Search NASA⌕ Search

SEARCH · Search NASA

Results for “qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A review of neutronics and thermal hydraulics–based screening methods applied to accelerated nuclear fuel qualification

This paper reviews the state-of-the-art engineering approach for using thermal hydraulic (TH) and neutronics modeling and simulation (M&S) tools to perform rapid screening studies of novel nuclear fuel concepts within the context of accelerated fuel qualification. Global research efforts have introduced nuclear fuel and material concepts that mark a significant departure from traditional reactor materials. The number of new technologies being considered for development for light water reactors and advanced reactor types has created the need for an accelerated fuel qualification procedure. A key component of this procedure is the rapid identification of the most promising fuel concepts using computational screening studies. Advanced TH and neutronic M&S tools should be leveraged to efficiently determine whether the reactor performance and safety characteristics of a given concept warrant additional studies or whether the concept requires modification or elimination. This paper reviews best practices for performing these TH and neutronics screening studies at various stages during a fuel concept's progression through the qualification procedure. The motivation behind standardizing this approach is to minimize time and resources spent on qualification activities for fuel concepts that could be quickly refined or eliminated from consideration based on their reactor physics and TH characteristics. Adoption of this screening procedure—which focuses primarily on nuclear fuels but may be applicable to other reactor materials—will also help accelerate new material qualification by generating boundary conditions crucial to fuel performance evaluations and highlighting needed areas of separate effects experimentation. This article reviews the motivation behind the introduction of novel nuclear fuel concepts, provides incentive for utilizing TH- and neutronics-based screening studies, describes the screening approach and methodology, and includes discussion on how to interpret screening results to provide recommendations for the continued development of a given concept.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Open-Source RTOS Space Qualification: An RTEMS Case Study

NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

Real-time operating system↗

Development and Qualification of the Primary Structure of the Orion European Service Module

This paper presents an overview of the development and qualification test campaign for the primary structure of the European Service Module of ORION, the NASA spacecraft which will serve the future human exploration missions to the Moon, Mars and beyond. Under an agreement between NASA and ESA, the ORION will be powered by a European Service Module (ESM), providing also water and oxygen for astronauts' life sustainability. The development and qualification of the European Service Module (ESM) is under ESA responsibility with Airbus Defense and Space as the prime contractor. Thales Alenia Space Italia is responsible for design development, manufacturing, assembly and qualification of the Structure subsystem. The European Service Module, installed onto the launch adapter, shall support the crew module with its adapter and a launch abort system. It shall sustain: - A combination of global and local launch loads during lift off and ascent phases, - On orbit loads induced by engine firing for orbital transfers and attitude control. The ESM structure is based on a core made of Composite Fiber Reinforced Polymer (CFRP) sandwich panels complemented by aluminum alloy platforms, longerons and secondary structures. A development campaign has been implemented in order to define and validate composite parts' strength allowable values for design: coupon tests at material level, test at component level up to breadboards tests performed on main structural components (composite to metallic joints, and at panels' discontinuities). An incremental approach as defined in [1] has been followed. A qualification static test campaign at primary structure assembly level has been implemented in order to validate the design against static stiffness and ultimate strength as well as to correlate the structural Finite Element Model (FEM) used for sizing and confirm the margins of safety. The tests have been performed successfully by Thales Alenia Space Italia (TAS-I) on two flight representative structural models (STA1, STA2), in Turin facilities (Italy) between August 2015 and March 2017, with engineering support of technical representatives from Airbus, ESA, NASA and LMCO. The main development and qualification test activities and associated results are presented and discussed in the paper

Structural Testing↗

Liquid Fuel Qualification for Molten Salt Reactors: Identification of Gaps and Challenges

This report identifies and describes challenges in implementing the MSR fuel qualification process described in NUREG/CR-7299 Fuel Qualification for Molten Salt Reactors. This report provides additional information including examples and additional use case descriptions to assist applicants in understanding the content and structure of the information necessary to develop a fuel qualification report. In particular, the current report emphasizes the relationship of fuel salt qualification to the contents of the plant safety analysis report. This report is limited to the safety functions relevant to the reactor aspects of the nuclear power plant. MSRs that include significant fuel salt processing would also need to address the safety aspects of the processing facility. No significant gaps were found in NUREG/CR-7299. However, NUREG/CR-7299 focuses on generic descriptions of how the fuel salt supports achievement of plant fundamental safety functions. A fuel salt qualification report will need explicitly address the role of the fuel salt in meeting regulatory requirements for a particular plant. NUREG/CR-7299 also provides a regulatory mapping between NRC rules and the safety functions. However, by remaining at a fundamental level, NUREG/CR-7299 does not address plant specific safety analysis. Some aspects of the safety analysis may require additional emphasis for designs that incorporate particular features (such as additional confirmation of decay heat rejection performance for higher power reactors). This report provides additional structure to enable an applicant to develop their plant-specific safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MSR Fuel Salt Qualification Methodology

This report documents the continuing activities at Oak Ridge National Laboratory (ORNL) in support of the US Nuclear Regulatory Commission (NRC) efforts to develop an efficient, appropriate process for liquid fuel salt system qualification. Fuel qualification for salt-cooled molten salt reactors (MSRs) is part of the ongoing coated particle fuel qualification effort. Fuel qualification is a process which provides high confidence that physical and chemical behavior of fuel is sufficiently understood so that it can be adequately modeled for both normal and accident conditions, reflecting the role of the fuel design in the overall safety of the facility. Uncertainties are defined so that calculated fission product releases include the appropriate margins to ensure conservative calculation of radiological dose consequences. The initial phase of ORNL’s activities is documented in ORNL/LTR-2018/1045 Molten Salt Reactor Fuel Qualification Considerations and Challenges.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASME Code Qualification Plan for LPBF 316 SS

This report describes a plan to qualify laser powder bed fusion (LPBF) 316 stainless steel for use with the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Section III, Division 5 rules for metallic components in high temperature nuclear reactors. Accomplishing this goal would make the material and manufacturing process available to vendors for inclusion in the next generation of advanced, high temperature reactors. The general approach adopted here is to treat LPBF 316 as if it was a completely new material and to develop a plan to qualify the material according to the current ASME practices. One key goal of this work is to explore and develop accelerated qualification approaches that might reduce the time required to qualify new materials by reducing the need for long term testing. However, the qualification plan here does not employ any accelerated qualification approaches to provide a limiting, bounding description of the number, duration, and types of testing required to qualify LPBF 316 without such techniques and to describe a comprehensive dataset that could be used to explore and validate accelerated qualification approaches in the future. The report addresses the fundamental challenges to qualifying Advanced Manufacturing (AM) materials for high temperature applications and summarizes the ASME Section III qualification process as well as current efforts to qualify LBPF and DED 316 for low temperature applications. The report then discusses specific issues, both material and logistical, related to qualifying PBF 316 steel. The final chapters of the report describe a complete test plan designed to generate sufficient data to qualify the material as well as a data management plan for how to store and manage the data to eventually provide the test data packaged needed to qualify the material with ASME.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

RL10A-3-3B high mixture ratio qualification program

The results of the high mixture ratio qualification testing of the RL10 engine for the Shuttle/Centaur program are presented. The objective of the engine qualification test was to demonstrate the suitability of the RL10A-3-3B engine for space vehicle flight by subjecting it to the testing specified in RL10A-3-3B Model Specification Number 2295 dated February 1986. The applicable section of the specification is presented. Due to payload volume advantages which can be achieved by increasing the operating mixture ratio of the RL10, a decision was made to qualify the engine to run at a higher mixture ratio. A program was created to qualify the RL10 engine for operation at 15,000 pounds thrust and a nominal 6.0 to 1 mixture ratio. This model of the engine was designated the RL10A-3-3B. The qualification program included three test series as follows: (1) hardware durability and limits test in which the engine completed 23 firings and 4605.7 seconds with 1588.7 seconds at less than 6.6 mixture ratio; (2) preliminary qualification test in which the engine completed 26 firings and 5750 seconds; and (3) qualification test in which the engine completed 26 hot firings and 5693.4 seconds with 905.9 seconds at 6.7 mixture ratio. Several changes in engine hardware were required for operation of the RL10A-3-3B engine in the Space Shuttle which include a duel pressure switch ignition, an oxidizer flow control, and helium plumbing changes.

Vogel, T.↗

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

Unintended Consequences: How Qualification Constrains Innovation

The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

Brice, Craig A.↗

Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

Ramesham, Rajeshuni↗

Qualification of UHF Antenna for Extreme Martian Thermal Environments

The purpose of this development was to validate the use of the external Rover Ultra High Frequency (RUHF) antenna for space under extreme thermal environments to be encountered during the surface operations of the Mars Science Laboratory (MSL) mission. The antenna must survive all ground operations plus the nominal 670 Martian sol mission that includes summer and winter seasons of the Mars thermal environment.The qualification effort was to verify that the RUHF antenna design and its bonding and packaging processes are adequate to survive the harsh environmental conditions. The RUHF is a quadrifilar helix antenna mounted on the MSL Curiosity rover deck. The main components of the RUHF antenna are the helix structure, feed cables, and hybrid coupler, and the high-power termination load. In the case of MSL rover externally mounted hardware, not only are the expected thermal cycle depths severe, but there are temperature offsets between the Mars summer and winter seasons. The total number of temperature cycles needed to be split into two regimes of summer cycles and winter cycles. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed prior to the start of the qualification test. Functional RF tests were performed intermittently during chamber breaks over the course of the qualification test. For the RF return loss measurements, the antenna was tested in a controlled environment outside the thermal chamber with a vector network analyzer that was calibrated over the antenna s operational frequency range. A total of 2,010 thermal cycles were performed. Visual inspection showed a dulling of the solder material. This change will not affect the performance of the antenna. No other changes were observed. RF tests were performed on the RUHF helix antenna, hybrid, and load after the 2,010 qualification cycles test. The RF performance of the RUHF antenna, hybrid, and load were almost identical before and after the complete test. Therefore, the developed design of RUHF is qualified for a long-duration MSL mission. The RUHF antenna has not been used for long-duration missions such as MSL in the past. The state-of-the-art technology of the RUHF antenna is used to develop the antennas for MSL mission survivability. This developmental test data provides the confidence in using this RUHF antenna for future NASA missions to Mars.

Ramesham, Rajeshuni↗

Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System

In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale supersonic wind tunnel testing of a rigid DGB parachute with entry-vehicle to validate two high fidelity computational fluid dynamics (CFD) tools. The computer codes utilized Large Eddy Simulation and Detached Eddy Simulation numerical approaches to accurately capture the turbulent wake of the entry vehicle and its coupling to the parachute bow-shock. The second phase was the development of fluid structure interaction (FSI) computational tools to predict parachute response to the supersonic flow field. The FSI development included the integration of the CFD from the first phase with a finite element structural model of the parachute membrane and cable elements. In this phase, a 4% of full-scale supersonic flexible parachute test program was conducted to provide validation data to the FSI code and an empirical dataset of the MSL parachute in a flight-like environment. The final phase is FSI simulations of the full-scale MSL parachute in a Mars type deployment. Findings from this program will be presented in terms of code development and validation, empirical findings from the supersonic testing, and drag performance during supersonic operation.

EDL↗

Mechanistic Multiscale Uncertainty Propagation in Support of Accelerated Fuel Qualification

Taking a nuclear fuel concept through the research, development, and qualification stages has historically taken on the order of 20 to 25 years because of extensive irradiation tests required for a variety of conditions. The concept of accelerated fuel qualification (AFQ) has been proposed to increase the innovation pace for nuclear fuels. The goal of AFQ is not to replace the traditional qualification approach but rather to reduce the total number of experiments required to ensure approval from the regulatory authority. Of the many AFQ approaches being explored, advanced modeling—and, in particular, mechanistic modeling—is in a uniquely cross-cutting position to reduce the number of required integral tests through the inclusion of separate-effects testing, while helping to extrapolate reactor performance during rare events. We make the case that propagation of uncertainty through various computational length scales helps contextualize mechanistic modeling. We will utilize UO 2 fission gas diffusion predictions from the atomistically informed cluster dynamics code Centipede to inform fuel performance rodlet simulations using the BISON finite element code as the metric for showing how multiscale mechanistic uncertainty quantification can help reduce uncertainty in fuel performance. In conclusion, by quantifying uncertainty and its reduction through multiscale modeling, the qualification process may be accelerated through the reduction of costly irradiation experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NMDQi Nuclear Materials Discovery and Qualification Initiative Conference Overview

The Nuclear Materials Discovery and Qualification Initiative (NMDQi) is designed to accelerate nuclear materials qualification to fulfill the promises of early and advanced reactor technologies as a safe, clean, and low-cost baseload energy. Materials development and qualification in the nuclear industry is by definition challenging due to stringent safety requirements, limited availability of specialized facilities for materials irradiation and testing, and the challenging high-temperature, high-radiation environment. NMDQi will establish tools and capabilities that will greatly accelerate the nuclear fuels and materials development process. These tools will provide both computationally informed insights and high-throughput infrastructure with the goal of completing qualification in a single pass. In this approach, materials must be fabricated with a range of properties of interest so that materials performance can be examined in parallel, rather than with multiple discrete specimens. Advanced manufacturing (AM) techniques, which can produce complex component geometries, microstructures, and compositions, are ideal. The improved process monitoring and control that AM can provide are ideal for ensuring and reducing material variability, which will be particularly important as standards committees pursue regulations for AM components. However, gaining these benefits requires overcoming the substantial barrier of qualifying AM processes and the resulting materials and components for supporting research campaigns and eventually nuclear service.

36 MATERIALS SCIENCE↗

U-10Mo Monolithic Fuel Qualification Plan

The Material Management and Minimization (M3) Program’s primary objective within the U.S. Department of Energy/National Nuclear Security Administration is to achieve permanent threat reduction by minimizing and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project, is pursuing a fuel qualification and licensing effort focused on converting high-performance research reactors in the United States from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. The body of this document is focused on defining the activities required for generic qualification of high density, LEU fuel that then allows reactor conversions to proceed for the four high-performance research reactors and the critical assembly that will operate using the U-10Mo monolithic fuel design (see Subsection 1.3): MITR, MURR, NBSR, ATR, and ATRC. Fuel qualification in this report means generic fuel acceptance of the U-10Mo monolithic fuel form by the NRC for use in reactor conversions in the United States, which allows the fuel to be used in subsequent reactor specific licensing requests. The U 10Mo Monolithic Fuel Research, Development, and Qualification Plan utilizes the functions and requirements of the USHPRR Project that was established in the Functions and Requirements Document (F&RD) [1] and expands on these requirements to ensure that planned tests have traceable results that will ensure the requirement has been met. The methods by which data will be collected to show that these requirements have been met are described in this document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗