Manpower and project planning

The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

Johnson, David W.↗

Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.

Poeschel, R. L.↗

Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

Hawthorne, E. I.↗

The personal computer and GP-B management

The Gravity Probe-B (GP-B) experiment is one of the most sophisticated and challenging developments to be undertaken by NASA. Its objective is to measure the relativistic drift of gyroscopes in orbit about the earth. In this paper, the experiment is described, and the strategy of phased procurements for accomplishing the engineering development of the hardware is discussed. The microcomputer is a very convenient and powerful tool in the management of GP-B. It is used in creating and monitoring such project data as schedules, budgets, hardware procurements and technical and interface requirements. Commercially available software in word processing, database management, communications, spreadsheet, graphics and program management are used. Examples are described of the efficacy of the application of the computer by the management team.

Neighbors, A. K.↗

Project FIRES - Firefighters Integrated Response Equipment System. Volume 3: Protective Ensemble Design and Procurement Specification, Phase 1B

Each of the subsystems comprising the protective ensemble for firefighters is described. These include: (1) the garment system which includes turnout gear, helmets, faceshields, coats, pants, gloves, and boots; (2) the self-contained breathing system; (3) the lighting system; and (4) the communication system. The design selection rationale is discussed and the drawings used to fabricate the prototype ensemble are provided. The specifications presented were developed using the requirements and test method of the protective ensemble standard. Approximate retail prices are listed.

Abeles, F. J.↗

An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem

New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

Schlagheck, R. A.↗

An Overview of Follow-On Testing Activities of the A-3 Subscale Diffuser Test Project

An overview of NASA Stennis Space Center's (SSC) A-3 Subscale Diffuser Test (SDT) Project is presented. The original scope of the SDT Project, conducted from April 2007 to January 2008, collected data to support mitigation of risk associated with design and procurement activities of the A-3 Test Stand Project, an effort to construct a simulated altitude test facility at SSC in support of NASA's Constellation Program. Follow-on tests were conducted from May 2008 through August 2009, utilizing the SDT test setup as a testbed for additional risk mitigation activities. Included are descriptions of the Subscale Diffuser (SD) test article, the test facility configuration, and test approaches.

Ryan, James E.↗

DSN Aperture Enhancement Project Office

All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

DSN Aperture Enhancement Project (DAEP)↗

Evaluation program for secondary spacecraft cells: Initial evaluation tests of General Electric Company 12.0 ampere-hour nickel-cadmium spacecraft cells for the international ultraviolet explorer

An evaluation test program was conducted to insure that all cells put into the life cycle program are of high quality by the screening of cells found to have electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open-circuit voltage above 1.150 volts during the internal short test. The 20 cells were manufactured for the National Aeronautics and Space Administration, Goddard Space Flight Center (GSFC). The cells are from a lot of 175 cells procured for the International Ultraviolet Explorer project. Due to a change in requirements, the project selected to use 6.0 ampere-hour cells. Therefore, the remaining cells of this lot have been placed in storage at GSFC for use on a future GSFC project. All the cells are rated at 12.0 ampere-hours and contain double ceramic seals. Test limits specify those values in which a cell is to be terminated from a particular charge or discharge. Requirements are referred to as normally expected values based on past performance of aerospace nickel cadmium cells with demonstrated life characteristics.

Harkness, J. D.↗

Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

Gonzalez, Guillermo A.↗

Commercial Crew Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned

To support annual PPBE budgets and NASA HQ requests for cost information for commercial crew transportation to the International Space Station (ISS), the NASA ISS ACES team developed system development and per flight cost estimates for the potential providers for each annual PPBE submit from 2009-2014. This paper describes the cost estimating processes used, challenges and lessons learned to develop estimates for this key NASA project that diverted from the traditional procurement approach and used a new way of doing business

Battle, Rick↗

Reliable Ignition of LOX-LCH4 Propellants

No cryogenic Reaction Control System (RCS) has ever flown in space. Cryogenic propellants are baselined by HLS and CLPS partners and are the key use case for future ISRU manufactured propellants. A reliable LOX/LCH 4 RCS is an enabling technology for human Lunar and Mars exploration. In previous thermal vacuum (<275 F, <10 torr) testing at NASA GRC Plum Brook, the team uncovered anomalous LOX/LCH4 engine ignition phenomena where flame kernels quenched at these ultra cold hardware temperatures, leading to many pulses where the engines would not light. In 2022, the project was able to recreate the no light condition with an upgraded Frost-Mint test stand at JSC. This project implemented test stand improvements and procured propellants and follow on engine components for a hot fire campaign beginning in November 2024 which will attempt to ignite the RCS engine at ultra cold vacuum conditions by modifying the engine mixture ratio. New modeling techniques were implemented to account for past no lights and are an enabling method to make lunar surface go no go predictions based on hardware conditions. This was enabled by significant improvements to the Frost Mint system, which reduced moisture build up and leaks, increased propellant availability, leading to more attempts at thermal vacuum hot-fires.

Propulsion↗

A study of microstructural characteristics of Ni-based superalloys at high temperatures

The microstructural characteristics of the Ni-based superalloy MAR-M246(Hf) which is used in manufacturing the components of the Space Shuttle's main engine have been studied. These superalloys need optimal heat treatment to get the best results. To find the optimum heat treatment the technique of differential thermal analysis and the optical photomicrographs are being planned to be utilized. In the first phase, the existing experimental equipment like cutting, grinding/polishing machines and metallurgical microscope have been set up to cut/polish and take the photomicrographs. In the beginning of this year an order was placed for the Leitz Mettalux-3 microscope with a hot stage for in-situ observation of the superalloy samples. The hot stage was tested for the first time, alloying the thermocouple with the Tantulum heating element and has not been installed finally by the supplier. A Perkin Elmer Differential Thermal Analyzer (DTA 1700) was procured in the first year of the project. Samples of MAR-M246(Hf), MAR-M247, Waspaloy, Udimet-41, CMSX-2 and CMSX-3 (polycrystalline and single crystals) have been studied using differential thermal analyzer.

Lal, R. B.↗

A Low Cost, Self-Acting, Liquid Hydrogen Boil-Off Recovery System

PROJECT SUMMARY. 1 PROJECT OBJECTIVES. Detail Design. Final Analysis. Hardware Procurement. Component Tests. System Tests..Prototype Tests. 2. WORK PERFORMED. Detail Design. Final Analysis. Hardware Procurement. Component Tests. System Tests. Prototype Tests. 3. Results obtained. Detail Design. Final Analysis. Hardware Procurement. Component Tests. System Tests. Prototype Tests. 5. TECHNICAL MERIT AND FEASIBILITY ASSESSMENT. 6. APPENDIX A: SIZE DETAIL DRAWINGS. 7. APPENDIX B: CONSULTANTS SENSITIVITY STUDY. 8. APPENDIX C: CONSULTANTS REPORT. ROTORDYNAMIC ANALYSIS 9. SF298 REPORT DOCUMENTATION PAGE.

Pelfrey, Joy w.↗

Earth Science Capability Demonstration Project

A viewgraph presentation reviewing the Earth Science Capability Demonstration Project is shown. The contents include: 1) ESCD Project; 2) Available Flight Assets; 3) Ikhana Procurement; 4) GCS Layout; 5) Baseline Predator B Architecture; 6) Ikhana Architecture; 7) UAV Capability Assessment; 8) The Big Picture; 9) NASA/NOAA UAV Demo (5/05 to 9/05); 10) NASA/USFS Western States Fire Mission (8/06); and 11) Suborbital Telepresence.

Cobleigh, Brent↗

Techport Input for Propulsive Descent Technologies (PDT) Project

The PDT project will investigate the use of retro propulsion during the supersonic phase of atmospheric entry for Mars missions. The project technical approach involves a combination of procurement and evaluation of commercially provided flight data, development of candidate vehicle configurations, and engineering calibration of computational fluid dynamics models to the available flight data.

Campbell, Charles H.↗

Evaluation of Commercial-Off-The-Shelf (COTS) Electronics for Extreme Cold Environments

Deep space and Icy Moon missions (Titan, Enceladus, Ceres, Europa, & Ganymede) will need qualified extreme environment capable components for electronic systems located in extremities of their rovers and spacecraft. Commercial off the shelf (COTS) components would be advantageous to use for some aspects of such projects, given that they are easier to procure and offer a broad range of functionalities. Furthermore, theoretical and experimental data suggest that many COTS parts are capable of operation, and not just storage, at temperatures well beyond the manufacturer specified temperature limits. To help address the challenges presented at near cryogenic temperatures, a COTS selection knowledge base is being developed to estimate the performance of COTS components within cold environments. The knowledge base captures queries from a range of information sources such as cold functionality test results for part types and families, theoretical and experimental literature reviews and key findings are summarized here. In addition, a selection of components are planned to be examined for their performance to near cryogenic temperatures to generate a methodology for identification and verification of the COTS candidates. As the qualification of COTS parts for extreme environments can be very costly, this knowledge base can serve to reduce qualification time and cost by pre-selecting and limiting candidates.

Mojarradi, Mohammad↗