Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Planetary Protection is Not a One Size Fits All Missions Approach: Enabling the Planetary Protection Programmatic and Engineering Process

Missions have a wide range of variables that change their management and engineering structure (e.g., competed vs directed missions, multiple NASA centers, international partnerships, increased commercial collaborations, etc.). Why would an identical planetary protection approach and structure for each mission make sense in this evolving landscape? Missions do not fit in a one-size-fits-all approach, likewise their planetary protection process should not be a one-size-fits-all approach. During the significant update to NPR 8715.24 and NASA-STD-8719.27 planetary protection policies, the programmatic execution and engineering implementation processes were changed to provide clarification, streamlining, and expansion to include alternative approaches. From a programmatic perspective, these changes include the flexibility in timing and combination of gate products in addition to providing varying levels of technical depth commensurate and appropriate with the mission categorization. From a technical perspective, these changes include the ability to A) leverage either a performance-based and/or a prescriptive-based approach, B) identify applicable international consensus standards for verification, and C) propose alternative methods that adhere to sound scientific and engineering consensus. This presentation will directly highlight the culture shift in planetary protection, areas of flexibility available to the technical community for mission program and engineering execution, and feature some of the specific mission scenarios that have already leveraged such processes.

Nick Benardini↗

Programmatic Value Determination and Termination of Safeguards Process for Accountable Nuclear Materials at the Nevada National Security Site

The Nuclear Material Management & Storage (MNN&S) and the Material Control and Accountability (MC&A) programs at the Nevada National Security Site (NNSS) have the responsibility to ensure accountable nuclear material (NM) no longer need by programs/projects is managed, coordinated, and dispositioned in accordance with DOE Orders 410.2, “Management of Nuclear Materials, and 474.2, “Nuclear Material Control and Accountability”. CD-NMM.007, “Programmatic Value Determination of Nuclear Material and Termination of Safeguards” is the document which lays out the process to fulfill these requirements. This paper defines the roles and responsibilities for all the organizations involved, the programmatic value determination (PVD), disposition planning, and termination of safeguards (ToS)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Programmatic risk balancing

This paper presents the first tool demonstration and assessment for balancing programmatic risk.

programmatic risk integration↗

Learning Team Review 2016-0001: Installing Outlets for Programmatic Equipment

The purpose of a Learning Team is to transfer and communicate the information into operational feedback and improvement. We want to pay attention to the small things that go wrong because they are often early warning signals and may provide insight into the health of the whole system. An ESR was placed in the October of 2015 to move/install a number of 120V and 208V outlets in 455-104B to support programmatic furnace needs. Electrical design review was completed for ESR 22217 on February 22, 2016 and a Design Change Form completed describing the modification needed as: demolish 1 existing receptacle and circuit leaving conduit and jbox for use to install new receptacle and 5 new receptacles/circuits are required and one existing receptacle is to be relocated, listed under FSR 149229. The FSR scope of work was written:: Please have the Electricians come out to perform demolition (1ea.), installation (6ea.)& relocation (1ea.) of receptacles / circuits. ESR 22217 & DCF-16-35-0455-1281 is in place for this work. Coordinate final receptacle locations with Laboratory Resident. Contact John Dunwoody or O-MC for this information. WO# 545580-01 was signed on April 20, 2016.: Electricians to perform demolition, installation, & relocation of receptacles / circuits PER attached DCF-16-0455-1281-SK-1.

99 GENERAL AND MISCELLANEOUS↗

Technical & Programmatic Solutions for Direct Disposal of DPCs: Draft Outline and Staffing Plan

This is a work planning document that describes technical and programmatic goals for disposition of spent nuclear fuel (SNF) that is currently in dry storage in dual-purpose canisters (DPCs), or will be in the foreseeable future. It then describes how those goals can be promoted by a research and development (R&D) program. The needed R&D is compared to the ongoing work supported by the U.S. Department of Energy in FY18, and planned for FY19 and beyond. Some additional R&D activities are recommended, and plans are presented for technical integration activities that address the efficacy of the Direct Disposal of DPCs program (WBS 1.08.01.03.05), and integration with the overall Disposal Research program (WBS 1.08.01.03). The planned deliverable for this work package in FY19 (M2SF-1951\1010305051-Analysis of Solutions for DPC Disposal; 6/19/19) will be the product of this workplan. The deliverable will evaluate technical options for DPC direct disposal, taking into account the range ofpast and current DPC designs in the existing fleet. It will describe a set of goals for successful disposition of spent fuel in DPCs. It will analyze the scope and timing of needed R&D activities (R&D Plan), and discuss the uses of generic and site-specific analyses. Where appropriate, it will use alternative management cases to represent how DPC direct disposal could be incorporated in the overall geologic disposal program, given uncertainties in program direction and funding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Space processing applications payload equipment study. Volume 3: Programmatics

The programmatic aspects of the space processing applications program and the methods of accommodating SPA payloads aboard the Shuttle/Spacelab host vehicle are discussed. An examination of the NASA traffic model shows that there exists a potential for 178 SPA payloads from the overall total of 727 flights specified. This could represent up to one quarter of the total shuttle flights during the 12-year-long period covered by the traffic model. The SPA payload will range from austere for shared flight opportunities to dedicated where space processing will encompass the total flight payload allocations. The major modes of use to SPA will include dedicated Spacelab missions, shared Spacelab missions and shared automated payloads attached to the pallet with the necessary control and display equipment in the host vehicle. Several layout drawings and artist's renderings have been completed to illustrate the various potential configurations available to accommodate the SPA payload equipment.

Hammel, R. L.↗

Manned orbital systems concept study. Book 4: Programmatics for extended-duration missions

The cost estimates, schedule data, and funding distributions generated in the Manned Orbital Systems Concepts (MOSC) study are presented. The overall objectives were to examine the requirements for, and to describe, a cost-effective concept for an orbital facility capable of supporting manned operations in earth orbit beyond the 7-to-30-day mission duration provided by the Shuttle/Spacelab system. The cost, schedule, and other programmatic data were developed to provide information useful for their long-range planning activities. The major portion of the data documented and discussed consists of project- and system-level schedule and funding information and also project-, system-, and subsystem-level cost summaries.

Source record↗

Economic and programmatic considerations for advanced transportation propulsion technology

Requirements for space transportation will increase after the Space Shuttle becomes operational. Shuttle derivatives and new earth-to-orbit vehicles are compared economically. The addition of both one and two new vehicle types are considered. Programmatic considerations are included in deriving a scenario which appears reasonable and includes the Space Shuttle, a heavy-lift cargo derivative of the Shuttle, a unique dual-fuel orbit transfer vehicle, and a small new earth-to-orbit vehicle in the foreseeable future. Large new orbital transfer and earth-to-orbit vehicles would be added when needed.

Martin, J. A.↗

Evolutionary space platform concept study. Volume 3: Programmatics for manned space platform concepts

The programmatic data for the reference concept of the Manned Space Platform is presented. Details regarding work breakdown structure (WBS) and dictionary, the facilities and equipment required to produce the modules, the project schedule and logic diagram, a preliminary assessment of environmental impacts and details regarding the estimated costs for the reference concept are included. The proposed WBS which was developed to provide summary and system level segregation of the nonrecurring and recurring portions of the Manned Space Platform project is also included. The accompanying dictionary outlines the function and activities contained within each WBS element. The facility and equipment required to produce the various modules is discussed. Generally, required equipment is within the existing state of the art although the size of some of the items to be manufactured is a consideration. A preliminary manufacturing flow was also provided. The project schedules presented consist of the Master Project Summary Schedule, the Master Project Phasing Chart and the Logic Network.

Source record↗

Space station needs, attributes and architectural options study. Volume 5: Cost benefits and programmatic analyses

The science, applications, commercial, U.S. national security and space operations missions that would require or be materially benefited by the availability of a permanent manned space station in low Earth orbit are considered. Space station attributes and capabilities which will be necessary to satisfy these mission requirements are identified. Emphasis is placed on the identification and validation of potential users, their requirements, and the benefits accruing to them from the existence of a space station, and the programmatic and cost implications of a space station program.

Source record↗

Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

Source record↗

The National Aeronautics and Space Administration (NASA) Tracking and Data Relay Satellite System (TDRSS) program Economic and programmatic, considerations

The Tracking and Data Relay Satellite System (TDRSS) represents the principal element of a new space-based tracking and communication network which will support NASA spaceflight missions in low earth orbit. In its complete configuration, the TDRSS network will include a space segment consisting of three highly specialized communication satellites in geosynchronous orbit, a ground segment consisting of an earth terminal, and associated data handling and control facilities. The TDRSS network has the objective to provide communication and data relay services between the earth-orbiting spacecraft and their ground-based mission control and data handling centers. The first TDRSS spacecraft has been now in service for two years. The present paper is concerned with the TDRSS experience from the perspective of the various programmatic and economic considerations which relate to the program.

Aller, R. O.↗

Background and programmatic approach for the development of orbital fluid resupply tankers

Onorbit resupply of fluids will be essential to the evolving generation of large and long-life orbital stations and satellites. These types of services are also needed to improve the economics of space operations, and not only optimize the expenditures for government funded programs, but also pave the way for commercial development of space resources. To meet these requirements, a family of tankers must be developed to resupply a variety of fluids. Economics of flight hardware development will require that each tanker within this family be capable of satisfying a variety of functions, including not only fluid resupply from the Space Shuttle Orbiter, but also resupply from Space Station and the orbital maneuvering vehicle (OMV). This paper discusses the justification, the programmatic objectives, and the advanced planning within NASA for the development of this fleet of multifunction orbital fluid resupply tankers.

Griffin, J. W.↗

Conceptual design and programmatics studies of space station accommodations for Life Sciences Research Facilities (LSRF)

Conceptual designs and programmatics of the space station accommodations for the Life Sciences Research Facilities (LSRF) are presented. The animal ECLSS system for the LSRF provides temperature-humidity control, air circulation, and life support functions for experimental subjects. Three ECLSS were studied. All configurations presented satisfy the science requirements for: animal holding facilities with bioisolation; facilities interchangeable to hold rodents, small primates, and plants; metabolic cages interchangeable with standard holding cages; holding facilities adaptable to restrained large primates and rodent breeding/nesting cages; volume for the specified instruments; enclosed ferm-free workbench for manipulation of animals and chemical procedures; freezers for specimen storage until return; and centrifuge to maintain animals and plants at fractional g to 1 g or more, with potential for accommodating humans for short time intervals.

Source record↗

The new Space Shuttle Transportation System (STS) - Problem, performance, supportability, and programmatic trending program

This paper describes the NASA Space Shuttle Trend Analysis program. The four main areas of the program - problem/reliability, performance, supportability, and programmatic trending - are defined, along with motivation for these areas, the statistical methods used, and illustrative Space Shuttle applications. Also described is the NASA Safety, Reliability, Maintainability and Quality Assurance (SRM&QA) Management Information Center, used to focus management attention on key near-term launch concerns and long-range mission trend issues. Finally, the computer data bases used to support the program and future program enhancements are discussed.

Crawford, J. L.↗

Advanced protein crystal growth programmatic sensitivity study

The purpose of this study is to define the costs of various APCG (Advanced Protein Crystal Growth) program options and to determine the parameters which, if changed, impact the costs and goals of the programs and to what extent. This was accomplished by developing and evaluating several alternate programmatic scenarios for the microgravity Advanced Protein Crystal Growth program transitioning from the present shuttle activity to the man tended Space Station to the permanently manned Space Station. These scenarios include selected variations in such sensitivity parameters as development and operational costs, schedules, technology issues, and crystal growth methods. This final report provides information that will aid in planning the Advanced Protein Crystal Growth Program.

Source record↗