Search NASASearch

SEARCH · Search NASA

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Operational Implementation of a Pc Uncertainty Construct for Conjunction Assessment Risk Analysis

Earlier this year the NASA Conjunction Assessment and Risk Analysis (CARA) project presented the theoretical and algorithmic aspects of a method to include the uncertainties in the calculation inputs when computing the probability of collision (Pc) between two space objects, principally uncertainties in the covariances and the hard-body radius. The output of this calculation approach is to produce rather than a single Pc value an entire probability density function that will represent the range of possible Pc values given the uncertainties in the inputs and bring CA risk analysis methodologies more in line with modern risk management theory. The present study provides results from the exercise of this method against an extended dataset of satellite conjunctions in order to determine the effect of its use on the evaluation of conjunction assessment (CA) event risk posture. The effects are found to be considerable: a good number of events are downgraded from or upgraded to a serious risk designation on the basis of consideration of the Pc uncertainty. The findings counsel the integration of the developed methods into NASA CA operations.

assessment

Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

Bonine, Lauren

Multidimensional Risk Analysis: MRISK

Multidimensional Risk (MRISK) calculates the combined multidimensional score using Mahalanobis distance. MRISK accounts for covariance between consequence dimensions, which de-conflicts the interdependencies of consequence dimensions, providing a clearer depiction of risks. Additionally, in the event the dimensions are not correlated, Mahalanobis distance reduces to Euclidean distance normalized by the variance and, therefore, represents the most flexible and optimal method to combine dimensions. MRISK is currently being used in NASA's Environmentally Responsible Aviation (ERA) project o assess risk and prioritize scarce resources.

McCollum, Raymond

Carbon/graphite fiber risk analysis and assessment study: Assessment of risk to the Lockheed Model L-1011 commercial transport aircraft

The risk associated with the accidental release of carbon/graphite fibers (CF) from fires on commercial transport aircraft incorporating composite materials was assessed. Data are developed to evaluate the potential for CF damage to electrical and electronic equipment, assess the cost risk, and evaluate the hazard to continued operation. The subjects covered include identification of susceptible equipments, determination of infiltration transfer functions, analysis of airport operations, calculation of probabilities of equipment failures, assessment of the cost risk, and evaluation of the hazard to continued operation. The results show the risks associated with CF contamination are negligible through 1993.

Daniledes, J.

Risk analysis of computer system designs

Adverse events during implementation can affect final capabilities, schedule and cost of a computer system even though the system was accurately designed and evaluated. Risk analysis enables the manager to forecast the impact of those events and to timely ask for design revisions or contingency plans before making any decision. This paper presents a structured procedure for an effective risk analysis. The procedure identifies the required activities, separates subjective assessments from objective evaluations, and defines a risk measure to determine the analysis results. The procedure is consistent with the system design evaluation and enables a meaningful comparison among alternative designs.

Vallone, A.

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.

Risk Analysis for Resource Planning Optimization

The main purpose of this paper is to introduce a risk management approach that allows planners to quantify the risk and efficiency tradeoff in the presence of uncertainties, and to make forward-looking choices in the development and execution of the plan. Demonstrate a planning and risk analysis framework that tightly integrates mathematical optimization, empirical simulation, and theoretical analysis techniques to solve complex problems.

resource planning optimization

Satellite Conjunction “Probability,” “Plausibility,” and “Possibility”: A Categorization of Competing Satellite Conjunction Assessment Risk Analysis Paradigms

A number of different conjunction assessment (CA) risk analysis methods and metrics have been proposed in the critical literature, and they vary widely in purport and form. However, they tend to be proposed individually and episodically, so that it is difficult for a CA practitioner to take stock of the possibilities, under- stand their fundamental differences, and make informed choices for their particular CA risk assessment enterprise. The present study seeks to collect the major proposals for risk assessment methods and parameters and organize them categorically, under the proposed divisions of “probability,” “plausibility,” and “possibility,” as well as formulate what appears for each to be its fundamental question and, where applicable, null hypothesis. This activity can, through a bottom-up approach, provide some of the building blocks for an overarching CA philosophy, as well as establish concepts and terminology potentially useful to the broader discussion of these topics.

Hejduk, M. D.

A Probabilistic Risk Analysis (PRA) of Human Space Missions for the Advanced Integration Matrix (AIM)

The Advanced Integration Matrix (AIM) Project u7ill study and solve systems-level integration issues for exploration missions beyond Low Earth Orbit (LEO), through the design and development of a ground-based facility for developing revolutionary integrated systems for joint human-robotic missions. This paper describes a Probabilistic Risk Analysis (PRA) of human space missions that was developed to help define the direction and priorities for AIM. Risk analysis is required for all major NASA programs and has been used for shuttle, station, and Mars lander programs. It is a prescribed part of early planning and is necessary during concept definition, even before mission scenarios and system designs exist. PRA cm begin when little failure data are available, and be continually updated and refined as detail becomes available. PRA provides a basis for examining tradeoffs among safety, reliability, performance, and cost. The objective of AIM's PRA is to indicate how risk can be managed and future human space missions enabled by the AIM Project. Many critical events can cause injuries and fatalities to the crew without causing loss of vehicle or mission. Some critical systems are beyond AIM's scope, such as propulsion and guidance. Many failure-causing events can be mitigated by conducting operational tests in AIM, such as testing equipment and evaluating operational procedures, especially in the areas of communications and computers, autonomous operations, life support, thermal design, EVA and rover activities, physiological factors including habitation, medical equipment, and food, and multifunctional tools and repairable systems. AIM is well suited to test and demonstrate the habitat, life support, crew operations, and human interface. Because these account for significant crew, systems performance, and science risks, AIM will help reduce mission risk, and missions beyond LEO are far enough in the future that AIM can have significant impact.

Jones, Harry W.

Statistical Prediction of Solar Particle Event Frequency Based on the Measurements of Recent Solar Cycles for Acute Radiation Risk Analysis

Large solar particle events (SPEs) present significant acute radiation risks to the crew members during extra-vehicular activities (EVAs) or in lightly shielded space vehicles for space missions beyond the protection of the Earth's magnetic field. Acute radiation sickness (ARS) can impair performance and result in failure of the mission. Improved forecasting capability and/or early-warning systems and proper shielding solutions are required to stay within NASA's short-term dose limits. Exactly how to make use of observations of SPEs for predicting occurrence and size is a great challenge, because SPE occurrences themselves are random in nature even though the expected frequency of SPEs is strongly influenced by the time position within the solar activity cycle. Therefore, we developed a probabilistic model approach, where a cumulative expected occurrence curve of SPEs for a typical solar cycle was formed from a non-homogeneous Poisson process model fitted to a database of proton fluence measurements of SPEs that occurred during the past 5 solar cycles (19 - 23) and those of large SPEs identified from impulsive nitrate enhancements in polar ice. From the fitted model, the expected frequency of SPEs was estimated at any given proton fluence threshold (Phi(sub E)) with energy (E) >30 MeV during a defined space mission period. Corresponding Phi(sub E) (E=30, 60, and 100 MeV) fluence distributions were simulated with a random draw from a gamma distribution, and applied for SPE ARS risk analysis for a specific mission period. It has been found that the accurate prediction of deep-seated organ doses was more precisely predicted at high energies, Phi(sub 100), than at lower energies such as Phi(sub 30) or Phi(sub 60), because of the high penetration depth of high energy protons. Estimates of ARS are then described for 90th and 95th percentile events for several mission lengths and for several likely organ dose-rates. The ability to accurately measure high energy protons (50-300 MeV) in real-time is shown to be a crucial issue for crew protection.

Myung-Hee, Y. Kim

Computational Icing Risk Analysis of the D8 "Double Bubble" Aircraft

A computational icing risk analysis utilizing LEWICE3D was performed for the D8 Double Bubble aircraft. A variety of discrete drop sizes spanning the Appendix C and O regimes were simulated. For computational efficiency a 50-bin global discretization was produced and projected onto the distributions of interest, eliminating redundant simulations. The trajectory and impingement characteristics for discrete drop diameters were analyzed to help understand the behavior of the water drops in the presence of a complex flow field. The collection efficiency results for the discrete drop diameters were then weighted by their contributions to the total water content of six different continuous distributions and subsequently superposed to approximate these curves. Results indicate that significant variation in impingement exists as a function of drop diameter for complex wing body geometries, and that current discretization practices may be insufficient to accurately predict water collection on certain regions of the aircraft. Results also indicate that the Appendix O distributions, specifically those with considerable water content at large drops, generates water collection patterns that are markedly different from distributions representative of Appendix C.

icing

Computational Icing Risk Analysis of the D8 "Double Bubble" Aircraft

A computational icing risk analysis utilizing LEWICE3D was performed for the D8 Double Bubble aircraft. A variety of discrete drop sizes spanning the Appendix C and O regimes were simulated. For computational efficiency a 50-bin global discretization was produced and projected onto the distributions of interest, eliminating redundant simulations. The trajectory and impingement characteristics for discrete drop diameters were analyzed to help understand the behavior of the water drops in the presence of a complex flow field. The collection efficiency results for the discrete drop diameters were then weighted by their contributions to the total water content of six different continuous distributions and subsequently superposed to approximate these curves. Results indicate that significant variation in impingement exists as a function of drop diameter for complex wing body geometries, and that current discretization practices may be insufficient to accurately predict water collection on certain regions of the aircraft. Results also indicate that the Appendix O distributions, specifically those with considerable water content at large drops, generates water collection patterns that are markedly different from distributions representative of Appendix C.

Porter, Christopher E.

NASA Conjunction Assessment Risk Analysis (CARA) Ground Systems, Software and Operations Infrastructure Cloud Implementation

The growing number of large-scale constellations and the improvements made in the tracking and detection of resident space objects have contributed to the increase of satellite conjunction events. As a result of the increase of objects in Earth orbit, the timeline for risk analysis computations for satellite collision avoidance is more urgent when conjunctions occur. It is imperative NASA maintains a space environment safety functionality for the agency that allows CARA remote access to the ground system while maintaining redundancy. CARA’s On-premises (On-prem) ground system would no longer be able to meet these access and redundancy requirements, hence the investigation and eventual implementation of a Cloud-based ground station infrastructure as a viable solution. This paper will provide an overview of the principal parts of the Conjunction Assessment (CA) risk analysis process used at CARA, summarize the key drivers towards the Cloud solution, and share key lessons learned that are significant for any operational entity considering a cloud solution for real-time satellite operations to ensure a sustainable space traffic environment for all.

Sustainability

The JPL Cost Risk Analysis Approach that Incorporates Engineering Realism

This paper discusses the JPL Cost Engineering Group (CEG) cost risk analysis approach that accounts for all three types of cost risk. It will also describe the evaluation of historical cost data upon which this method is based. This investigation is essential in developing a method that is rooted in engineering realism and produces credible, dependable results to aid decision makers.

cost risk

Fire behavior and risk analysis in spacecraft

Practical risk management for present and future spacecraft, including space stations, involves the optimization of residual risks balanced by the spacecraft operational, technological, and economic limitations. Spacecraft fire safety is approached through three strategies, in order of risk: (1) control of fire-causing elements, through exclusion of flammable materials for example; (2) response to incipient fires through detection and alarm; and (3) recovery of normal conditions through extinguishment and cleanup. Present understanding of combustion in low gravity is that, compared to normal gravity behavior, fire hazards may be reduced by the absence of buoyant gas flows yet at the same time increased by ventilation flows and hot particle expulsion. This paper discusses the application of low-gravity combustion knowledge and appropriate aircraft analogies to fire detection, fire fighting, and fire-safety decisions for eventual fire-risk management and optimization in spacecraft.

Friedman, Robert

System Safety Risk Analysis Models (SSRAM)

This presentation provides a high level overview of the System Safety Risk Analysis (SSRAM) methodology and motivation.

Clark, Andrew Jordan [Sandia National Laboratories