Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Rooftop Unit Replacement: Target's Rooftop Unit Replacement Program

This case study describes how Target developed an optimized, re-engineered process that integrates several energy-efficiency measures such as reduced lighting loads, improved roof insulation, optimized ventilation, and more accurate load calculations through its rooftop unit (RTU) replacement program. Target's approach achieved ongoing energy reduction, operations and maintenance reduction, and improved heating, ventilating, and air-conditioning (HVAC) performance by reducing equipment cycling.

HVAC, Rooftop Unit, RTU, commercial, retail, air c↗

Influence of microstructure on replacement and porosity generation during experimental dolomitization of limestones

Replacement reactions commonly alter the multiscale pore structures of rocks during fluid-rock interactions. Analysis of these processes in various model fluid-rock systems during controlled laboratory experiments provides insights into the origins of microstructures found in natural materials. This study focused on understanding the effects of initial starting material permeability and resultant differences in transport pathways on porosity and mineralogical changes during limestone dolomitization.A series of replacement experiments (32–317 days in duration) have been conducted in which 1.59 cm (5/8 in.) diameter cores of two different limestones were reacted with saturated MgCl2 solutions at 200 °C. The Texas Cream (Austin Chalk) is a high-porosity, high-permeability limestone, whereas both the porosity and permeability of the Carthage Marble (Burlington Limestone) are relatively low. Altered limestones were imaged using scanning electron microscopy with energy-dispersive X-ray spectroscopy (SEM-EDX), Time-of-Flight Secondary Ion Mass Spectrometry (ToF–SIMS) and electron microprobe analysis (EMPA). A representative grain boundary of the low-porosity limestone was targeted for a focused ion beam (FIB) lift-out and characterized using transmission electron microscopy (TEM). These results were coupled with analyses of radial changes in the porosity distribution of the core derived from X-ray and neutron small- and ultra-small angle scattering ((U)SANS/(U)SAXS).The high-porosity/permeability limestone showed a four times faster bulk replacement rate than the lower-porosity/permeability material, and a different mechanism of porosity development. For the low-porosity limestone, a two-stage replacement occurred, with the reacted region of the core consisting of an inner rim in which the limestone was replaced by two calcite-dolomite solid solutions, and an outer rim in which the dolomite was replaced by magnesite. Elongated pores formed along grain boundaries at the initial limestone/dolomite reaction interface, and additional nanometer-scale porosity was formed at the secondary magnesite replacement rim. Grain boundaries were identified as preferential pathways for transport leading to dolomitization and a grain boundary diffusion rate was calculated based on microstructural characterization. In contrast, replacement in the high-porosity limestone was accompanied by porosity generation through replacement of individual grains by dolomite throughout the sample and, in longer runs, magnesite in outer parts of the core. These observations emphasize that both the mechanisms of the replacement reaction and the microstructure and chemistry of the replaced product are contingent on the initial structure of the starting material.

36 MATERIALS SCIENCE↗

Conceptual Design for Replaceable Paddle for the Saltstone Production Facility (SPF) Mixer

The primary objective of this task was to provide a recommendation for a replaceable paddle that could be incorporated into the Saltstone Production Facility (SPF) process. The replaceable paddle concept was proposed given the time it took to replace the existing paddle designs was approximately a week of downtime. Two different types of replaceable paddles were considered, a split paddle and a replaceable tip paddle. The split paddle design was developed; however, a review of the drawings by maintenance personnel determined that changeout of the new design would take about the same time/effort as replacing the existing paddles. Five different replaceable tip designs were considered: side attachment, V neck, straight notch, angled notch, and dovetail. The recommended replaceable tip design was the angled notch, which includes a central hub with two angled notches, where the replaceable tips are secured to the hub using two ½” – 13 Unified National Coarse Threads (UNC) socket head cap screws (SHCS). Design drawing for both the flat and helical paddle blades are complete and are included in Appendix A. A structural calculation (M-CLC-Z-00137) was performed on this design which determined the design is structurally adequate for normal or extreme loads that would be encountered in the SPF READCOTM mixer. This calculation is included in Appendix C. Based on the calculation, mechanical failure will not limit the life of the tip or tip attachment. The quantity of erosion will be the primary driver dictating tip replacement schedules.

42 ENGINEERING↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the application of the expected log-likelihood gain to decision making in molecular replacement

Molecular-replacement phasing of macromolecular crystal structures is often fast, but if a molecular-replacement solution is not immediately obtained the crystallographer must judge whether to pursue molecular replacement or to attempt experimental phasing as the quickest path to structure solution. The introduction of the expected log-likelihood gain has given the crystallographer a powerful new tool to aid in making this decision. The eLLG is the log-likelihood gain on intensity expected from a correctly placed model. It is calculated as a sum over the reflections of a function dependent on the fraction of the scattering for which the model accounts, the estimated model coordinate error and the measurement errors in the data. It is shown how the eLLG may be used to answer the question 'can I solve my structure by molecular replacement?'. However, this is only the most obvious of the applications of the eLLG. It is also discussed how the eLLG may be used to determine the search order and minimal data requirements for obtaining a molecular-replacement solution using a given model, and for decision making in fragment-based molecular replacement, single-atom molecular replacement and likelihood-guided model pruning.

59 BASIC BIOLOGICAL SCIENCES↗

Improvised Field Expedient Method for Renal Replacement Therapy in a Porcine Model of Acute Kidney Injury

ABSTRACT Objective: Dialysis patients may not have access to conventional renal replacement therapy (RRT) following disasters. We hypothesized that improvised renal replacement therapy (ImpRRT) would be comparable to continuous renal replacement therapy (CRRT) in a porcine acute kidney injury model. Methods: Following bilateral nephrectomies and 2 hours of caudal aortic occlusion, 12 pigs were randomized to 4 hours of ImpRRT or CRRT. In the ImpRRT group, blood was circulated through a dialysis filter using a rapid infuser to collect the ultrafiltrate. Improvised replacement fluid, made with stock solutions, was infused pre-pump. In the CRRT group, commercial replacement fluid was used. During RRT, animals received isotonic crystalloids and norepinephrine. Results: There were no differences in serum creatinine, calcium, magnesium, or phosphorus concentrations. While there was a difference between groups in serum potassium concentration over time ( P < 0.001), significance was lost in pairwise comparison at specific time points. Replacement fluids or ultrafiltrate flows did not differ between groups. There were no differences in lactate concentration, isotonic crystalloid requirement, or norepinephrine doses. No difference was found in electrolyte concentrations between the commercial and improvised replacement solutions. Conclusion: The ImpRRT system achieved similar performance to CRRT and may represent a potential option for temporary RRT following disasters.

Public, Environmental & Occupational Health↗

Replacing non-biomedical concepts improves embedding of biomedical concepts

Embeddings are semantically meaningful representations of words in a vector space, commonly used to enhance downstream machine learning applications. Traditional biomedical embedding techniques often replace all synonymous words representing biological or medical concepts with a unique token, ensuring consistent representation and improving embedding quality. However, the potential impact of replacing non-biomedical concept synonyms has received less attention. Embedding approaches often employ concept replacement to replace concepts that span multiple words, such as non-small-cell lung carcinoma, with a single concept identifier (e.g., D002289). Also, all synonyms of each concept are merged into the same identifier. Here, we additionally leveraged WordNet to identify and replace sets of non-biomedical synonyms with their most common representatives. This combined approach aimed to reduce embedding noise from non-biomedical terms while preserving the integrity of biomedical concept representations. We applied this method to 1,055 biomedical concept sets representing molecular signatures or medical categories and assessed the mean pairwise distance of embeddings with and without non-biomedical synonym replacement. A smaller mean pairwise distance was interpreted as greater intra-cluster coherence and higher embedding quality. Embeddings were generated using the Word2Vec algorithm applied to a corpus of 10 million PubMed abstracts. Our results demonstrate that the addition of non-biomedical synonym replacement reduced the mean intra-cluster distance by an average of 8%, suggesting that this complementary approach enhances embedding quality. Future work will assess its applicability to other embedding techniques and downstream tasks. Python code implementing this method is provided under an open-source license.

algorithms↗

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗