiding NASA documents, including the NASA Systems Engineering Handbook. The TRL Workbook has been substantially modified, and the revised workbook is described.

Systems Engineering↗

NASA Human System Risk Assessment Process

NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary two-page assessment representing the state of knowledge/evidence of that risk, available risk mitigations, traceability to the Space Flight Human System Standards (SFHSS) and program requirements, and future work required. These data then can drive coordinated budgets across the Human Research Program, the International Space Station, Crew Health and Safety and Advanced Exploration System budgets to provide the most economical and timely mitigations. The risk assessments were completed for the 6 DRMs and serve as the baseline for which subsequent research and technology development and crew health care portfolios can be assessed. The HSRB reviews each risk at least annually or when new evidence/information is available that adds to the body of evidence. The current status of each risk can be reported to program management for operations, budget reviews and general oversight of the human system risk management program.

Francisco, D.↗

Pinellas County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Pinellas County applied the Clear Sky Decision Support Toolkit to improve interagency coordination and gather data to analyze solar + storage projects for its critical facilities. This case study examines energy resilience strategies for the Pinellas County Solid Waste-to-Energy Plant. The Toolkit's modular assessment process developed institutional capacity and knowledge within the county and will assist in the research and application of future solar energy projects.

14 SOLAR ENERGY↗

It's Not a Big Sky After All: Justification for a Close Approach Prediction and Risk Assessment Process

There is often skepticism about the need for Conjunction Assessment from mission operators that invest in the "big sky theory", which states that the likelihood of a collision is so small that it can be neglected. On 10 February 2009, the collision between Iridium 3; and Cosmos 2251 provided an indication that this theory is invalid and that a CA process should be considered for all missions. This paper presents statistics of the effect of the Iridium/Cosmos collision on NASA's Earth Science Constellation as well as results of analyses which characterize the debris environment for NASA's robotic missions.

Newman, Lauri Kraft↗

Manatee County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Manatee County applied the Clear Sky Decision Support Toolkit to two of the county's critical facilities: Nolan Middle School, which serves as a special needs emergency shelter, and its Public Safety Complex (PSC), which houses critical services including emergency management, communications, and medical services, traffic control, and more. The PSC serves as the Emergency Operations Center during activation events. The Clear Sky assessment process improved interagency communication and coordination and informed siting decisions for a potential solar + storage system for the Manatee County PSC.

14 SOLAR ENERGY↗

SRB Materials and Processes Assessment from Laboratory and Ocean Environmental Tests

The Materials and Processes Laboratory evaluation of Solid Rocket Boosters (SRB) and Solid Rocket Motors (SRM) candidate material, both in-house and with ocean exposure tests at Panama City and Kennedy Space Center (KSC), Florida is presented. Early sample tests showed excellent seawater corrosion resistance for inconel 718 and titanium 6A1-4V alloys. Considerable corrosion and biofouling occurred with bare 2219-T87 aluminum. Subsequent tests conclusively demonstrated that epoxy coatings prevented corrosion of 2219-T87 aluminum as long as the coatings stays intact. The results and assessment of the series of ocean environmental tests that were conducted are also presented.

Source record↗

Decision Making and Communications Process Assessment of NASA Using Three Change Requests from the Space Launch System Program

This thesis investigated the communication and decision making process as part of the Systems Engineering practices at the NASA/Marshall Center to determine its level of effectiveness. Data was collected across three change requests to assess how decisions were made, how the decisions were communicated, and whether a process mattered in the formulation and dissemination of those decisions. Data results revealed the comprehensive decision making process for the technical change requests to be effective. Evidence revealed that the process was sufficiently tailored to accommodate the need of each individual technical change which promoted effective communication amongst the stakeholders in the formulation of the strategic decision recommendations elevated to upper management. However, data results also revealed the dissemination of the final decision and approval of the change requests from the higher organizational level down to all stakeholders was less effective. An establishment of a culmination meeting at the end of the change request decision process in which to close the communication loop with all entities would be beneficial.

Hicks, Karen Campbell↗

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ECUT: Energy Conversion and Utilization Technologies program biocatalysis research activity. Potential membrane applications to biocatalyzed processes: Assessment of concentration polarization and membrane fouling

Separation and purification of the products of biocatalyzed fermentation processes, such as ethanol or butanol, consumes most of the process energy required. Since membrane systems require substantially less energy for separation than most alternatives (e.g., distillation) they have been suggested for separation or concentration of fermentation products. This report is a review of the effects of concentration polarization and membrane fouling for the principal membrane processes: microfiltration, ultrafiltration, reverse osmosis, and electrodialysis including a discussion of potential problems relevant to separation of fermentation products. It was concluded that advanced membrane systems may result in significantly decreased energy consumption. However, because of the need to separate large amounts of water from much smaller amounts of product that may be more volatile than wate, it is not clear that membrane separations will necessarily be more efficient than alternative processes.

Ingham, J. D.↗

An Integrated Risk Assessment Process of Safety-Related Digital I&C Systems in Nuclear Power Plants

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems will greatly benefit existing light water reactors. However, the issue of software common cause failure (CCF) remains an obstacle in terms of qualification for digital technologies. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, design flaws could cause software CCFs to become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multilayer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission licensing procedures. In Fiscal Year 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades and designs. An integrated risk assessment for the DI&C process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. Here this paper summarizes these RISA efforts in the risk analysis of safety-related DI&C systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GSFC Risk Assessment Process for Inherited Items

The NASA Goddard Space Flight Center Safety and Mission Assurance Directorate is implementing an alternate process for approval of Spacecraft Inherited Items in accordance with Goddard Procedural Requirements 8730.5. A Commodity Risk Assessment Engineer is performing an Inherited Item Risk Assessment (I2RA) for the use of Spacecraft Standard Components (items generally necessary to control the spacecraft, e.g. reaction wheel assemblies) and payload flight spares or Built-to-Print items. The I2RA may take into account prior space flight performance, criticality of the component, qualification records, quality and reliability records, storage conditions, manufacturer assessments, and mission specific parameters like mission environment and duration. The I2RA provides a means to accept for the entire item materials, parts or workmanship non-conformances, that do not significantly increase risk.

Risk Assessment↗

Configuration Management Process Assessment Strategy

Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

Henry, Thad↗

Space transportation main engine cycle assessment process

The Advanced Launch System (ALS) program selection process for a space transportation main engine (STME) power cycle is described in terms of the methodology employed. Low cost, robustness, and high reliability are the primary parameters for engine choice, suggesting simplicity of design and efficient fabrication methods as the crucial characteristics. An evaluation methodology is developed based on the Pugh (1981) process and the King (1989) matrices. The cycle configurations considered are the gas generator (GG), the closed expander, and the open expander. The cycle assessment team determined that the GG cycle is favored by most cycle discriminators, based on an assessment of the characteristics in terms of ALS goals. The lower development risk of the GG-cycle STME is consistent with the goals of the ALS program in terms of reliability and cost efficiency.

Mcconnaughey, H. V.↗

Data Quality Assessment Process for Real-Time Data-Driven Traffic Microsimulation of Smart Corridor

Smart corridor digital twins are often created for the development and evaluation of emerging intelligent transportation systems and Connected and Autonomous Vehicle (CAV) technologies. However, limited guidance exists for data quality assessment for digital twin development. To address this, this paper discusses the data quality assessment utilized to develop data-driven real-time microscopic simulation models, i.e., digital twins, for two separate smart corridors: the North Avenue Smart Corridor in Atlanta, GA, and the Martin Luther King Smart Corridor in Chattanooga, Tennessee. This paper provides a summary of the author’s investigations of data requirements and data characteristics for the given smart corridor digital twin development efforts. With a focus on data, this summary includes a description of the data investigation process, key data issues observed, and strategies to address observed issues. Discussion is provided to help expand the lessons from these studies to other digital twin development efforts.

Saroj, Abhilasha [ORNL] (ORCID:0000000191178063)↗

City of Largo Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. The City of Largo used the Clear Sky Decision Support Toolkit to advance community solar + storage resilience goals by collaborating with staff across departments and disciplines and engaging with utility stakeholders. The City of Largo conducted an analysis of its Wastewater Treatment Facility (WWTF), which processes an average of 43 million gallons of wastewater daily. Water treatment operations are both critical and energy intensive, requiring sustained energy throughout the day.

14 SOLAR ENERGY↗

Hillsborough County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Hillsborough County used the Clear Sky Decision Support Toolkit to analyze solar + storage as an additional resiliency feature at its Brandon Support Operation Complex (BSOC). During normal operations, the BSOC houses water utility administration services and workspaces for water and wastewater engineers, facilities maintenance, and environmental management staff. During emergency management activation, the BSOC serves as an emergency hub for Emergency Support Function 3 (ESF-3), which includes public utilities, public works, and engineering staff support members. The BSOC is designated as a critical facility by the County.

14 SOLAR ENERGY↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗