Search NASA⌕ Search

SEARCH · Search NASA

Results for “robotic assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Interset: A natural language interface for teleoperated robotic assembly of the EASE space structure

A teleoperated robot was used to assemble the Experimental Assembly of Structures in Extra-vehicular activity (EASE) space structure under neutral buoyancy conditions, simulating a telerobot performing structural assembly in the zero gravity of space. This previous work used a manually controlled teleoperator as a test bed for system performance evaluations. From these results several Artificial Intelligence options were proposed. One of these was further developed into a real time assembly planner. The interface for this system is effective in assembling EASE structures using windowed graphics and a set of networked menus. As the problem space becomes more complex and hence the set of control options increases, a natural language interface may prove to be beneficial to supplement the menu based control strategy. This strategy can be beneficial in situations such as: describing the local environment, maintaining a data base of task event histories, modifying a plan or a heuristic dynamically, summarizing a task in English, or operating in a novel situation.

Boorsma, Daniel K.↗

Ground controlled robotic assembly operations for Space Station Freedom

A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

Parrish, Joseph C.↗

End-effector for robotic assembly of welded truss structures in space

In June 1987, work was initiated at LaRC on end-effectors and preloaded joints for robotic truss assembly. This is part of an on-going research effort centered on a test facility that assembles 1 inch x 2 m identical struts into an 8 m diameter x 1.5 m deep platform truss. A detailed description of the test facility was published. The end-effector being used for the LaRC assembly demonstration is quite suitable for the Precision Segmented Reflector or other precision applications. These require high stiffness provided by mechanical joint preloads. Stiffness obtained in this manner is only required and provided over a load range far less than the ultimate strength of the strut tubes. Beyond this useful range, truss behavior is somewhat unpredictable. Mechanically preloaded joints of this type are less suitable for applications such as the Aero Brake where predictable strength and stiffness are required over a greater fraction of the load bearing capacity of component parts. Preliminary studies of the Aerobrake support truss indicate that struts of at least 3 different diameters and various lengths would improve performance. The double-ended end-effector currently in service is designed for only one diameter and length. Anticipated single-ended versions can accommodate varying lengths but not multiple diameters. Tradeoff considerations for welded joints relative to their mechanically preloaded counterparts are presented. Conclusions from this research are as follows: (1) repair by cut and re-weld on the original weld site should be research; (2) welded joints, though repairable, should not be used where high repair frequencies are anticipated; and (3) welded joints should be considered for an Aero Brake truss.

Brewer, William V.↗

Robotic Assembly of Truss Structures for Space Systems and Future Research Plans

Many initiatives under study by both the space science and earth science communities require large space systems, i.e. with apertures greater than 15 m or dimensions greater than 20 m. This paper reviews the effort in NASA Langley Research Center's Automated Structural Assembly Laboratory which laid the foundations for robotic construction of these systems. In the Automated Structural Assembly Laboratory reliable autonomous assembly and disassembly of an 8 meter planar structure composed of 102 truss elements covered by 12 panels was demonstrated. The paper reviews the hardware and software design philosophy which led to reliable operation during weeks of near continuous testing. Special attention is given to highlight the features enhancing assembly reliability.

Doggett, William↗

Structural Feasibility Analysis of a Robotically Assembled Very Large Aperture Optical Space Telescope

This paper presents a feasibility study of robotically constructing a very large aperture optical space telescope on-orbit. Since the largest engineering challenges are likely to reside in the design and assembly of the 150-m diameter primary reflector, this preliminary study focuses on this component. The same technology developed for construction of the primary would then be readily used for the smaller optical structures (secondary, tertiary, etc.). A reasonable set of ground and on-orbit loading scenarios are compiled from the literature and used to define the structural performance requirements and size the primary reflector. A surface precision analysis shows that active adjustment of the primary structure is required in order to meet stringent optical surface requirements. Two potential actuation strategies are discussed along with potential actuation devices at the current state of the art. The finding of this research effort indicate that successful technology development combined with further analysis will likely enable such a telescope to be built in the future.

space telescopes↗

In-Space Robotic Assembly Joint Characterization Approach

This paper describes the test systems and approaches developed to characterize the performance of a structural joint that is intended for robotic in-space assembly (ISA). The design of the joint is based on a heritage concept from National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) originally intended for structural assembly by astronauts during extravehicular activity (EVA). Its design was modified under a public-private partnership and is intended to accelerate the availability of, and reduce costs for the infusion of NASA developed technologies into commercial ISA systems. Test systems were developed to measure the axial, bending, and torsional stiffness of the joint at a wide range of temperatures. A test system was also developed to measure the reliability of the joint in terms of translation and rotation when disassembled and re-assembled in space. These test systems were used to characterize the joint behavior and provide performance data for the iterative joint design process. The paper also lists the lessons learned to aid testing of next generation robotic in-space assembly joints.

Abraham, Nijo A.↗

Experimental Demonstration of Technologies for Autonomous On-Orbit Robotic Assembly

The Modular Reconfigurable High Energy (MRHE) program aimed to develop technologies for the automated assembly and deployment of large-scale space structures and aggregate spacecraft. Part of the project involved creation of a terrestrial robotic testbed for validation and demonstration of these technologies and for the support of future development activities. This testbed was completed in 2005, and was thereafter used to demonstrate automated rendezvous, docking, and self-assembly tasks between a group of three modular robotic spacecraft emulators. This paper discusses the rationale for the MRHE project, describes the testbed capabilities, and presents the MRHE assembly demonstration sequence.

LeMaster, Edward A.↗

Studies in knowledge-based diagnosis of failures in robotic assembly

The telerobot diagnostic system (TDS) is a knowledge-based system that is being developed for identification and diagnosis of failures in the space robotic domain. The system is able to isolate the symptoms of the failure, generate failure hypotheses based on these symptoms, and test their validity at various levels by interpreting or simulating the effects of the hypotheses on results of plan execution. The implementation of the TDS is outlined. The classification of failures and the types of system models used by the TDS are discussed. A detailed example of the TDS approach to failure diagnosis is provided.

Lam, Raymond K.↗

Robotically Assembled Aerospace Structures: Digital Material Assembly using a Gantry-Type Assembler

This paper evaluates the development of automated assembly techniques for discrete lattice structures using a multi-axis gantry type CNC machine. These lattices are made of discrete components called "digital materials." We present the development of a specialized end effector that works in conjunction with the CNC machine to assemble these lattices. With this configuration we are able to place voxels at a rate of 1.5 per minute. The scalability of digital material structures due to the incremental modular assembly is one of its key traits and an important metric of interest. We investigate the build times of a 5x5 beam structure on the scale of 1 meter (325 parts), 10 meters (3,250 parts), and 30 meters (9,750 parts). Utilizing the current configuration with a single end effector, performing serial assembly with a globally fixed feed station at the edge of the build volume, the build time increases according to a scaling law of n4, where n is the build scale. Build times can be reduced significantly by integrating feed systems into the gantry itself, resulting in a scaling law of n3. A completely serial assembly process will encounter time limitations as build scale increases. Automated assembly for digital materials can assemble high performance structures from discrete parts, and techniques such as built in feed systems, parallelization, and optimization of the fastening process will yield much higher throughput.

Manufacturing↗

End-effector-joint conjugates for robotic assembly of large truss structures in space: A second generation

Attachment of strut to node can be accomplished with a variety of mechanisms. All require extensive standoff elements (called scars) added to the nodes. These increase packaging volume for the nodes by as much as 300 percent. First generation designs also tend to be either heavy or expensive due to complex parts. Screws thread mechanisms are discussed simplest and most easily manufactured of alternatives. Torque and rotational motion must be transmitted across the strut to end-effector interface accomplishing the joining process and establishing a specific preload. Four drive mechanisms are considered: worm, helical, bevel, and differential gears.

Brewer, William V.↗

Artificial intelligence approach to planning the robotic assembly of large tetrahedral truss structures

An assembly planner for tetrahedral truss structures is presented. To overcome the difficulties due to the large number of parts, the planner exploits the simplicity and uniformity of the shapes of the parts and the regularity of their interconnection. The planning automation is based on the computational formalism known as production system. The global data base consists of a hexagonal grid representation of the truss structure. This representation captures the regularity of tetrahedral truss structures and their multiple hierarchies. It maps into quadratic grids and can be implemented in a computer by using a two-dimensional array data structure. By maintaining the multiple hierarchies explicitly in the model, the choice of a particular hierarchy is only made when needed, thus allowing a more informed decision. Furthermore, testing the preconditions of the production rules is simple because the patterned way in which the struts are interconnected is incorporated into the topology of the hexagonal grid. A directed graph representation of assembly sequences allows the use of both graph search and backtracking control strategies.

Homemdemello, Luiz S.↗

Verification Test of Automated Robotic Assembly of Space Truss Structures

A multidisciplinary program has been conducted at the Langley Research Center to develop operational procedures for supervised autonomous assembly of truss structures suitable for large-aperture antennas. The hardware and operations required to assemble a 102-member tetrahedral truss and attach 12 hexagonal panels were developed and evaluated. A brute-force automation approach was used to develop baseline assembly hardware and software techniques. However, as the system matured and operations were proven, upgrades were incorporated and assessed against the baseline test results. These upgrades included the use of distributed microprocessors to control dedicated end-effector operations, machine vision guidance for strut installation, and the use of an expert system-based executive-control program. This paper summarizes the developmental phases of the program, the results of several assembly tests, and a series of proposed enhancements. No problems that would preclude automated in-space assembly or truss structures have been encountered. The test system was developed at a breadboard level and continued development at an enhanced level is warranted.

Rhodes, Marvin D.↗

Robotically Assembled Aerospace Structures: Digital Material Assembly using a Gantry-Type Assembler

This paper evaluates the development of automated assembly techniques for discrete lattice structures using a multi-axis gantry type CNC machine. These lattices are made of discrete components called digital materials. We present the development of a specialized end effector that works in conjunction with the CNC machine to assemble these lattices. With this configuration we are able to place voxels at a rate of 1.5 per minute. The scalability of digital material structures due to the incremental modular assembly is one of its key traits and an important metric of interest. We investigate the build times of a 5x5 beam structure on the scale of 1 meter (325 parts), 10 meters (3,250 parts), and 30 meters (9,750 parts). Utilizing the current configuration with a single end effector, performing serial assembly with a globally fixed feed station at the edge of the build volume, the build time increases according to a scaling law of n4, where n is the build scale. Build times can be reduced significantly by integrating feed systems into the gantry itself, resulting in a scaling law of n3. A completely serial assembly process will encounter time limitations as build scale increases. Automated assembly for digital materials can assemble high performance structures from discrete parts, and techniques such as built in feed systems, parallelization, and optimization of the fastening process will yield much higher throughput.

Mechanical Structure↗