Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Silent Aircraft Initiative Concept Risk Assessment

A risk assessment of the Silent Aircraft Initiative's SAX-40 concept design for extremely low noise has been performed. A NASA team developed a list of 27 risk items, and evaluated the level of risk for each item in terms of the likelihood that the risk would occur and the consequences of the occurrence. The following risk items were identified as high risk, meaning that the combination of likelihood and consequence put them into the top one-fourth of the risk matrix: structures and weight prediction; boundary-layer ingestion (BLI) and inlet design; variable-area exhaust and thrust vectoring; displaced-threshold and continuous descent approach (CDA) operational concepts; cost; human factors; and overall noise performance. Several advanced-technology baseline concepts were created to serve as a basis for comparison to the SAX-40 concept. These comparisons indicate that the SAX-40 would have significantly greater research, development, test, and engineering (RDT&E) and production costs than a conventional aircraft with similar technology levels. Therefore, the cost of obtaining the extremely low noise capability that has been estimated for the SAX-40 is significant. The SAX-40 concept design proved successful in focusing attention toward low noise technologies and in raising public awareness of the issue.

Nickol, Craig L.↗

Schedule Risk Assessment

Schedule Risk Assessment (SRA) determines the probability of finishing on or before a given point in time. This viewgraph presentation introduces the prerequisites, probability distribution curves, special conditions, calculations, and results analysis for SRA.

Smith, Grego↗

Risk-Assessment Computer Program

RISK D/C is prototype computer program assisting in attempts to do program risk modeling for Space Exploration Initiative (SEI) architectures proposed in Synthesis Group Report. Risk assessment performed with respect to risk events, probabilities, and severities of potential results. Enables ranking, with respect to effectiveness, of risk-mitigation strategies proposed for exploration program architecture. Allows for fact that risk assessment in early phases of planning subjective. Although specific to SEI in present form, also used as software framework for development of risk-assessment programs for other specific uses. Developed for Macintosh(TM) series computer. Requires HyperCard(TM) 2.0 or later, as well as 2 Mb of random-access memory and System 6.0.8 or later.

Dias, William C.↗

Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

Paul S. Ray↗

Reliability and Probabilistic Risk Assessment - How They Play Together

PRA methodology is one of the probabilistic analysis methods that NASA brought from the nuclear industry to assess the risk of LOM, LOV and LOC for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability and statistical data to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: What can go wrong? How likely is it? What is the severity of the degradation? Since 1986, NASA, along with industry partners, has conducted a number of PRA studies to predict the overall launch vehicles risks. Planning Research Corporation conducted the first of these studies in 1988. In 1995, Science Applications International Corporation (SAIC) conducted a comprehensive PRA study. In July 1996, NASA conducted a two-year study (October 1996 - September 1998) to develop a model that provided the overall Space Shuttle risk and estimates of risk changes due to proposed Space Shuttle upgrades. After the Columbia accident, NASA conducted a PRA on the Shuttle External Tank (ET) foam. This study was the most focused and extensive risk assessment that NASA has conducted in recent years. It used a dynamic, physics-based, integrated system analysis approach to understand the integrated system risk due to ET foam loss in flight. Most recently, a PRA for Ares I launch vehicle has been performed in support of the Constellation program. Reliability, on the other hand, addresses the loss of functions. In a broader sense, reliability engineering is a discipline that involves the application of engineering principles to the design and processing of products, both hardware and software, for meeting product reliability requirements or goals. It is a very broad design-support discipline. It has important interfaces with many other engineering disciplines. Reliability as a figure of merit (i.e. the metric) is the probability that an item will perform its intended function(s) for a specified mission profile. In general, the reliability metric can be calculated through the analyses using reliability demonstration and reliability prediction methodologies. Reliability analysis is very critical for understanding component failure mechanisms and in identifying reliability critical design and process drivers. The following sections discuss the PRA process and reliability engineering in detail and provide an application where reliability analysis and PRA were jointly used in a complementary manner to support a Space Shuttle flight risk assessment.

Safie, Fayssal M.↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

TCCSP Task 6 Risk Assessment Report

For this Risk Assessment Plan, TCCSP has conducted a site-based risk assessment that quantifies the risk of CO 2 and/or brine leakage as a result of CO 2 injection at TCCSP. The risk assessment covers project planning, construction, injection, post-injection periods and closure of TCCSP. Key technical and non-technical Project risks are identified as part of the Risk Workshop and include a thorough evaluation of related scenarios. Mitigation strategies for the identified risk scenarios are defined to develop a scientifically sound, and community acceptable CO 2 storage Project.

58 GEOSCIENCES↗

Large-scale Hydrogen Storage Risk Assessment

This project investigated risks involved in deploying a large-scale hydrogen storage system at the Port of Seattle (hereafter, the Port) for its on-terminal and maritime applications in an urban industrial setting. Alongside, the project attempted to address some of the barriers to risk assessment such as need for an exact system design for a systematic investigation, direct access to surrounding communities to gauge their perceptions, and an integrated software required to undertake a full-fledged risk assessment. These barriers were overcome using illustrative reference station designs, engaging with community-facing agencies through Port support, and pooling national laboratory capabilities available for risk assessments. The project identified relevant public safety risk metrics, compared various hydrogen carriers, engaged with community-facing agencies, and explored potential gaps in existing safety codes and standards. The primary impacts of this project include the development of risk assessment guidance for ports and utilities, informing them of the trade-offs in the choice of hydrogen carriers, and the ability to increase public capacity for dialog and engagement. This paves the way toward decarbonization of the Port activities, bringing about awareness around jobs in the market for risk assessments, and the need to ramp up community engagement long before any hydrogen system deployment is undertaken.

08 HYDROGEN↗

Risk Assessment in a Chemical Laboratory Following an Explosive Incident Involving a Novel Diazonium Compound: Retrospective Analysis and Lessons Learned

Diazonium compounds are synthetically useful in the production of dyes and textiles, however they are highly explosive under dry conditions. Explosion prevention becomes more difficult when new diazonium compounds are synthesized, because while some syntheses include a counterion to increase their stability, this is not always a reliable method to prevent an explosive incident. Due to the uncertainty surrounding the explosiveness of different diazonium compounds, it is important to understand how to safely clean up after an incident and how to determine when it is safe to return a laboratory to typical operational use, particularly when the incident involves a novel compound where a standard does not exist for instrument calibration. Here, an explosive event is discussed involving the synthesis of 4-bromo-benzenediazonium-2-carboxylate. Following the explosive incident and 3-step cleanup, which involved a precautionary neutralization step, samples were collected from the fume hood where the incident occurred. Because the incident involved an unstable, novel compound that is not commercially available and was deemed unsafe to resynthesize for instrument calibration, we assessed the risk of further explosion by analyzing for the stable decomposition products. Mass spectrometry analysis confirmed that the residue in the fume hood contained 5-bromosalicylic acid, a decomposition product of 4-bromo-benzenediazonium-2-carboxylate. Samples were taken from multiple points in the fume hood and analyzed to estimate the spatial distribution of the decomposition product. Based on this analysis, we inferred that the primary decomposition product was far more abundant than residual energetic, indicating the energetic had been consumed or neutralized to a trace quantity where the risk of further explosion was low. Furthermore, the steps presented here─specifically, initial neutralization and then analyzing the spatial distribution of expected decomposition products to assess risk when a novel explosive material is detonated in a confined space─were our approach to assess further risk following an explosion due to a novel diazonium compound without the need for any further handling or resynthesis of the energetic. Here, we present our approach and critically analyze these steps by discussing retrospective lessons learned and alternative analytical approaches.

Computer simulations↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

Choosing the Best Modeling Platform for Radiological Risk Assessment Models - 20468

Radiological risk assessments, in the form of performance or safety assessments, are often required under regulations or guidance for remediation of contaminated land, decommissioning of contaminated buildings or structures, and radioactive waste disposal. These risk assessments are usually supported by fate and transport models that address decay and ingrowth of radionuclides, as well as their movement through engineered systems and the natural environment. These models are often projected thousands, or more, years into the future, largely because the radioactive species change through decay and ingrowth, and hence the magnitude of the radioactive effect changes with time. There are many computer codes that are available to address this type of modeling. They range from addressing specific pathways or processes such as infiltration of water, groundwater, surface water, air, biota, diffusion and advection of water and gases, to those that try to couple all processes together to evaluate the impact of fate and transport through the entire system to places in space and time to which access is assumed. These different types of codes are sometimes separated with the monikers process-level and systems-level codes, although it is often not clear that this separation does justice to the capabilities of the many codes that are available to evaluate fate and transport of radionuclides. The focus of this paper is the latter group of modeling codes. Several systems level modeling codes exist and are used. There are differences between these codes in terms of utility, flexibility, complexity and cost. The purpose of this paper is to compare a few of these codes in the context of work currently being performed by the International Atomic Energy Agency (IAEA) Modeling and Data for Radiological Impact Assessments (MODARIA) II Working Group 1 (WG1). The MODARIA II WG1's main focus is how stakeholder engaged decision analysis can, or should, be applied to radiological contamination problems so that better, longstanding, sustainable, solutions are reached. However, the WG1 also recognizes the potential impact of the modeling tools that are chosen to address radiological risk, which is often a primary objective of decision making for radiological problems. Other objectives might also be important, such as constraining costs, obtaining financing, minimizing impact on ecosystems, saving cultural resources, saving jobs, farmland, environmental justice, etc., in a full decision analysis for a given radiological contamination problem, but none of these other objectives have the same types of complex modeling needs as minimize radiological dose. Consequently, a further focus of WG1 is to evaluate the potential impacts on decision making of the choice of fate and transport, and risk assessment, modeling codes that are used to support decision making. The WG1 will produce a report at the end of 2020 that will focus on an approach to effective decision making and stakeholder engagement. The report will also consider the role that performance assessment modeling should play in the decision-making process, including the impact of the choice of modeling tools or computer codes on risk-informed decision making. Several sites around the World have been made available by Member States for these model comparisons, and several modeling tools have been considered. However, the focus of this paper is on two of the sites, one in Belgium and one in Ukraine, and on three of the tools: NORMALYSA (NORM And Legacy Site Assessment); GoldSim{sup C}, and AMBER{sup C}. The final report from this working group will also cover other modeling tools, including RESRAD, and PC-Cream{sup R}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Humans vs Hardware: The Unique World of NASA Human System Risk Assessment

Understanding spaceflight risks to crew health and performance is a crucial aspect of preparing for exploration missions in the future. The research activities of the Human Research Program (HRP) provide substantial evidence to support most risk reduction work. The Human System Risk Board (HSRB), acting on behalf of the Office of Chief Health and Medical Officer (OCHMO), assesses these risks and assigns likelihood and consequence ratings to track progress. Unfortunately, many traditional approaches in risk assessment such as those used in the engineering aspects of spaceflight are difficult to apply to human system risks. This presentation discusses the unique aspects of risk assessment from the human system risk perspective and how these limitations are accommodated and addressed in order to ensure that reasonable inputs are provided to support the OCHMO's overall risk posture for manned exploration missions.

Anton, W.↗

NRAP-open-IAM: A flexible open-source integrated-assessment-model for geologic carbon storage risk assessment and management

Large-scale implementation of geologic carbon storage (GCS) to help reduce atmospheric greenhouse gas emissions requires stakeholder confidence that injected CO2 will remain contained and that potential subsurface environmental risks are acceptably small and manageable. The U.S. Department of Energy’s National Risk Assessment Partnership (NRAP) has developed an open-source integrated assessment model (NRAP-Open-IAM) to help address questions about a potential GCS site’s ability to effectively contain injected CO 2 and protect groundwater and other overlying environmentally sensitive receptors. NRAP-Open-IAM allows a user to: (1) incorporate relevant site geologic and injection scenario data; (2) characterize important site features and events;(3) couple fast prediction models of various system components of the engineered geologic system; and (4) execute stochastic, dynamic simulation of whole GCS system performance, leakage risk assessment, and uncertainty quantification. NRAP-Open-IAM is available on GitLab (https://gitlab.com/NRAP/OpenIAM), and is accompanied by multiple application examples and detailed user and developer guides.

54 ENVIRONMENTAL SCIENCES↗