Evaluation of β-Amino Acid Replacements in Protein Loops: Effects on Conformational Stability and Structure
Abstract not provided
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided
This case study describes how Target developed an optimized, re-engineered process that integrates several energy-efficiency measures such as reduced lighting loads, improved roof insulation, optimized ventilation, and more accurate load calculations through its rooftop unit (RTU) replacement program. Target's approach achieved ongoing energy reduction, operations and maintenance reduction, and improved heating, ventilating, and air-conditioning (HVAC) performance by reducing equipment cycling.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract Not Provided
Abstract not provided
Abstract not provided
The lowest lying singlet and triplet states of nine relatives of cyanomethylene are studied with highly rigorous ab initio methods, and periodic trends in their electronic structures are analyzed.
Replacement reactions commonly alter the multiscale pore structures of rocks during fluid-rock interactions. Analysis of these processes in various model fluid-rock systems during controlled laboratory experiments provides insights into the origins of microstructures found in natural materials. This study focused on understanding the effects of initial starting material permeability and resultant differences in transport pathways on porosity and mineralogical changes during limestone dolomitization.A series of replacement experiments (32–317 days in duration) have been conducted in which 1.59 cm (5/8 in.) diameter cores of two different limestones were reacted with saturated MgCl2 solutions at 200 °C. The Texas Cream (Austin Chalk) is a high-porosity, high-permeability limestone, whereas both the porosity and permeability of the Carthage Marble (Burlington Limestone) are relatively low. Altered limestones were imaged using scanning electron microscopy with energy-dispersive X-ray spectroscopy (SEM-EDX), Time-of-Flight Secondary Ion Mass Spectrometry (ToF–SIMS) and electron microprobe analysis (EMPA). A representative grain boundary of the low-porosity limestone was targeted for a focused ion beam (FIB) lift-out and characterized using transmission electron microscopy (TEM). These results were coupled with analyses of radial changes in the porosity distribution of the core derived from X-ray and neutron small- and ultra-small angle scattering ((U)SANS/(U)SAXS).The high-porosity/permeability limestone showed a four times faster bulk replacement rate than the lower-porosity/permeability material, and a different mechanism of porosity development. For the low-porosity limestone, a two-stage replacement occurred, with the reacted region of the core consisting of an inner rim in which the limestone was replaced by two calcite-dolomite solid solutions, and an outer rim in which the dolomite was replaced by magnesite. Elongated pores formed along grain boundaries at the initial limestone/dolomite reaction interface, and additional nanometer-scale porosity was formed at the secondary magnesite replacement rim. Grain boundaries were identified as preferential pathways for transport leading to dolomitization and a grain boundary diffusion rate was calculated based on microstructural characterization. In contrast, replacement in the high-porosity limestone was accompanied by porosity generation through replacement of individual grains by dolomite throughout the sample and, in longer runs, magnesite in outer parts of the core. These observations emphasize that both the mechanisms of the replacement reaction and the microstructure and chemistry of the replaced product are contingent on the initial structure of the starting material.
The primary objective of this task was to provide a recommendation for a replaceable paddle that could be incorporated into the Saltstone Production Facility (SPF) process. The replaceable paddle concept was proposed given the time it took to replace the existing paddle designs was approximately a week of downtime. Two different types of replaceable paddles were considered, a split paddle and a replaceable tip paddle. The split paddle design was developed; however, a review of the drawings by maintenance personnel determined that changeout of the new design would take about the same time/effort as replacing the existing paddles. Five different replaceable tip designs were considered: side attachment, V neck, straight notch, angled notch, and dovetail. The recommended replaceable tip design was the angled notch, which includes a central hub with two angled notches, where the replaceable tips are secured to the hub using two ½” – 13 Unified National Coarse Threads (UNC) socket head cap screws (SHCS). Design drawing for both the flat and helical paddle blades are complete and are included in Appendix A. A structural calculation (M-CLC-Z-00137) was performed on this design which determined the design is structurally adequate for normal or extreme loads that would be encountered in the SPF READCOTM mixer. This calculation is included in Appendix C. Based on the calculation, mechanical failure will not limit the life of the tip or tip attachment. The quantity of erosion will be the primary driver dictating tip replacement schedules.
Since United States of America federal legislation has required ozone depleting chemicals (class 1 & 2) to be banned from production, The National Aeronautics and Space Administration (NASA) and industry have been required to find other chemicals and methods to replace these target chemicals. This project was initiated as a development of a prioritization methodology suitable for assessing and ranking existing processes for replacement 'urgency.' The methodology was produced in the form of a workbook (NASA Technical Paper 3421). The final workbook contains two tools, one for evaluation and one for prioritization. The two tools are interconnected in that they were developed from one central theme - chemical replacement due to imposed laws and regulations. This workbook provides matrices, detailed explanations of how to use them, and a detailed methodology for prioritization of replacement technology. The main objective is to provide a GUIDELINE to help direct the research for replacement technology. The approach for prioritization called for a system which would result in a numerical rating for the chemicals and processes being assessed. A Quality Function Deployment (QFD) technique was used in order to determine numerical values which would correspond to the concerns raised and their respective importance to the process. This workbook defines the approach and the application of the QFD matrix. This technique: (1) provides a standard database for technology that can be easily reviewed, and (2) provides a standard format for information when requesting resources for further research for chemical replacement technology. Originally, this workbook was to be used for Class 1 and Class 2 chemicals, but it was specifically designed to be flexible enough to be used for any chemical used in a process (if the chemical and/or process needs to be replaced). The methodology consists of comparison matrices (and the smaller comparison components) which allow replacement technology to be quantitatively compared in several categories, and a QFD matrix which allows process/chemical pairs to be rated against one another for importance (using consistent categories). Depending on the need for application, one can choose the part(s) needed or have the methodology completed in its entirety. For example, if a program needs to show the risk of changing a process/chemical one may choose to use part of Matrix A and Matrix C. If a chemical is being used, and the process must be changed; one might use the Process Concerns part of Matrix D for the existing process and all possible replacement processes. If an overall analysis of a program is needed, one may request the QFD to be completed.
The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore we are challenged to reduce the mass of the food system by 10% while maintaining safety, nutrition, and acceptability to support crew health and performance for exploration missions. Meal replacement with nutritionally balanced, 700-900 calorie bars was identified as a method to reduce mass. However, commercially available products do not meet the requirements for a meal replacement in the spaceflight food system. The purpose of this task was to develop a variety of nutritionally balanced, high quality, breakfast replacement bars, which enable a 10% food mass savings. To date, six nutrient-dense meal replacement bars have been developed, all of which meet spaceflight nutritional, microbiological, sensory, and shelf-life requirements. The four highest scoring bars were evaluated based on final product sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. color and texture), and microbiological compliance over a period of two years to predict long-term acceptability. All bars maintained overall acceptability throughout the first year of storage, despite minor changes in color and texture. However, added vitamins C, B1, and B9 degraded rapidly in fortified samples of Banana Nut bars, indicating the need for additional development. In addition to shelf-life testing, four bar varieties were evaluated in the Human Exploration Research Analog (HERA), campaign 3, to assess the frequency with which actual meal replacement options may be implemented, based on impact to satiety and psychosocial measurements. Crewmembers (n=16) were asked to consume meal replacement bars every day for the first fifteen days of the mission and every three days for the second half of the mission. Daily surveys assessed the crew's responses to bar acceptability, mood, food fatigue and perceived stress. Preliminary results indicate that the majority of crew members were noncompliant with daily meal replacement during the first half of the mission. Several crew members chose to forgo the meal, resulting in caloric deficits that were higher on skipped-bar days. Body mass loss was significant throughout the mission. Although there was no significant difference in body mass loss overall between the first half and second half of the mission, a higher number of individual crew members lost more body mass in the first half of the mission. Analysis is still ongoing, but current trends suggest that daily involuntary meal replacement can lead to greater individual impacts on body mass and psychological factors, while meal replacement on a more limited basis may be acceptable to most crew for missions up to 30 days. This data should be considered in Orion mass trades with health and human performance.
The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)
Molecular-replacement phasing of macromolecular crystal structures is often fast, but if a molecular-replacement solution is not immediately obtained the crystallographer must judge whether to pursue molecular replacement or to attempt experimental phasing as the quickest path to structure solution. The introduction of the expected log-likelihood gain has given the crystallographer a powerful new tool to aid in making this decision. The eLLG is the log-likelihood gain on intensity expected from a correctly placed model. It is calculated as a sum over the reflections of a function dependent on the fraction of the scattering for which the model accounts, the estimated model coordinate error and the measurement errors in the data. It is shown how the eLLG may be used to answer the question 'can I solve my structure by molecular replacement?'. However, this is only the most obvious of the applications of the eLLG. It is also discussed how the eLLG may be used to determine the search order and minimal data requirements for obtaining a molecular-replacement solution using a given model, and for decision making in fragment-based molecular replacement, single-atom molecular replacement and likelihood-guided model pruning.
ABSTRACT Objective: Dialysis patients may not have access to conventional renal replacement therapy (RRT) following disasters. We hypothesized that improvised renal replacement therapy (ImpRRT) would be comparable to continuous renal replacement therapy (CRRT) in a porcine acute kidney injury model. Methods: Following bilateral nephrectomies and 2 hours of caudal aortic occlusion, 12 pigs were randomized to 4 hours of ImpRRT or CRRT. In the ImpRRT group, blood was circulated through a dialysis filter using a rapid infuser to collect the ultrafiltrate. Improvised replacement fluid, made with stock solutions, was infused pre-pump. In the CRRT group, commercial replacement fluid was used. During RRT, animals received isotonic crystalloids and norepinephrine. Results: There were no differences in serum creatinine, calcium, magnesium, or phosphorus concentrations. While there was a difference between groups in serum potassium concentration over time ( P < 0.001), significance was lost in pairwise comparison at specific time points. Replacement fluids or ultrafiltrate flows did not differ between groups. There were no differences in lactate concentration, isotonic crystalloid requirement, or norepinephrine doses. No difference was found in electrolyte concentrations between the commercial and improvised replacement solutions. Conclusion: The ImpRRT system achieved similar performance to CRRT and may represent a potential option for temporary RRT following disasters.