Search NASA⌕ Search

SEARCH · Search NASA

Results for “quality control inspector”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

23 records · Page 2

Low-Intrusion Techniques and Sensitive Information Management for Warhead Counting and Verification: FY2011 Annual Report

Future arms control treaties may push nuclear weapons limits to unprecedented low levels and may entail precise counting of warheads as well as distinguishing between strategic and tactical nuclear weapons. Such advances will require assessment of form and function to confidently verify the presence or absence of nuclear warheads and/or their components. Imaging with penetrating radiation can provide such an assessment and could thus play a unique role in inspection scenarios. Yet many imaging capabilities have been viewed as too intrusive from the perspective of revealing weapon design details, and the potential for the release of sensitive information poses challenges in verification settings. A widely held perception is that verification through radiography requires images of sufficient quality that an expert (e.g., a trained inspector or an image-matching algorithm) can verify the presence or absence of components of a device. The concept of information barriers (IBs) has been established to prevent access to relevant weapon-design information by inspectors (or algorithms), and has, to date, limited the usefulness of radiographic inspection. The challenge of this project is to demonstrate that radiographic information can be used behind an IB to improve the capabilities of treaty-verification weapons-inspection systems.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assurance Technology Challenges of Advanced Space Systems

The initiative to explore space and extend a human presence across our solar system to revisit the moon and Mars post enormous technological challenges to the nation's space agency and aerospace industry. Key areas of technology development needs to enable the endeavor include advanced materials, structures and mechanisms; micro/nano sensors and detectors; power generation, storage and management; advanced thermal and cryogenic control; guidance, navigation and control; command and data handling; advanced propulsion; advanced communication; on-board processing; advanced information technology systems; modular and reconfigurable systems; precision formation flying; solar sails; distributed observing systems; space robotics; and etc. Quality assurance concerns such as functional performance, structural integrity, radiation tolerance, health monitoring, diagnosis, maintenance, calibration, and initialization can affect the performance of systems and subsystems. It is thus imperative to employ innovative nondestructive evaluation methodologies to ensure quality and integrity of advanced space systems. Advancements in integrated multi-functional sensor systems, autonomous inspection approaches, distributed embedded sensors, roaming inspectors, and shape adaptive sensors are sought. Concepts in computational models for signal processing and data interpretation to establish quantitative characterization and event determination are also of interest. Prospective evaluation technologies include ultrasonics, laser ultrasonics, optics and fiber optics, shearography, video optics and metrology, thermography, electromagnetics, acoustic emission, x-ray, data management, biomimetics, and nano-scale sensing approaches for structural health monitoring.

Chern, E. James↗

Audit Report on "The Department's Management of the ENERGY STAR Program"

The American Recovery and Reinvestment Act (Recovery Act) authorized about $300 million in consumer rebate incentives for purchases of products rated under the 'ENERGY STAR' Program. ENERGY STAR, a voluntary labeling program established in 1992, provides consumers with energy efficiency data for a range of products so that they can make informed purchase judgments. The overall goal of the program is to encourage consumers to choose energy efficient products, advancing the nationwide goal of reducing energy consumption. The U.S. Environmental Protection Agency (EPA) managed the ENERGY STAR Program on a stand-alone basis until 1996 when it joined forces with the Department of Energy (Department). A Memorandum of Cooperation expanded the ENERGY STAR product categories, giving the Department responsibility for overseeing eight product categories such as windows, dishwashers, clothes washers, and refrigerators, while EPA retained responsibility for electronic product categories and heating, ventilating, and cooling equipment. Each agency is responsible for setting product efficiency specifications for those items under its control and for ensuring the proper use of the ENERGY STAR label in the marketplace. In August 2007, the EPA Office of Inspector General issued an audit report identifying significant control weaknesses in EPA's management of ENERGY STAR. The Department, concerned by the findings at EPA and eager to improve its own program, developed an approach to verify adherence to product specifications, ensure proper use of the ENERGY STAR label in the marketplace, and improve the establishment of product specifications. As evidenced by the commitment of $300 million in Recovery Act funds, the ENERGY STAR Program plays an important role in the U.S. efforts to reduce energy consumption. We initiated this audit to determine whether the Department had implemented the actions it announced in 2007 to strengthen the Program. The Department had not implemented planned improvements in the ENERGY STAR Program. Our audit revealed that officials had not: (1) Developed a formal quality assurance program to help ensure that product specifications were adhered to; (2) Effectively monitored the use of the ENERGY STAR label to ensure that only qualifying products were labeled as compliant; and (3) Formalized procedures for establishing and revising product specifications and for documenting decisions regarding those specifications. In our judgment, the delay in the Department's planned improvements in its management of the ENERGY STAR Program could reduce consumer confidence in the integrity of the ENERGY STAR label. Such loss of credibility could reduce energy savings, increase consumer risk, and diminish the value of the recent infusion of $300 million for ENERGY STAR rebates under the Recovery Act.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sustainability of gamma-ray isotopics evaluation codes

In November 2005, the international workshop 'Gamma Evaluation Codes for Plutonium and Uranium Isotope Abundance Measurements by High-Resolution Gamma Spectrometry: Current Status and Future Challenges' was held in Karlsruhe, Germany. Some of the main issues discussed during the November 2005 meeting were related to concerns voiced by international inspectorate authorities such as the International Atomic Energy Agency (IAEA), the European Atomic Energy Community (EURATOM), and the Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials (ABACC) about the standardization and sustainability of gamma-ray isotopic analysis codes that are commonly used during safeguards inspections. A follow-up international workshop was conducted in Oak Ridge, TN in 2008. This workshop was in response to needs expressed by the international safeguards community during the Karlsruhe meeting and recommendations made under Action Sheet 14; a cooperative effort between the U. S. Department of Energy and ABACC. The purpose of the Oak Ridge workshop was to bring code developers and end users together to better understand the capabilities and limitations of the codes; to discuss mechanisms to ensure these codes are sustained and quality tested; and to ensure updates or revisions are performed in a controlled manner. During an Action Sheet 14 meeting held in Rio de Janeiro, Brazil in which the IAEA and EURATOM participated as observers, and in subsequent meetings of the European Safeguards Research and Development Association (ESARDA), all parties agreed that the regional working group initially established under the DOE/ABACC cooperation should be expanded to an international working group. The purpose of the international working group is to provide a forum to exchange information, discuss technical developments, and validate and test the various codes. However, progress to formally establish the working has been slowed by a lack of dedicated funding and competing priorities within the various international organizations. Recently, the ESARDA Nondestructive Assay Working Group established a dedicated website for the International Working Group on Gamma Spectrometry Techniques (1 WG-GST). In this paper, we will explore specific steps that should be taken to strengthen this working group's ability to affect development of a common testing platform and address concerns regarding applicability, sustainability and version control for these important codes.

99 GENERAL AND MISCELLANEOUS↗