Search NASASearch

SEARCH · Search NASA

Results for “progress”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Progressive Failure Analysis Methodology for Laminated Composite Structures

A progressive failure analysis method has been developed for predicting the failure of laminated composite structures under geometrically nonlinear deformations. The progressive failure analysis uses C(exp 1) shell elements based on classical lamination theory to calculate the in-plane stresses. Several failure criteria, including the maximum strain criterion, Hashin's criterion, and Christensen's criterion, are used to predict the failure mechanisms and several options are available to degrade the material properties after failures. The progressive failure analysis method is implemented in the COMET finite element analysis code and can predict the damage and response of laminated composite structures from initial loading to final failure. The different failure criteria and material degradation methods are compared and assessed by performing analyses of several laminated composite structures. Results from the progressive failure method indicate good correlation with the existing test data except in structural applications where interlaminar stresses are important which may cause failure mechanisms such as debonding or delaminations.

Sleight, David W.

Probabilistic Assessment of Fracture Progression in Composite Structures

This report describes methods and corresponding computer codes that are used to evaluate progressive damage and fracture and to perform probabilistic assessment in built-up composite structures. Structural response is assessed probabilistically, during progressive fracture. The effects of design variable uncertainties on structural fracture progression are quantified. The fast probability integrator (FPI) is used to assess the response scatter in the composite structure at damage initiation. The sensitivity of the damage response to design variables is computed. The methods are general purpose and are applicable to stitched and unstitched composites in all types of structures and fracture processes starting from damage initiation to unstable propagation and to global structure collapse. The methods are demonstrated for a polymer matrix composite stiffened panel subjected to pressure. The results indicated that composite constituent properties, fabrication parameters, and respective uncertainties have a significant effect on structural durability and reliability. Design implications with regard to damage progression, damage tolerance, and reliability of composite structures are examined.

Chamis, Christos C.

Progress Toward the Stars: An Overview of Ares I First Stage Elements

This viewgraph presentation reviews the progress made in the development of the Ares The information includes an overview of the Ares Launch Vehicles, progress toward the Preliminary Design Review (PDR), progress on design, development, test, and evaluation and technical progress in the development of the Ares I First Stage subsystem.

Williams, Thomas J.

Current Scientific Progress and Future Scientific Prospects Enabled by Spaceborne Precipitation Radar Measurements

First, we examine current scientific progress and understanding that have been possible through use of spaceborne precipitation radar measurements being provided by the TRMM and CloudSat satellites. Second, we look across a future 20-year time frame to assess how and why anticipated improvements in space radar systems will further advance scientific progress into topic areas once considered beyond the realm of space-based remote sensing. JAXA's 13.8 GHz Ku-band cross-track scanning Precipitation Radar (PR) developed for flight on NASA's non-sun-synchronous, diurnally-precessing TRMM satellite, was the first Earth radar flown in space that was designed specifically for precipitation measurement. Its proven accuracy in measuring global rainfall in the tropics and sub-tropics and its unanticipated longevity in continuing these measurements beyond a full decade have established the standards against which all follow-up and future space radars will be evaluated. In regards to the current PR measurement time series, we will discuss a selection of major scientific discoveries and impacts which have set the stage for future radar measuring systems. In fact, the 2nd contemporary space radar applicable for terrestrial precipitation measurement, i.e., JPL-CSA's 94 GHz nadir-staring Cloud Profiling Radar (CPR) flown on NASA's sun-synchronous CloudSat satellite, although designed primarily for measurement of non-precipitating cloud hydrometeors and aerosols, has also unquestionably advanced precipitation measurement because CPR's higher frequency and greatly increased sensitivity (approximately 30 dBZ) has enabled global observations of light rain rate spectrum processes (i.e., rain rates below 0.05 mm per hourand of precipitation processes in the high troposphere (particularly ice phase processes). These processes are beyond reach of the TRMM radar because the PR sensitivity limit is approximately 17 dBZ which means its lower rain rate cutoff is around 0.3 mm per hour and its vertical profiling acuity is greatly limited above the melting layer. Thus, the newer CPR measurements have become important for a variety of scientific reasons that will be highlighted and assessed. In considering scientific progress likely to stem from future precipitation radar systems, we will specifically examine possible scientific impacts from three anticipated missions for which NASA and various of its space agency partners are expected to lead the way. These three missions are: (1) the nearterm Global Precipitation Measuring (GPM) Mission; (2) the decadal timeline Aerosol and Cloud Experiment (ACE) Mission; and the post-decadal timeline NEXRAD in Space (NIS) Mission. The observational capabilities of the planned radar systems for each of these three satellite missions are distinct from each other and each provides progressive improvements in precipitation measuring and scientific research capabilities relative to where we are now -- insofar as TRMM PR and the CloudSat CPR capabilities. The potential innovations in scientific research will be discussed in a framework of likely synergisms between next-generation radar capabilities and accessible dynamical and microphysical properties that have heretofore evaded detection.

Smith, Eric A.

Progress of the NASA/USGS Lunar Regolith Simulant Project

Beginning in 2004 personnel at MSFC began serious efforts to develop a new generation of lunar simulants. The first two products were a replication of the previous JSC-1 simulant under a contract to Orbitec and a major workshop in 2005 on future simulant development. Beginning in 2006 the project refocused its efforts and approached simulant development in a new and more comprehensive manner, examining new approaches in simulant development and ways to more accurately compare simulants to actual lunar materials. This led to a multi-year effort with five major tasks running in parallel. The five tasks are Requirements, Lunar Analysis, Process Development, Feed Stocks, and Standards. Major progress has been made in all five areas. A substantial draft of a formal requirements document now exists and has been largely stable since 2007. It does evolve as specific details of the standards and Lunar Analysis efforts proceed. Lunar Analysis has turned out to be vastly more difficult than anticipated. After great effort to mine existing published and gray literature, the team has realized the necessity of making new measurements of the Apollo samples, an effort that is currently in progress. Process development is substantially ahead of expectations in 2006. It is now practical to synthesize glasses of appropriate composition and purity. It is also possible to make agglutinate particles in significant quantities. A series of minerals commonly found on the Moon has been synthesized. Separation of mineral constituents from starting rock material is also proceeding. Customized grinding and mixing processes have been developed and tested are now being documented. Identification and development of appropriate feedstocks has been both easier and more difficult than anticipated. The Stillwater Mining Company, operating in the Stillwater layered mafic intrusive complex of Montana, has been an amazing resource for the project, but finding adequate sources for some of the components remains a difficult problem. For example the ratio of clino- to ortho-pyroxenes in the Stillwater is not an exact match for lunar materials. One of the sources being examined as an alternative pyroxene source is the Bushveld Complex in South Africa. Standards have been a major success for the project. The Figure of Merit algorithms have been created, tested, and are being considered for an ISO standard. Agreement has been reached in the community about how to make many of the critical measurements. There remains much work to do: (1) driving down the cost of simulants remains a major obstacle; (2) documentation and cost data analysis have not kept up with progress; (3) educating users in the complexity of the lunar regolith and the use of simulants remains a major task. In summary the project has made enormous progress and is successfully placing simulant development and use on a rigorous, scientifically defensible, engineering basis.

Rickman, Doug

Progressive Classification Using Support Vector Machines

An algorithm for progressive classification of data, analogous to progressive rendering of images, makes it possible to compromise between speed and accuracy. This algorithm uses support vector machines (SVMs) to classify data. An SVM is a machine learning algorithm that builds a mathematical model of the desired classification concept by identifying the critical data points, called support vectors. Coarse approximations to the concept require only a few support vectors, while precise, highly accurate models require far more support vectors. Once the model has been constructed, the SVM can be applied to new observations. The cost of classifying a new observation is proportional to the number of support vectors in the model. When computational resources are limited, an SVM of the appropriate complexity can be produced. However, if the constraints are not known when the model is constructed, or if they can change over time, a method for adaptively responding to the current resource constraints is required. This capability is particularly relevant for spacecraft (or any other real-time systems) that perform onboard data analysis. The new algorithm enables the fast, interactive application of an SVM classifier to a new set of data. The classification process achieved by this algorithm is characterized as progressive because a coarse approximation to the true classification is generated rapidly and thereafter iteratively refined. The algorithm uses two SVMs: (1) a fast, approximate one and (2) slow, highly accurate one. New data are initially classified by the fast SVM, producing a baseline approximate classification. For each classified data point, the algorithm calculates a confidence index that indicates the likelihood that it was classified correctly in the first pass. Next, the data points are sorted by their confidence indices and progressively reclassified by the slower, more accurate SVM, starting with the items most likely to be incorrectly classified. The user can halt this reclassification process at any point, thereby obtaining the best possible result for a given amount of computation time. Alternatively, the results can be displayed as they are generated, providing the user with real-time feedback about the current accuracy of classification.

Wagstaff, Kiri

Method and system for progressive mesh storage and reconstruction using wavelet-encoded height fields

Systems and methods are provided for progressive mesh storage and reconstruction using wavelet-encoded height fields. A method for progressive mesh storage includes reading raster height field data, and processing the raster height field data with a discrete wavelet transform to generate wavelet-encoded height fields. In another embodiment, a method for progressive mesh storage includes reading texture map data, and processing the texture map data with a discrete wavelet transform to generate wavelet-encoded texture map fields. A method for reconstructing a progressive mesh from wavelet-encoded height field data includes determining terrain blocks, and a level of detail required for each terrain block, based upon a viewpoint. Triangle strip constructs are generated from vertices of the terrain blocks, and an image is rendered utilizing the triangle strip constructs. Software products that implement these methods are provided.

Baxes, Gregory A.

Predicting Failure Progression and Failure Loads in Composite Open-Hole Tension Coupons

Failure types and failure loads in carbon-epoxy [45n/90n/-45n/0n]ms laminate coupons with central circular holes subjected to tensile load are simulated using progressive failure analysis (PFA) methodology. The progressive failure methodology is implemented using VUMAT subroutine within the ABAQUS(TradeMark)/Explicit nonlinear finite element code. The degradation model adopted in the present PFA methodology uses an instantaneous complete stress reduction (COSTR) approach to simulate damage at a material point when failure occurs. In-plane modeling parameters such as element size and shape are held constant in the finite element models, irrespective of laminate thickness and hole size, to predict failure loads and failure progression. Comparison to published test data indicates that this methodology accurately simulates brittle, pull-out and delamination failure types. The sensitivity of the failure progression and the failure load to analytical loading rates and solvers precision is demonstrated.

Arunkumar, Satyanarayana

Method and system for progressive mesh storage and reconstruction using wavelet-encoded height fields

Systems and methods are provided for progressive mesh storage and reconstruction using wavelet-encoded height fields. A method for progressive mesh storage includes reading raster height field data, and processing the raster height field data with a discrete wavelet transform to generate wavelet-encoded height fields. In another embodiment, a method for progressive mesh storage includes reading texture map data, and processing the texture map data with a discrete wavelet transform to generate wavelet-encoded texture map fields. A method for reconstructing a progressive mesh from wavelet-encoded height field data includes determining terrain blocks, and a level of detail required for each terrain block, based upon a viewpoint. Triangle strip constructs are generated from vertices of the terrain blocks, and an image is rendered utilizing the triangle strip constructs. Software products that implement these methods are provided.

Baxes, Gregory A.

Investigating the Effect of Damage Progression Model Choice on Prognostics Performance

The success of model-based approaches to systems health management depends largely on the quality of the underlying models. In model-based prognostics, it is especially the quality of the damage progression models, i.e., the models describing how damage evolves as the system operates, that determines the accuracy and precision of remaining useful life predictions. Several common forms of these models are generally assumed in the literature, but are often not supported by physical evidence or physics-based analysis. In this paper, using a centrifugal pump as a case study, we develop different damage progression models. In simulation, we investigate how model changes influence prognostics performance. Results demonstrate that, in some cases, simple damage progression models are sufficient. But, in general, the results show a clear need for damage progression models that are accurate over long time horizons under varied loading conditions.

Daigle, Matthew

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy

Progressive Damage Modeling of Notched Composites

There is an increased interest in using non-crimp fabric reinforced composites for primary and secondary structural weight savings in high performance automobile applications. However, one of the main challenges in implementing these composites is the lack of understanding of damage progression under a wide variety of loading conditions for general configurations. Towards that end, researchers at GM and NASA are developing new damage models to predict accurately the progressive failure of these composites. In this investigation, the developed progressive failure analysis model was applied to study damage progression in center-notched and open-hole tension specimens for various laminate schemes. The results of a detailed study with respect to the effect of element size on the analysis outcome are presented.

Aitharaju, Venkat

Climate Reanalysis: Progress and Future Prospects

Reanalysis is the process whereby an unchanging data assimilation system is used to provide a consistent reprocessing of observations, typically spanning an extended segment of the historical data record. The process relies on an underlying model to combine often-disparate observations in a physically consistent manner, enabling production of gridded data sets for a broad range of applications including the study of historical weather events, preparation of climatologies, business sector development and, more recently, climate monitoring. Over the last few decades, several generations of reanalyses of the global atmosphere have been produced by various operational and research centers, focusing more or less on the period of regular conventional and satellite observations beginning in the mid to late twentieth century. There have also been successful efforts to extend atmospheric reanalyses back to the late nineteenth and early twentieth centuries, using mostly surface observations. Much progress has resulted from (and contributed to) advancements in numerical weather prediction, especially improved models and data assimilation techniques, increased computing capacity, the availability of new observation types and efforts to recover and improve the quality of historical ones. The recent extension of forecast systems that allow integrated modeling of meteorological, oceanic, land surface, and chemical variables provide the basic elements for coupled data assimilation. This has opened the door to the development of a new generation of coupled reanalyses of the Earth system, or integrated Earth system analyses (IESA). Evidence so far suggests that this approach can improve the analysis of currently uncoupled components of the Earth system, especially at their interface, and lead to increased predictability. However, extensive analysis coupling as envisioned for IESA, while progressing, still presents significant challenges. These include model biases that can be exacerbated when coupled, component systems with different physical characteristics and different spatial and temporal scales, and component observations in different media with different spatial and temporal frequencies and different latencies. Quantification of uncertainty in reanalyses is also a critical challenge and is important for expanding their utility as a tool for climate change assessment. This talk provides a brief overview of the progress of reanalysis development during recent decades, and describes remaining challenges in the progression toward coupled Earth system reanalyses.

IES

Benchmarking Mixed Mode Failure in Progressive Damage and Failure Analysis Methods

The verification and validation of progressive-damage-analysis finite element methods are difficult but critical tasks to undertake during their development. Verification exercises assess whether a predictive analysis tool produces results that are consistent with the fundamental concepts and assumptions of the tool under evaluation. Ideally, closed-form analytical solutions can be derived for which method verification results can be compared. Problems selected for computational tool verification are often simple and isolate individual features of the tool. In the case of progressive damage finite element methods, verifications should be performed to evaluate the ability of the model to predict the initiation of damage and its growth through the finite element mesh under a variety of conditions. Mabson et al. proposed a test case of a unidirectional, fiber-reinforced plate with a center crack subjected to tensile loads to evaluate matrix crack propagation predictions. The problem was modeled using the Abaqus Hashin continuum damage mechanics (CDM) model for fiber-reinforced composites. Different combinations of matrix strengths and element sizes were used in the simulations, and the results were compared to a closed-form solution based on linear elastic fracture mechanics (LEFM). It was determined that the Abaqus CDM model could predict the LEFM solution of Mode I cracks only when the finite element mesh density met specific requirements based on the material properties. This paper presents closed-form LEFM solutions for a center notch mixed mode (CNMM) verification problem. Parametric finite element analyses were developed using progressive damage analysis methods of both the Discrete Damage Mechanics (DDM) and CDM classes. The progressive damage analysis methods applied in the analyses of the CNMM problem include CompDam and the Floating Node Method. Analyses were conducted with various mode mixities and element sizes to verify that the damage models were working as intended and to identify any limits of applicability.

Leone, Frank

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins

Design and Hardware Progress on a Magnetically-Geared Actuator for Extremely Cold Lunar Environments

Introduction: Under the Motors for Dusty and Extremely Cold Environments (MDECE) Project, NASA Glenn Research Center is developing a magnetically-geared actuator for extremely cold space environments to avoid the wiring and significant efficiency penalty associated with heating grease-lubricated actuators as well as the stringent life and loading constraints imposed by dry film lubricated mechanical gears. The heating penalty can be equivalent to up to a 90% efficiency reduction in permanently shadowed regions on the Moon. This poster or presentation will summarize the progress made over the past 6-12 months on designing the fully-functional actuator and building a proof-of-concept actuator and testing it in an ambient environment. Design Progress: A critical design review was successfully completed at the end of June 2023. This presentation will touch on the key highlights from that review in the areas of electro-magnetic design and optimization, bearing optimization, thermal analysis, structural analysis, and mechanical design and manufacturing. The predicted technical performance measures of the actuator will be mentioned. The team is currently finishing some actions from the review and finalizing the drawing package in preparation for hardware procurement. Hardware Progress: Despite some significant delays in receiving fabricated parts and magnetic subassemblies, progress was made in manufacturing and assembling a proof-of-concept version of both the actuator’s magnetically-geared motor (Fig. 1) and the actuator’s cycloidal-type output magnetic gear stage (Fig. 2) [3]. The presentation will mention key lessons learned to date from the fabrication, assembly, and testing of the proof of concept.

Lunar surface

Semantic Segmentation of High-Resolution Satellite Imagery using Generative Adversarial Networks with Progressive Growing

With increase in urbanization and Earth Sciences research into urban areas, the need to quickly and accurately segment urban rooftop maps has never been greater. Cur-rent machine learning techniques struggle to produce high accuracy maps in dense urban zones where there is high image noise and foot print overlap. In this paper, we evaluate a training methodology for pixel-wise segmentation for high resolution satellite imagery using progressive growing of generative adversarial networks as a solution. We apply our model to segmenting building rooftops and compare these results to conventional methods for rooftop segmentation. We evaluate our approach using the SpaceNet version 2 and xView datasets. Our experiments show that for SpaceNet, progressive Generative Adversarial Network (GAN) training achieved a test accuracy of 93% compared to 89% for traditional GAN training and 87% for U-Net architecture, while for xView, we achieved 71% accuracy using progressive GAN training compared to 69% through traditional GAN training and 65% using U-Net.

Semantic