Search NASA⌕ Search

SEARCH · Search NASA

Results for “reductive loop exchanges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

24 records · Page 2

Shallow Geothermal Resources for Cooling Applications at the University of Hawai‘i

Scientists at Berkeley Lab have teamed up with The University of Hawai‘i at Manoa (UH Manoa) through the U.S. Department of Energy’s (DOE’s) Energy Transitions Initiative Partnership Project (ETIPP) to evaluate the technological and market feasibility of shallow geothermal heat exchanger (GHE) technology for building cooling, energy efficiency, and emissions reduction applications in Hawai’i. The team is assessing the data necessary to model the feasibility of deploying this technology, the actual models that will be used, and what hurdles need to be overcome to install a demonstration case. UH has an abundance of geologic and geothermal data and is looking to the national labs’ expertise to execute this analysis. UH is also interested in investigating policy, regulatory, and business conditions advantageous for implementation of a pilot project, and more broad deployment of this technology in Hawai‘i. In many locations around the world, the demands for heating and cooling are roughly balanced over the course of the year, so GHEs do not cause significant long-term changes in subsurface temperature. This is not the case in Hawai’i, where the demand for heating is very small, meaning that over time, GHEs will add heat to the subsurface. If temperatures increase significantly, GHE systems will not work as designed. Regional groundwater flow has the potential to sweep heated water away from boreholes, thereby maintaining the functionality of the GHE system. Significant regional groundwater flow requires two things: a sufficiently large driving hydraulic head gradient (usually closely related to surface topography), and sufficient porosity and permeability to enable groundwater to flow in large enough quantities to enable near-borehole temperatures to be maintained at ambient values. Hawai‘i’s volcanic terrain offers ample surface topographic variation. The lava itself shows an extremely large range of porosity and permeability, making it crucial to select sites with large enough values of these properties. Numerical modeling of coupled groundwater and heat flow can be used to determine how large is large enough. Both closed-loop and open-loop systems are being investigated. Another option being considered is using cool seawater as the source of chill. Currently work is progressing on two fronts. A hydrogeologic model for a closed-loop system is being developed for the Stan Sheriff Center at the UH Manoa campus, where a subsurface karst system immediately downgradient of the borefield may provide efficient removal of heated groundwater. The team will also develop a technoeconomic model for this site to compare the cost of cooling using a GHE system with the costs of operating the current air conditioning system. At the state scale, geographic information system (GIS) layers of various attributes relevant for GHE are being combined to develop an overall favorability map for employing GHE in Hawai‘i.

Doughty, C↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, This is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates - DOE Hydrogen Program AMR Presentation

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, this is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗

Sensing and arresting metal corrosion in molten chloride salts at 800 degrees Celsius

Originally this was planned as a 5 task, 3 year project, starting in May 2019. Task 1 Detecting oxidants and metal corrosion in molten chloride salt at 800°C. Task 2 Effectiveness of Zr getter using head gas sensors of inlet and outlet gases. Task 3 Cathodic protection of metal in molten salt at reducing potential. Task 4 Find reduction potential of metals in molten chloride salts & quantum modeling. Task 5 Develop corrosion test sections integrated into molten salt flow loop. After Q4, the project was scaled back and the reorganized SOPO was reduced to 3 tasks to be completed at the end of Q7 on 01/05/2021. The 3 SOPO tasks are: Task 1 Sense oxidants and the metal corrosion in molten Na-K-Mg-Cl salt at 800°C. Task 3 Cathodically protect H230 alloy in molten Na-K-Mg-Cl salt at 800C by making H230 alloy the cathode of a power supply with a chromium-rich-metal as the anode. Task 4 Find the reduction potential of Cr metal in molten Na-K-Mg-Cl salt at 800°C. The total timeline was reduced from 12 to 7 quarters with the end date being, January 5, 2021. This amounted to task 1,3 and 4 being done in Q5,6 and 7 of an extended year 1, ending on January 5, 2021. Task 1, 3 and 4 were completed. For task1) the increase of oxidants in molten salt is detected by two things: i) a positive shift of the electrode potential for a Haynes 230 alloy (H230) metal coupon versus a silver/silver-chloride reference electrode (SSE) and ii) an increase in the corrosion rate of a H230 electrode at 800C. For task 3) applying a cathodic potential (negative overpotential) to a H230 electrode versus SSE arrested the corrosion of the cathodically protected H230 compared to an unprotected “spectator H230 electrode” in the same molten chloride salt. Lastly, for task 4) the reduction potential of chrome and chrome rich, and nickel metal electrodes were measured. The most valuable outcome of this work is that a power supply can arrest metal corrosion for metal in molten chloride salt when the power supply applies a cathodic potential to bare metal, like H230, in molten chloride salts, like ternary Mg-K-Na-chloride salt. H230 is a high strength metal for containing molten chloride salt and ternary Mg-K-Na-chloride salt is used as heat transfer fluids in concentrating solar power plants. When to use cathodic protection for protecting metal in molten chloride salts? Two scenarios are envisioned: 1) for protecting high-valued components, like solar collectors and heat exchangers and 2) for protecting the bare surface in holidays (point defects) of corrosion inhibitors that are to intended to cover the entire surface of metal.

14 SOLAR ENERGY↗

New High-Entropy Perovskite Oxides with Increased Reducibility and Stability for Thermochemical Hydrogen Generation

This project aims to design, synthesize, and test a transformative class of High-Entropy Perovskite Oxides (HEPOs) as redox oxides to enable thermochemical hydrogen generation with improved stability, kinetics, and efficiency. These developed HEPOs are expected to demonstrate improved kinetics with oxygen surface exchange coefficient ( k > 7.5×10 -4 cm/s) in Budget Period (BP) 1, retain its structural stability in a broad range of oxygen non-stoichiometry (Δδ > 0.15) at a low operating reduction temperature of T red < 1400°C in BP 2, and deliver a H 2 yield of over 400 µmol per gram of oxide and high stability with less than 20% degradation after at least 50 cycles in BP 3. This project is feasible due to the unique thermodynamic properties (simultaneously increased reducibility and phase stability) and kinetic characters (stability against particle coarsening and potentially enhanced oxygen transport and surface reaction kinetics) of such HEPOs, and it is enabled by a unique active learning computational design approach. Computational studies have been conducted to investigate the oxygen vacancy formation in complex perovskite systems. * Accurate prediction of V O .. concentration with disordered A-site cations in Fe-based high-entropy perovskite oxides * Combined MC/DFT computation elucidates the mechanism of Co preference on the redox due to the strain introduced by local distortion. In this project, we explored a large number (~150) of perovskite compositions, which are listed in Tables 2 – 4). * All perovskite specimens have been synthesized through a high-throughput high-energy ball milling process, followed by the conventional sintering process. * XRD, SEM/EDS and TGA were performed to confirm the crystal structure, phase homogeneity and oxygen non-stoichiometry for compositionally complex perovskite oxides (CCPOs). * 110 compositions show single-phase from XRD * Unusual aliovalent doping effects in medium-entropy perovskite compositions. * V-shape relation between Δδ vs. x (La 1-x Sr x )(Mn 1/3 Fe 1/3 Ti 1/3 )O 3 * The highest reported hydrogen production for the CCPOs made in this project ( T re = 1350 ºC 30 min, T Ox = 1100 ºC 30 min) * B-site mixing (La 0.8 Sr 0.2 )(Mn 0.2 Fe 0.2 Co 0.4 Al 0.2 )O 3 : 89.97 ± 2.73 mmol H2 /mol oxide (395 ± 10 μmol/g oxide ) (i) No phase transformation during reactions when Co molar ratio is less than 61% (ii) Balance between intrinsic kinetics (oxygen surface exchange) and thermodynamics (oxygen non-stoichiometry) (iii) Preference of Co identified by in-situ XPS * A-site mixing (La 1/6 Pr 1/6 Nd 1/6 Gd 1/6 Ba 1/6 Sr1/6)MnO 3 : 98.48 mmol H2 /mol oxid e (~415 μmol/g oxide )

08 HYDROGEN↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗