Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Prototype SSR2 Tuner Procurement and Testing at IJCLab for PIP-II Project

IJCLab is involved in the PIP-II project on the design and development of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. Five prototype tuners have been built and are being tested at IJCLab. After a short description of the tuner, this paper reports on the procurement strategy and the performance observed at both room and low temperatures in vertical cryostat test with SSR2 prototype cavities. This paper will also share results on accelerated lifetime tests performed in a dedicated nitrogen-cooled cryostat.

43 PARTICLE ACCELERATORS↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

Beamline for E-beam processing at UITF

Electron beam irradiation is a method that has shown a good potential to reduce several pollutants in wastewater. One of the main challenges towards wider adoption of this method is the need for compact, reliable, cost-effective, high-power accelerators. Jefferson Lab is working on the design and prototyping of accelerator components, based on superconducting radio-frequency (SRF) technology, aiming at accelerators for industrial applications. The LDRD project aimed at designing, procuring, installing, and commissioning a beamline at the Upgraded Injector Test Facility (UITF) accelerator to allow electron-beam irradiation studies of different materials, beginning with wastewater. The availability of such beamline allows exploring the ability of electron-beam radiation to reduce or eliminate so-called “forever chemicals” that can be found in wastewater or industrial sites. After successful commissioning, the beamline was used to irradiate wastewater samples with different concentrations of 1,4-dioxane, in collaboration with Hampton Roads Sanitation District (HRSD).

42 ENGINEERING↗

Offshore Wind Turbine Blade (85 to120meters ultra-long blade) static and fatigue test

Offshore blades are not just longer, they are wider, heavier and more flexible. These longer blades are a key component of larger wind turbines and for turbines to be more efficient in low wind speeds. These longer blades help reduce the LCOE further and make offshore wind even more competitive. As described earlier, it is essential for the blades to be fully tested to verify and validate the blade designs and manufacturing processes to ensure a reliable product is installed in the field. Through this project WTTC developed and procured new testing equipment required to test longer blades with larger deflections and higher loads. R&D’s BCDA system commissioned was the largest fatigue test exciter system in the world and set the bar for other blade testing facilities worldwide.

17 WIND ENERGY↗

Leveraging Energy Sales Agreements (ESA) Under ESPC ENABLE and DOE's IDIQ Contract

There is an increasing interest in solar photovoltaics, battery energy storage systems, and geothermal heat pumps to help meet decarbonization and resilience goals. However, facility managers may not know that energy sales agreement (ESA) contracting can be an effective, efficient, and lower cost way to procure and install these projects. FEMP, national labs, and agency partners will discuss best practices and examples that attendees may be able to leverage at their own sites.

DOE FEMP↗

Solar Design/Install Labor Quantification (Cooperative Research and Development Final Report)

The goals of this project were to quantify the rate and/or total expected labor expenditure of engineers designing solar arrays and electricians installing solar across a spectrum of project sizes and configurations. Specifically, procuring and analyzing labor data from solar engineering firms relating to the amount of time it takes an engineer to design a solar project, the amount of time it takes an engineer to perform a wiring or stringing design, the amount of time it takes an electrician to install a solar project and the amount of time it takes electricians to install the strings of a solar array. Then these details could be analyzed to evaluate labor intensity for solar design/installation. These goals were unable to be completed because the participant was unable to collect the necessary data for analysis.

14 SOLAR ENERGY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Procurement Options for Low Temperature Geothermal Technologies at Federal Facilities

Federal agencies are moving towards more efficient and resilient facilities by increasingly implementing energy projects in an effort to meet federally mandated goals, agency needs, and administration priorities. Low temperature geothermal technologies, which include geothermal heat pumps (GHP) and district heating systems, can contribute to meeting these goals. These technologies provide facilities with heating and cooling while reducing facility energy use and improving resilience. However, in order to implement these solutions, federal facilities must identify and execute a strategy for the procurement of these technologies. Federal facilities have successfully completed energy efficiency projects using a variety of procurement options. The purpose of this document is to provide federal agencies with a comprehensive overview of the procurement options available for low temperature geothermal technologies and other energy efficiency projects. The procurement options discussed include third-party financing mechanisms such as energy saving performance contracts (ESPCs), ESPC energy sales agreements (ESPC ESAs), and utility energy service contracts (UESCs), as well as dedicated funds in the form of federal grants and appropriated funds.

15 GEOTHERMAL ENERGY↗

Hydrogen Production Cost with Anion Exchange Membrane Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Anion Exchange Membrane (AEM) electrolysis. Projected high-volume, untaxed and unsubsidized levelized cost of hydrogen (LCOH)1 range from 2020 $\$$1.78 to $\$$3.68/kg H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$$0.03/kWh and a capacity factor of 97%. The total installed capital cost for an AEM electrolysis plant was estimated from bottom-up stack and process plant cost models. The stack cost model accounts for manufacturing equipment, equipment maintenance, material, tooling, cycle time, yield, labor, utilities and general overhead. The process plant cost model accounts for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the AEM electrolysis plant is assumed to be a stick-built, greenfield project developed by an engineering, procurement, and construction (EPC) firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H2A) production model, a peer-reviewed national laboratory-developed discounted cash flow (DCF) model, were used to calculate the production LCOH in 2020 $\$$/kg H 2 . The baseline electricity price case ($\$$0.03/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study

In early 2020, COVID-19 swept across the world. The accelerator industry, like many others, was impacted by disease, delays, shortages, and new working conditions. All Thomas Jefferson National Accelerator Facility (JLab) employees were sent home in mid-March 2020, with many still working remotely now. At the time, JLab was working on the Proton Power Upgrade (PPU) to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). Procurements had been placed and were being managed, parts were being received and inspected. This paper details the JLab procurement plan for the SNS PPU project, and the mitigations that were developed to continue to support this project smoothly under the limitations imposed by COVID-19.

Wilson, K. M.↗

DOE’s National Solar Thermal Test Facility Operations and Maintenance

This report details operations and maintenance (O&M) activities performed across Fiscal Years 2022 through 2024 in support of the continued capabilities of the National Solar Thermal Testing Facility (NSTTF) at Sandia National Laboratories. The NSTTF O&M project is funded by the U.S. Department of Energy Solar Energy Technologies Office (SETO) to support research activities and testing on behalf of external customers at the facility under award number CPS 38491. During the project period, the NSTTF made progress in the areas of site metrics, site maintenance and utilization tracking, and customer engagement. The O&M project also supported special initiatives including procurement of a heat exchanger for particle concentrating solar thermal processes and a scoping and cost study for refurbishment and repair of component in the NSTTF heliostat field.

14 SOLAR ENERGY↗

Helium recovery system at IB3A

The growing demand for sustainable cryogenic operations at Fermilab has underscored the need to improve helium management, particularly at the Industrial Building 3A (IB3A) test facility. IB3A characterizes and tests superconductors, cables, and coils for projects such as the HL-LHC AUP and Mu2e, yet currently relies on 500 L Dewars whose boil-off is vented to atmosphere, wasting a critical, non-renewable resource and increasing the cost of testing. A project is therefore under way to link IB3A to an existing purification and liquefaction station in a neighboring building through a dedicated pipeline. Captured helium will be transferred, purified, reliquefied, and returned for reuse, cutting losses and operating costs. This paper details the first two project phases: "Design and Engineering" and "Procurement and Installation." The design phase finalizes pipeline specifications, establishes flow-control requirements, and resolves integration challenges with existing cryogenic infrastructure. The procurement and installation phase covers material sourcing, pipeline construction, and deployment of control and monitoring systems to assure reliable, efficient operation. Key technical hurdles-route optimization, pressure drop mitigation, and interface compatibility-are discussed alongside implemented solutions. Implementing the pipeline and upgrading IB3A will dramatically reduce helium consumption and therefore testing cost, strengthening Fermilab's capacity to support frontier science far into the future.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Application of FREMES to Characterize and Sort Soil During Site Remediation - 20182

During decommissioning of buildings and the related release of nuclear sites, large amounts of bulk materials such as soil must be measured for clearance. These measurements are required to demonstrate that for example potentially contaminated soil is below the respective radiological limits. Doing so also helps to minimize the amount of bulk material which has to be disposed of as nuclear waste. NUKEM Technologies Engineering Services GmbH (NUKEM) applies their FREMES technology in a project at the former fuel element factory of FBFC International at Dessel, Belgium. The purpose is to measure and check for potential contamination within the excavated soil. The project started in 2017 with design and procurement of the necessary equipment. In October 2017 the FREMES system was installed at the site. After installation and an extensive test program the FREMES facility went fully into operation in July 2018. Original foreseen to measure between 4.000 and 8.000 tons of material, it has currently (mid 2019) measured 23.600 tons. It is expected that another 5.000 tons still have to be measured before the project successfully ends. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗