Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Building a Metric

Launch Services Program is a Kennedy Space Center based program whose job it is to undertake all the necessary roles required to successfully launch Expendable Launch Vehicles. This project was designed to help Launch Services Program accurately report how successful they have been at launching missions on time or +/- 2 days from the scheduled launch date and also if they weren't successful, why. This information will be displayed in the form of a metric, which answers these questions in a clear and accurate way.

Spencer, Shakira↗

Pulsar Wind Nebulae, Space Velocities and Supernova Remnant

The original proposal for this LTSA grant was for X-ray studies of pulsars, and especially pulsar wind nebulae and what they could tell us about pulsar properties, especially their space velocities. By any metric, this program has been very successful. No fewer than 14 papers on directly related topics (and several dozen more on related topics) have been published in refereed journals with the PI as lead or co-author, all observational results that have had significant impact on the field. These include the first X-ray detection of the "Duck" pulsar, a clear demonstration that estimated pulsar ages can be off by over an order of magnitude (via observations of the young supernova remnant G11.2-0.3) and the detection of the first pulsar wind nebula around a millisecond pulsar. These publications have also resulted in 4 press releases. Moreover, they also represent the thesis work of two PhD students at MIT (Froney Crawford and Mike Pivovaroff) and one postdoctoral fellow, Bryan Gaensler, now Assistant Professor at Harvard.

Source record↗

Earned Value - Added

Earned value management (EVM)... can be one of the most insightful methods of synthesizing cost, schedule, and technical status information into a single set of program health metrics.

Jansen, Michael↗

Analyzing the test process using structural coverage

A large, commercially developed FORTRAN program was modified to produce structural coverage metrics. The modified program was executed on a set of functionally generated acceptance tests and a large sample of operational usage cases. The resulting structural coverage metrics are combined with fault and error data to evaluate structural coverage. It was shown that in the software environment the functionally generated tests seem to be a good approximation of operational use. The relative proportions of the exercised statement subclasses change as the structural coverage of the program increases. A method was also proposed for evaluating if two sets of input data exercise a program in a similar manner. Evidence was provided that implies that in this environment, faults revealed in a procedure are independent of the number of times the procedure is executed and that it may be reasonable to use procedure coverage in software models that use statement coverage. Finally, the evidence suggests that it may be possible to use structural coverage to aid in the management of the acceptance test processed.

Ramsey, James↗

Development of NASA Technical Standards Program Relative to Enhancing Engineering Capabilities

The enhancement of engineering capabilities is an important aspect of any organization; especially those engaged in aerospace development activities. Technical Standards are one of the key elements of this endeavor. The NASA Technical Standards Program was formed in 1997 in response to the NASA Administrator s directive to develop an Agencywide Technical Standards Program. The Program s principal objective involved the converting Center-unique technical standards into Agency wide standards and the adoption/endorsement of non-Government technical standards in lieu of government standards. In the process of these actions, the potential for further enhancement of the Agency s engineering capabilities was noted relative to value of being able to access Agencywide the necessary full-text technical standards, standards update notifications, and integration of lessons learned with technical standards, all available to the user from one Website. This was accomplished and is now being enhanced based on feedbacks from the Agency's engineering staff and supporting contractors. This paper addresses the development experiences with the NASA Technical Standards Program and the enhancement of the Agency's engineering capabilities provided by the Program s products. Metrics are provided on significant aspects of the Program.

Gill, Paul S.↗

A Dynamic Testing Complexity Metric

This paper introduces a dynamic metric that is based on the estimated ability of a program to withstand the effects of injected "semantic mutants" during execution by computing the same function as if the semantic mutants had not been injected. Semantic mutants include: (1) syntactic mutants injected into an executing program and (2) randomly selected values injected into an executing program's internal states. The metric is a function of a program, the method used for injecting these two types of mutants, and the program's input distribution; this metric is found through dynamic executions of the program. A program's ability to withstand the effects of injected semantic mutants by computing the same function when executed is then used as a tool for predicting the difficulty that will be incurred during random testing to reveal the existence of faults, i.e., the metric suggests the likelihood that a program will expose the existence of faults during random testing assuming faults were to exist. If the metric is applied to a module rather than to a program, the metric can be used to guide the allocation of testing resources among a program's modules. In this manner the metric acts as a white-box testing tool for determining where to concentrate testing resources. Index Terms: Revealing ability, random testing, input distribution, program, fault, failure.

Voas, Jeffrey↗

Method Of Predicting Size Of Software Under Development

Method of estimating size and complexity of large computer program under development based on metric called "function mass." Simplification of Demarco's "function bang" metric. Size of completed program usually expressed in terms of number of lines of code (SLOC), shown in previous research to be highly correlated with amount of development effort and therefore important predictor of development cost. Proposed method of estimating ultimate size of program is intermediate product of continuing research on estimation of size and structured analysis of developmental software.

Hihn, Jairus M.↗

Metrication report to the Congress

NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

Source record↗

Advanced Life Support System Value Metric

The NASA Advanced Life Support (ALS) Program is required to provide a performance metric to measure its progress in system development. Extensive discussions within the ALS program have reached a consensus. The Equivalent System Mass (ESM) metric has been traditionally used and provides a good summary of the weight, size, and power cost factors of space life support equipment. But ESM assumes that all the systems being traded off exactly meet a fixed performance requirement, so that the value and benefit (readiness, performance, safety, etc.) of all the different systems designs are exactly equal. This is too simplistic. Actual system design concepts are selected using many cost and benefit factors and the system specification is then set accordingly. The ALS program needs a multi-parameter metric including both the ESM and a System Value Metric (SVM). The SVM would include safety, maintainability, reliability, performance, use of cross cutting technology, and commercialization potential. Another major factor in system selection is technology readiness level (TRL), a familiar metric in ALS. The overall ALS system metric that is suggested is a benefit/cost ratio, [SVM + TRL]/ESM, with appropriate weighting and scaling. The total value is the sum of SVM and TRL. Cost is represented by ESM. The paper provides a detailed description and example application of the suggested System Value Metric.

Jones, Harry W.↗

United States Civil Space Policy: Summary of a Workshop

What are the principal purposes, goals, and priorities of the U.S. civil space program? This question was the focus of the workshop on civil space policy held November 29-30, 2007, by the Space Studies Board (SSB) and the Aeronautics and Space Engineering Board (ASEB) of the National Research Council (NRC). In addressing this question, invited speakers and panelists and the general discussion from this public workshop explored a series of topics, including the following: (1) Key changes and developments in the U.S. civil space program since the new national Vision for Space Exploration2 (the Vision) was articulated by the executive branch in 2004; (2) The fit of space exploration within a broader national and international context; (3) Affordability, public interest, and political will to sustain the civil space program; (4) Definitions, metrics, and decision criteria for the mix and balance of activities within the program portfolio; (5) Roles of government in Earth observations from space; and (6) Gaps in capabilities and infrastructure to support the program.

Source record↗

Advanced Life Support System Value Metric

The NASA Advanced Life Support (ALS) Program is required to provide a performance metric to measure its progress in system development. Extensive discussions within the ALS program have led to the following approach. The Equivalent System Mass (ESM) metric has been traditionally used and provides a good summary of the weight, size, and power cost factors of space life support equipment. But ESM assumes that all the systems being traded off exactly meet a fixed performance requirement, so that the value and benefit (readiness, performance, safety, etc.) of all the different systems designs are considered to be exactly equal. This is too simplistic. Actual system design concepts are selected using many cost and benefit factors and the system specification is defined after many trade-offs. The ALS program needs a multi-parameter metric including both the ESM and a System Value Metric (SVM). The SVM would include safety, maintainability, reliability, performance, use of cross cutting technology, and commercialization potential. Another major factor in system selection is technology readiness level (TRL), a familiar metric in ALS. The overall ALS system metric that is suggested is a benefit/cost ratio, SVM/[ESM + function (TRL)], with appropriate weighting and scaling. The total value is given by SVM. Cost is represented by higher ESM and lower TRL. The paper provides a detailed description and example application of a suggested System Value Metric and an overall ALS system metric.

Jones, Harry W.↗

ATD-2 TFDM Terminal Publication Service (TTP)

Learn the many benefits of the newest SWIM feed from the surface system. This will discuss current options to onboard with this feed, allow participants to ask questions and provide some examples of how the data can be used. Service Includes Flight Data Individual flight updates containing flight identifiers, targeted times, actual times, runway, parking gate, spot, departure fix (predicted, assigned, actual as appropriate), flight states, and more. Airport Information Airport configurations, airport and runway rates, ramp closures, runway closures, taxiway closures. Traffic Management Restrictions Call for Release programs departure MIT/MINIT restrictions, departure stop/ground stop programs. Along with list of impacted flights for each. Flight Delay Airport and runway delay by arrival, departure, and total. Operational Metrics Metrics on airport throughput and individual flight metrics. Surface Metering Program SMP start / end times, metering constraint type / details, updates to existing programs, TMAT compliance window, departure queue length, and more.

Gorman, Shawn M.↗

Automatic documentation system extension to multi-manufacturers' computers and to measure, improve, and predict software reliability

The DOMONIC system has been modified to run on the Univac 1108 and the CDC 6600 as well as the IBM 370 computer system. The DOMONIC monitor system has been implemented to gather data which can be used to optimize the DOMONIC system and to predict the reliability of software developed using DOMONIC. The areas of quality metrics, error characterization, program complexity, program testing, validation and verification are analyzed. A software reliability model for estimating program completion levels and one on which to base system acceptance have been developed. The DAVE system which performs flow analysis and error detection has been converted from the University of Colorado CDC 6400/6600 computer to the IBM 360/370 computer system for use with the DOMONIC system.

Simmons, D. B.↗

NASA Technical Standards Program

The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

Gill, Paul S.↗

NASA Technical Standards Program

The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

Gill, Paul S.↗

Cognitive Performance in Operational Environments

Optimal cognition during complex and sustained operations is a critical component for success in current and future military operations. "Cognitive Performance, Judgment, and Decision-making" (CPJD) is a newly organized U.S. Army Medical Research and Materiel Command research program focused on sustaining operational effectiveness of Future Force Warriors by developing paradigms through which militarily-relevant, higher-order cognitive performance, judgment, and decision-making can be assessed and sustained in individuals, small teams, and leaders of network-centric fighting units. CPJD evaluates the impact of stressors intrinsic to military operational environments (e.g., sleep deprivation, workload, fatigue, temperature extremes, altitude, environmental/physiological disruption) on military performance, evaluates noninvasive automated methods for monitoring and predicting cognitive performance, and investigates pharmaceutical strategies (e.g., stimulant countermeasures, hypnotics) to mitigate performance decrements. This manuscript describes the CPJD program, discusses the metrics utilized to relate militarily applied research findings to academic research, and discusses how the simulated combat capabilities of a synthetic battle laboratory may facilitate future cognitive performance research.

Russo, Michael↗

Product Operations Status Summary Metrics

The Product Operations Status Summary Metrics (POSSUM) computer program provides a readable view into the state of the Phoenix Operations Product Generation Subsystem (OPGS) data pipeline. POSSUM provides a user interface that can search the data store, collect product metadata, and display the results in an easily-readable layout. It was designed with flexibility in mind for support in future missions. Flexibility over various data store hierarchies is provided through the disk-searching facilities of Marsviewer. This is a proven program that has been in operational use since the first day of the Phoenix mission.

Takagi, Atsuya↗

Scenario Complexity for Unmanned Aircraft System Traffic

This work introduces an approach to estimate the complexity of a low-altitude air traffic scenario involving multiple UASs using mathematical programming. Given a set of multi-point UAS flight trajectories, vehicle dynamics, and a conflict resolution algorithm, an abstract model is developed such that it can be solved quickly using a mathematical programming optimization software without running high-fidelity simulations that can be computationally expensive and may not suit real-time applications. In the abstract model, each vehicle is represented by a time-varied vector associated with position, speed, and heading information. The total extra distance that aircraft need to divert from their original routes to avoid collisions is computed and used to setup a quadratic programming formula. The metrics including the number of conflicts and extra distances travelled by all vehicles are then utilized to estimate the complexity of a given UAS flight scenario. Results and verification against high-fidelity simulations will be provided in the final draft.

UTM↗