Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Innovations in Voluntary Renewable Energy Procurement: Methods for Expanding Access and Lowering Cost for Communities, Governments, and Businesses (Technical Report)

This guide explores five innovative options for voluntarily procuring renewable energy generation or systems. The options and their descriptions are shown in Table 1. These methods can be replicated by a variety of stakeholders—including local governments, not-for-profit organizations, businesses, and utilities. The three decision trees in Figure 1 indicate which method may best suit a particular stakeholder’s needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hot Topic Brief: Emerging Policies for Mobilizing Private Sector Investment into Clean Energy in the Philippines

The Philippines has one of the highest electricity prices for commercial and residential consumers in the Association of Southeast Asian Nations (ASEAN) region with prices between $0.12 (commercial) and $0.20 (residential) per kilowatt-hour (kWh) (ERIA 2018). Significant reliance on imported coal and diesel is the primary cause of this cost to ratepayers. This 'hot topic brief' details new policies in the Philippines designed to diversify the country's fuel-mix and the opportunities for investments in renewable energy to reduce prices for consumers and industry. This brief focuses on two recent policies: 1. Renewable Portfolio Standard (RPS): The RPS establishes mandatory targets for each electric distribution utility--both publicly and privately owned--to procure renewable energy through 2030. 2. Green Energy Option Program (GEOP): The GEOP enables companies to independently procure renewable energy from third-party power producers, which can be used to help meet private sector renewable energy goals, unlock lower electricity costs, and increase energy security.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using Supercomputers to Speed Execution of the CAISO/PLEXOS 33% RPS Study

The study's official title is 'ISO Study of Operational Requirements and Market Impacts at 33% Renewable Portfolio Standard (RPS).' The stated objectives are twofold: (1) identifying operational requirements and resource options to reliably operate the ISO-controlled grid under a 33% RPS in 2020; and (2) inform market, planning, and policy/regulatory decisions by the ISO, state agencies, market participants, and other stakeholders. The first of these objectives requires the hourly estimates of integration requirements, measured in terms of operational ramp, load following and regulation capacity and ramp rates, as well as additional capacity to resolve operational violations. It also involves consideration of other variables that affect the results, such as the impact of different mixes of renewable technologies, and the impact of forecasting error and variability. The second objective entails supporting the CPUC to identify long-term procurement planning needs, costs, and options, as well as informing other decisions made by the CPUC and state agencies. For the ISO itself this includes informing state-wide transmission planning needs for renewables up to a 33% RPS, and informing design of wholesale markets for energy and ancillary services to facilitate provision of integration capacities. The study is designed in two phases. The first (current) phase is focused on operational requirements and addressing these requirements with existing and new conventional fossil generation; for instance, gas turbines and/or combined cycle units. The second (planned) phase will address the same operational requirements with a combination of conventional fossil generation resources, new non-generation resources, and a renewable resource dispatch. There are seven different scenarios considered in the current phase: a 20% RPS reference case; four 33% RPS cases (a reference case, a high out-of-state case, a high distributed generation case, and a low load case); an alternative 27.5% RPS case; and an all-gas case (no new renewables after 2008). In addition, the CPUC is planning a new set of cases that will alter the anticipated sets of runs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, Frank↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, F.↗

Potential Supply Chain and Cost Reduction Strategies for Advanced Nuclear Reactors

This milestone represents a level of effort to provide recommendations for a supply chain plan and establish relationships between advanced reactor companies and large companies in the oil & gas and chemical industries. It represents a starting point to develop the plan with options, general equipment lists, and rough associated cost estimates of major equipment and the associated systems needed. This effort will provide an opportunity to leverage the experience that oil & gas and chemicals companies possess in large capital equipment procurement, modularization, acquisition and installation. Potential supply chain solutions will be discussed and preliminary options for worldwide manufacturers will be elucidated. The goal of this effort will be to leverage the years of accumulated experience in the oil & gas and chemical industries in the area of capital equipment acquisition to understand the potential supply chain options and to reduce potential acquisition costs by optimizing the supply chain options for advanced nuclear reactor modularization, manufacturing and acquisition.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparative life cycle assessment of remote potable water supply for the Department of Defense

The Department of Defense (DOD) and other agencies, including relief organizations, require potable water for remote missions around the globe. As part of recent initiative by the U.S. Federal government through Executive Order 14057, the DOD has been instructed to investigate the sustainability of operations and practices within the context of climate change. One such practice that needs to be addressed is the procurement of potable water, an essential requirement of any remote mission or location. Currently, there are three primary means of procuring potable water at remote locations: bottled water, on-site purification, or tie-in to existing, local infrastructure. The first two operations are often considered the most secure options, but have sustainability concerns. The purpose of this study is to compare the environmental impacts of bottled water procurement versus on-site treatment via a mobile Reverse Osmosis Water Purification Unit (ROWPU), which uses multiple levels of filtration to make potable water from a local source. A cradle-to-gate assessment was developed for both systems to compare different options for potable water supply. An in person inventory was paired with data taken from the Ecoinvent 3.8 database to directly compare the two systems. The two systems are compared on a 5-year timeline to analyze the environmental impact of repeated bottled water transport versus diesel generator-fueled on-site treatment. Across all impact categories, the results indicate that high energy costs of the reverse osmosis process have significantly less impact on the environment than the repetitive transport and procurement of bottled water. The results of the study have important implications for advancing sustainable operations for remote communities or temporary settlements.

54 ENVIRONMENTAL SCIENCES↗

Methods and system for siting advanced nuclear reactors and evaluating energy policy concerns

There is a growing sociopolitical desire to develop cleaner energy sources in the United States and maintain energy security. Regardless of politics, many coal-fired electric plants have already been shut down and many utilities are vowing to retire their current coal-fired assets within the next two decades. Replacement power assets require consideration of appropriate siting. A geographic information system (GIS)-based multicriteria decision analysis approach is useful to assist utility and energy companies, as well as policymakers, to evaluate potential areas for siting new plants in the contiguous United States. A GIS-based framework is simply a database of location information that allows for mapping, querying, modeling, and analyzing data based on location. The spatial output can be structured to be visual, allowing for easier analysis of location data. The need to site additional power assets, including renewable resources and clean power sources, such as nuclear, led to the development of the Oak Ridge Siting Analysis for power Generation Expansion (OR-SAGE) tool discussed in this paper. The tool takes inputs such as population growth, water availability, environmental indicators, and tectonic and geological hazards to provide an in-depth visual analysis for siting options. Energy companies and other stakeholders can use OR-SAGE to procure feedback quickly and effectively on land suitability based on technology specific inputs. Policymakers can use OR-SAGE to analyze the impacts of future energy technology decisions, while balancing competing resource use. Overall, this paper discusses the recent use of OR-SAGE for these purposes and plans for future development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sault Tribe Building Efficiency Energy Audits

The Sault Ste. Marie Tribe of Chippewa Indians is working to reduce energy consumption and expense in Tribally-owned governmental buildings. The Sault Ste. Marie Tribe of Chippewa Indians will conduct energy audits of nine Tribally-owned governmental buildings in three counties in the Upper Peninsula of Michigan to provide a basis for evaluating and selecting the technical and economic viability of energy efficiency improvement options. The Sault Ste. Marie Tribe of Chippewa Indians will follow established Tribal procurement policies and procedures to secure the services of a qualified provider to conduct energy audits of nine designated buildings. The contracted provider will be required to provide a progress schedule to the Tribe prior to commencing the project and submit an updated schedule with their monthly billings. Findings and analysis reports will be required for buildings as completed, and a complete Energy Audit Summary Report will be required to be submitted with the provider?s final billing. Conducting energy audits of the nine governmental buildings will disclose building inefficiencies to prioritize and address, resulting in reduced energy consumption and expense. These savings will allow Tribal resources to be reallocated to direct services, which will benefit Tribal members and families.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Collaboration in Research and Engineering for Advanced Technology.

SNL/CA proposes the Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) facility to support customer-driven national security mission requirements while demonstrating a fiscally responsible approach to cost-control. SNL/CA realizes that due to the current backlog of capital projects in NNSA that following the normal Line Item process to procure capital funding is unlikely and therefore SNL/CA will be looking at all options including Alternative Financing.

99 GENERAL AND MISCELLANEOUS↗

Selection of materials for sodium fast reactor steam generators

Sodium Fast Reactor (SFR) is considered in France as the most mature technology of the different Generation IV systems. In the short-term the designing work is focused on the identification of the potential tracks to demonstrate licensing capability, availability, in-service inspection capability and economical performance. In that frame materials selection for the major components, as the steam generator, is a particularly key point managed within a French Research and Development program launched by AREVA, CEA and EDF. The choice of the material for the steam generator is indeed complex because various aspects shall be considered like mechanical and thermal properties at high temperature, interaction with sodium on one side and water and steam on the other side, resistance to wastage, procurement, fabrication, weldability and ability for inspection and in-situ intervention. The following relevant options are evaluated: the modified 9Cr1Mo ferritic-martensitic grade and the Alloy 800 austenitic grade. The objective of this paper is to assess for both candidates their abilities to reach the current SFR needs regarding material design data, from AFCEN RCC-MRx Code in particular, compatibility with environments and manufacturability. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Biofuels Fuels Technology Pathway Options for Advanced Drop-in Biofuels Production

Advanced drop-in hydrocarbon biofuels require biofuel alternatives for refinery products other than gasoline. Candidate biofuels must have performance characteristics equivalent to conventional petroleum-based fuels. The technology pathways for biofuel alternatives also must be plausible, sustainable (e.g., positive energy balance, environmentally benign, etc.), and demonstrate a reasonable pathway to economic viability and end-user affordability. Viable biofuels technology pathways must address feedstock production and environmental issues through to the fuel or chemical end products. Potential end products include compatible replacement fuel products (e.g., gasoline, diesel, and JP8 and JP5 jet fuel) and other petroleum products or chemicals typically produced from a barrel of crude. Considering the complexity and technology diversity of a complete biofuels supply chain, no single entity or technology provider is capable of addressing in depth all aspects of any given pathway; however, all the necessary expert entities exist. As such, we propose the assembly of a team capable of conducting an in-depth technology pathway options analysis (including sustainability indicators and complete LCA) to identify and define the domestic biofuel pathways for a Green Fleet. This team is not only capable of conducting in-depth analyses on technology pathways, but collectively they are able to trouble shoot and/or engineer solutions that would give industrial technology providers the highest potential for success. Such a team would provide the greatest possible down-side protection for high-risk advanced drop-in biofuels procurement(s).

02 PETROLEUM↗

Voluntary Renewable Energy Procurement Programs in Regulated Utility Markets

Multinational corporations are increasingly purchasing renewable energy (RE) to fulfill international commitments, reduce supply chain emissions, limit environmental impact, and secure stable and affordable electricity. The potential scale of global corporate RE purchasing has been estimated to be nearly 100 GW and growing; however, many markets still lack supportive enabling environments for corporations to access RE through on-site project development or private sector transactions. Even where allowed by law, on-site generation may be insufficient due to space and technical constraints, introducing additional challenges. Utility green pricing and utility green tariff programs backed by renewable energy certificates (RECs), referred to as utility green procurement programs (GPPs) in this report, offer powerful market-based solutions to utilities, regulators, and policymakers to provide corporate and other consumers with RE product options while generating revenue to support RE development. As RE markets expand around the globe, GPPs have proven to be effective mechanisms in market regimes, ranging from fully integrated state-owned utilities to broadly liberalized power markets. GPPs utilize RECs, which are a type of energy attribute certificate and closely resemble guarantees of origin, to track and ultimately monetize RE attributes that corporations and other buyers must procure to demonstrate progress against their RE commitments and make public claims of RE use. Time-tested and transparent REC accounting mechanisms provide market confidence, while at the same time offering flexibility to utilities, regulators, and customers for a range of applications. RECs are used in all types of electricity market structures, as indicated in Figure 1, but REC-based program designs and supporting components differ depending on the type of market. Liberalized markets allow for customers to contract directly with generators for electricity and RECs, while traditionally regulated markets with vertically integrated utility structures may have greater restrictions on generation asset ownership and electricity sales. RE markets can be further defined as being either mandatory or voluntary. Mandatory markets require suppliers to deliver specified amounts of RE to grid customers, such as under a renewable portfolio standard (RPS), while voluntary markets involve no legal mandates, but demand is driven by self-imposed customer goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO 2 ) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

03 NATURAL GAS↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Maturation

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability from the Orion spacecraft. For this mission, the pressure garment that was selected, for both functions, is the Modified Advanced Crew Escape Suit (MACES) with EVA enhancements and the life support option that was selected is the Exploration Portable Life Support System (PLSS). The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work has continued over the last year to better define the operations and hardware maturation of these systems. EVA simulations have been completed in the NBL and interfacing options have been prototyped and analyzed with testing planned for late 2014. For NBL EVA simulations, in 2013, components were procured to allow in-house build up for four new suits with mobility enhancements built into the arms. Boots outfitted with clips that fit into foot restraints have also been added to the suit and analyzed for possible loads. Major suit objectives accomplished this year in testing include: evaluation of mobility enhancements, ingress/egress of foot restraint, use of foot restraint for worksite stability, ingress/egress of Orion hatch with PLSS mockup, and testing with two crew members in the water at one time to evaluate the crew's ability to help one another. Major tool objectives accomplished this year include using various other methods for worksite stability, testing new methods for asteroid geologic sampling and improving the fidelity of the mockups and crew equipment. These tests were completed on a medium fidelity capsule mockup, asteroid vehicle mockup, and asteroid mockups that were more accurate for an asteroid type EVA than previous tests. Another focus was the design and fabrication of the interface between the MACES and the PLSS. The MACES was not designed to interface with a PLSS, hence an interface kit must accommodate the unique design qualities of the MACES and provide the necessary life support function connections to the PLSS. A prototype interface kit for MACES to PLSS has been designed and fabricated. Unmanned and manned testing of the interface will show the usability of the kit while wearing a MACES. The testing shows viability of the kit approach as well as the operations concept. The design will be vetted through suit and PLSS experts and, with the findings from the testing, the best path forward will be determined. As the Asteroid Redirect Mission matures, the suit/life support portion of the mission will mature along with it and EVA Tools & Equipment can be iterated to accommodate the overall mission objectives and compromises inherent in EVA Suit optimization. The goal of the EVA architecture for ARCM is to continue to build on the previously developed technologies and lessons learned, and accomplish the ARCM EVAs while providing a stepping stone to future missions and destinations.

Bowie, Jonathan T.↗

Design Option of Heat Exchanger for the Next Generation Nuclear Plant

The Next Generation Nuclear Plant (NGNP), a very High temperature Gas-Cooled Reactor (VHTGRS) concept, will provide the first demonstration of a closed-loop Brayton cycle at a commercial scale of a few hundred megawatts electric and hydrogen production. The power conversion system (PCS) for the NGNP will take advantage of the significantly higher reactor outlet temperatures of the VHTGRS to provide higher efficiencies than can be achieved in the current generation of light water reactors. Besides demonstrating a system design that can be used directly for subsequent commercial deployment, the NGNP will demonstrate key technology elements that can be used in subsequent advanced power conversion systems for other Generation IV reactors. In anticipation of the design, development and procurement of an advanced power conversion system for the NGNP, the system integration of the NGNP and hydrogen plant was initiated to identify the important design and technology options that must be considered in evaluating the performance of the proposed NGNP. As part of the system integration of the VHTGRS and hydrogen production plant, the intermediate heat exchanger is used to transfer the process heat from VHTGRS to hydrogen plant. Therefore, the design and configuration of the intermediate heat exchanger are very important. This paper will include analysis of one stage versus two stage heat exchanger design configurations and thermal stress analyses of a printed circuit heat exchanger, helical coil heat exchanger, and shell/tube heat exchanger.

99 GENERAL AND MISCELLANEOUS↗

The Impact Of The MCU Life Extension Solvent On Sludge Batch 8 Projected Operating Windows

As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NGS) and a new strip acid will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing or evaluations with the next generation solvent are required to determine the impact of these changes (if any) to Chemical Process Cell (CPC) activities, glass formulation strategies, and melter operations at the Defense Waste Processing Facility (DWPF). The introduction of the dilute (0.01 M) boric acid stream into the DWPF flowsheet has a potential impact on glass formulation and frit development efforts since B 2 O 3 is a major oxide in frits developed for DWPF. Prior knowledge of this stream can be accounted for during frit development efforts but that was not the case for Sludge Batch 8 (SB8). Frit 803 has already been recommended and procured for SB8 processing; altering the frit to account for the incoming boron from the strip effluent (SE) is not an option for SB8. Therefore, the operational robustness of Frit 803 to the introduction of SE including its compositional tolerances (i.e., up to 0.0125M boric acid) is of interest and was the focus of this study. The primary question to be addressed in the current study was: What is the impact (if any) on the projected operating windows for the Frit 803 - SB8 flowsheet to additions of B 2 O 3 from the SE in the Sludge Receipt and Adjustment Tank (SRAT)? More specifically, will Frit 803 be robust to the potential compositional changes occurring in the SRAT due to sludge variation, varying additions of ARP and/or the introduction of SE by providing access to waste loadings (WLs) of interest to DWPF? The Measurement Acceptability Region (MAR) results indicate there is very little, if any, impact on the projected operating windows for the Frit 803 - SB8 system regardless of the presence or absence of ARP and SE (up to 2 wt% B 2 O 3 contained in the SRAT and up to 2000 gallons of ARP). It should be noted that 0.95 wt% B 2 O 3 is the nominal projected concentration in the SRAT based on a 0.0125M boric acid flowsheet with 70,000 liters of SE being added to the SRAT.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗