Search NASA⌕ Search

SEARCH · Search NASA

Results for “scaled test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Small-scale test program to develop a more efficient swivel nozzle thrust deflector for V/STOL lift/cruise engines

The installed performance degradation of a swivel nozzle thrust deflector system obtained during increased vectoring angles of a large-scale test program was investigated and improved. Small-scale models were used to generate performance data for analyzing selected swivel nozzle configurations. A single-swivel nozzle design model with five different nozzle configurations and a twin-swivel nozzle design model, scaled to 0.15 size of the large-scale test hardware, were statically tested at low exhaust pressure ratios of 1.4, 1.3, 1.2, and 1.1 and vectored at four nozzle positions from 0 deg cruise through 90 deg vertical used for the VTOL mode.

Schlundt, D. W.↗

LAWPS Technology Maturation Program and Scaled Testing - 17408

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 18488

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 16589

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TEs) for the proposed process, designated critical technology elements (CTEs), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS System. The TMP is being utilized to guide the CTEs advancement to Technical Readiness Level (TRL) 6 for the combined Critical Decision 2 and 3 Milestones (CD-2/3) in the 413.3B process. The development of the TMP, the multi-scale testing program, culminating in the integrated scale testing as a predecessor to achieve TRL 6 are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intermediate Scale Testing Recommendation Report

A summary of recommendations for near-term intermediate-scale testing pertaining to a salt repository is provided in this report. Each proposal was asked to implement a phased progression, initiating with test plan production in FY 2017 and early-stage testing, if possible. Beyond 2017, testing is anticipated to progress to an underground setting and involve intermediate-scale field activities. Each test concept was presented at the June 6th 2016 meeting in Las Vegas NV and a team of DOE-NE, DOE-EM, and National Laboratory staff discussed the rnerits of each proposal. Discussions among managers and researchers in the weeks following the meeting led to selection of a path forward for phased testing that includes a series of small diarneter borehole tests designed to illuminate thermomechanical processes and potential vapor and brine transport. These tests are intended to be implemented at the WIPP facility and involve collaboration between SNL, LANL, and LBL. This document summarizes the test concepts generated by the te s of researchers and decisions made subsequent to the June 6th meeting.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting Slag Generation in Sub-Scale Test Motors Using a Neural Network

Generation of slag (aluminum oxide) is an important issue for the Reusable Solid Rocket Motor (RSRM). Thiokol performed testing to quantify the relationship between raw material variations and slag generation in solid propellants by testing sub-scale motors cast with propellant containing various combinations of aluminum fuel and ammonium perchlorate (AP) oxidizer particle sizes. The test data were analyzed using statistical methods and an artificial neural network. This paper primarily addresses the neural network results with some comparisons to the statistical results. The neural network showed that the particle sizes of both the aluminum and unground AP have a measurable effect on slag generation. The neural network analysis showed that aluminum particle size is the dominant driver in slag generation, about 40% more influential than AP. The network predictions of the amount of slag produced during firing of sub-scale motors were 16% better than the predictions of a statistically derived empirical equation. Another neural network successfully characterized the slag generated during full-scale motor tests. The success is attributable to the ability of neural networks to characterize multiple complex factors including interactions that affect slag generation.

Wiesenberg, Brent↗

Evaluation of Methods to Select Scale Velocities in Icing Scaling Tests

A series of tests were made in the NASA Glenn Icing Research Tunnel to determine how icing scaling results were affected by the choice of scale velocity. Reference tests were performed with a 53.3-cm-chord NACA 0012 airfoil model, while scale tests used a 27.7-cm-chord 0012 model. Tests were made with rime, mixed, and glaze ice. Reference test conditions included airspeeds of 67 and 89 m/s, an MVD of 40 microns, and LWCs of 0.5 and 0.6 g/cu m. Scale test conditions were established by the modified Ruff (AEDC) scaling method with the scale velocity determined in five ways. The resulting scale velocities ranged from 85 to 220 percent of the reference velocity. This paper presents the ice shapes that resulted from those scale tests and compares them to the reference shapes. It was concluded that for freezing fractions greater than 0.8 as well as for a freezing fraction of 0.3, the value of the scale velocity had no effect on how well the scale ice shape simulated the reference shape. For freezing fractions of 0.5 and 0.7, the simulation of the reference shape appeared to improve as the scale velocity increased.

Anderson, David N.↗

Effect of Velocity in Icing Scaling Tests

This paper presents additional results of a study first published in 1999 to determine the effect of scale velocity on scaled icing test results. Reference tests were made with a 53.3-cm-chord NACA 0012 airfoil model in the NASA Glenn Icing Research Tunnel at an airspeed of 67 m/s, an MVD of 40 microns, and an LWC of 0.6 g/cu m. Temperature was varied to provide nominal freezing fractions of 0.8, 0.6, and 0.5. Scale tests used both 35.6- and 27.7-cm-chord 0012 models for 2/3- and 1/2-size scaling. Scale test conditions were found using the modified Ruff (AEDC) scaling method with the scale velocity determined in five ways. Four of the scale velocities were found by matching the scale and reference values of water-film thickness, velocity, Weber number, and Reynolds number. The fifth scale velocity was simply the average of those found by matching the Weber and Reynolds numbers. The resulting scale velocities ranged from 85 to 220 percent of the reference velocity. For a freezing fraction of 0.8, the value of the scale velocity had no effect on how well the scale ice shape simulated the reference shape. For nominal freezing fractions of 0.5 and 0.6, the best simulation of the reference shape was achieved when the scale velocity was the average of the constant-Weber-number and the constant-Reynolds-number velocities.

Anderson, David N.↗

Managing Risks via Small/Pilot Scale Testing for INL's Integrated Waste Treatment Unit (IWTU) - 19268

In 2005, the THOR steam reforming fluidized-bed reactor (FBR) technology was selected by the U.S. Department of Energy (DOE) as the technology of choice for treatment of sodium- bearing waste (SBW) at the INL. The basis of the process was to use fluidized bed technology to convert an acidic radioactive nitrate-rich liquid waste into a solid carbonate product suitable for long-term disposal and storage. During initial commissioning, as well as subsequent start-ups, the plant faced many operational challenges, such as stagnant/de-fluidized bed, and wall-scale formation. Such operational issues prompted the original contractor to seek expertise in pilot-scale testing, thereby reaching out to Hazen Research Inc. (HRI, Golden, Co). Several tests were conducted, but the results did not seem to address the underlying issues observed in the full-scale plant, as evidenced by continued operational issues. A systematic approach was then taken by the Fluor-Idaho team (new contractor as of June 2016) with respect to solving these technical issues. First, two different bench-scale, 2-inch fluidized bed reactors (stainless-steal and quartz), were utilized to test several theories to better understand the underlying chemical reactions that may be taking place under expected normal operating conditions. Then, the team designed and built an 18-inch FBR unit, mimicking the full-scale main vessel at IWTU - Denitration Mineralization Reformer (DMR). This was used to test various aspects of operational challenges observed at IWTU, namely particle size control, wall-scale growth-rate control, long-term operational stability, process optimization, and process off- gas filtration challenges. An example of information obtained from bench-scale testing, which was then tested during pilot-scale testing, was the phenomena that an addition of 5 vol % of CO{sub 2} gas into the fluidizing gas system nearly eliminated the formation of agglomerates that had typically led to bed de-fluidization. This change proved to be correct in both the pilot and full-scale testing and will be implemented as part of a long-term operational strategy of IWTU. Several other findings that have provided answers with respect to IWTU operational issues will be discussed in this report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

After DART: Using the first full-scale test of a kinetic impactor to inform a future planetary defense mission

NASA’s Double Asteroid Redirection Test (DART) is the first full-scale test of an asteroid deflection technology. Results from the hypervelocity kinetic impact and Earth-based observations, coupled with LICIACube and the later Hera mission, will result in measurement of the momentum transfer efficiency accurate to ~10% and characterization of the Didymos binary system. But DART is a single experiment; how could these results be used in a future planetary defense necessity involving a different asteroid? We examine what aspects of Dimorphos’s response to kinetic impact will be constrained by DART results; how these constraints will help refine knowledge of the physical properties of asteroidal materials and predictive power of impact simulations; what information about a potential Earth impactor could be acquired before a deflection effort; and how design of a deflection mission should be informed by this understanding. We generalize the momentum enhancement factor β, showing that a particular direction-specific β will be directly determined by the DART results, and that a related direction-specific β is a figure of merit for a kinetic impact mission. The DART β determination constrains the ejecta momentum vector, which, with hydrodynamic simulations, constrains the physical properties of Dimorphos’s near-surface. In a hypothetical planetary defense exigency, extrapolating these constraints to a newly discovered asteroid will require Earth-based observations and benefit from in-situ reconnaissance. We show representative predictions for momentum transfer based on different levels of reconnaissance and discuss strategic targeting to optimize the deflection and reduce the risk of a counterproductive deflection in the wrong direction.

Asteroids↗

Development and Lab-Scale Testing of a Gas Generator Hybrid Fuel in Support of the Hydrogen Peroxide Hybrid Upper Stage Program

As part of a NASA funded contract to develop and demonstrate a gas generator cycle hybrid rocket motor for upper stage space motor applications, the development and demonstration of a low sensitivity, high performance fuel composition was undertaken. The ultimate goal of the development program was to demonstrate successful hybrid operation (start, stop, throttling) of the fuel with high concentration (90+%) hydrogen peroxide. The formulation development and lab-scale testing of a simple DOT Class 1.4c gas generator propellant is described. Both forward injected center perforated and aft injected end burner hybrid combustion behavior were evaluated with gaseous oxygen and catalytically decomposed 90% hydrogen peroxide. Cross flow and static environments were found to yield profoundly different combustion behaviors, which were further governed by binder type, oxidizer level and, significantly, oxidizer particle size. Primary extinguishment was accomplished via manipulation of PDL behavior and oxidizer turndown, which is enhanced with the hydrogen peroxide system. Laboratory scale combustor results compared very well with 11-inch and 24-inch sub-scale test results with 90% hydrogen peroxide.

Lund, Gary K.↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

The optimization of aircraft seat cushion fire-blocking layers. Full Scale: Test description and results

Full-scale burn tests were conducted on thirteen different seat cushion configurations in a cabin fire simulator. The fire source used was a quartz lamp radiant energy panel with a propane pilot flame. During each test, data were recorded for cushion temperatures, radiant heat flux, rate of weight loss of test specimens, and cabin temperatures. When compared to existing passenger aircraft seat cushions, the test specimens incorporating a fire barrier and those fabricated from advance materials, using improved construction methods, exhibited significantly greater fire resistance.

Schutter, K. J.↗

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System

This document presents and discusses results from Cooperative Agreement DE-FC26-06NT42778, 'Full-scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System,' which was conducted over the time-period July 24, 2006 through June 30, 2010. The objective of the project was to demonstrate at full scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in pulverized-coal-fired flue gas. Oxidized mercury is removed downstream in wet flue gas desulfurization (FGD) absorbers and collected with the byproducts from the FGD system. The project was co-funded by EPRI, the Lower Colorado River Authority (LCRA), who also provided the host site, Great River Energy, Johnson Matthey, Southern Company, Salt River Project (SRP), the Tennessee Valley Authority (TVA), NRG Energy, Ontario Power and Westar. URS Group was the prime contractor and also provided cofunding. The scope of this project included installing and testing a gold-based catalyst upstream of one full-scale wet FGD absorber module (about 200-MW scale) at LCRA's Fayette Power Project (FPP) Unit 3, which fires Powder River Basin coal. Installation of the catalyst involved modifying the ductwork upstream of one of three wet FGD absorbers on Unit 3, Absorber C. The FGD system uses limestone reagent, operates with forced sulfite oxidation, and normally runs with two FGD modules in service and one spare. The full-scale catalyst test was planned for 24 months to provide catalyst life data. Over the test period, data were collected on catalyst pressure drop, elemental mercury oxidation across the catalyst module, and mercury capture by the downstream wet FGD absorber. The demonstration period began on May 6, 2008 with plans for the catalyst to remain in service until May 5, 2010. However, because of continual increases in pressure drop across the catalyst and concerns that further increases would adversely affect Unit 3 operations, LCRA decided to end the demonstration early, during a planned unit outage. On October 2, 2009, Unit 3 was taken out of service for a fall outage and the catalyst upstream of Absorber C was removed. This ended the demonstration after approximately 17 months of the planned 24 months of operation. This report discusses reasons for the pressure drop increase and potential measures to mitigate such problems in any future application of this technology. Mercury oxidation and capture measurements were made on Unit 3 four times during the 17-month demonstration. Measurements were performed across the catalyst and Absorber C and 'baseline' measurements were performed across Absorber A or B, which did not have a catalyst upstream. Results are presented in the report from all four sets of measurements during the demonstration period. These results include elemental mercury oxidation across the catalyst, mercury capture across Absorber C downstream of the catalyst, baseline mercury capture across Absorber A or B, and mercury re-emissions across both absorbers in service. Also presented in the report are estimates of the average mercury control performance of the oxidation catalyst technology over the 17-month demonstration period and the resulting mercury control costs.

01 COAL, LIGNITE, AND PEAT↗

Validity of small scale tests for turret/fairing loads and cavity effects

Data from several wind tunnel experiments along with available flight test data are used to discuss the validity of small scale tests and their inherent limitations. Tests were performed at transonic speeds to measure the turbulence levels in a cavity with and without a forward porous fence, turret drag with and without an aerodynamic fairing, and turret/fairing unsteady pressures.

Mcdermott, D. J.↗

Low Activity Waste Pretreatment System Bench-Scale Testing: Supporting Integrated Testing and Facility Safety Analyses - 17171

The Low Activity Waste Pretreatment System (LAWPS) is being designed to enable the direct feed of waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to be immobilized. Prior to construction of the LAWPS, pilot-scale integrated testing of the key unit operations (crossflow filtration, ion exchange using spherical resorcinol-formaldehyde (sRF) resin) will be conducted by a team led by Washington River Protection Solutions (WRPS) to increase the technology maturation level of the facility’s critical technology elements. As a part of this effort, Pacific Northwest National Laboratory (PNNL) has conducted a series of bench-scale (or engineering-scale) tests to perform two major objectives: (1) support pilot-scale integrated testing of the LAWPS by supplying information or performance data in advance of operating the pilot-scale facility; and (2) collect data needed to establish or confirm assumptions/approaches planned for implementation in the LAWPS safety basis. The first objective was focused in two technical areas: developing simulants that are representative of expected waste feed and can be produced at larger scales, and using these simulants in a bench-scale crossflow filter to establish expected solid-liquid separation performance. The crossflow filter was also used to observe the efficacy (with respect to filter production rate) of selected operational strategies. The second objective also included two technical areas: measuring the effect of sRF resin on hydrogen generation rate under irradiation, and demonstrating that the planned hydrogen management approach is effective and robust. The hydrogen management strategy involves fluidization of the sRF resin bed in the ion exchange columns and recirculating the liquid, a scenario that is planned for testing at full column height. The full height tests at PNNL also supported full-scale IX column testing conducted as part of the technology maturation plan. The experimental approaches used at PNNL in these four technical areas are summarized and selected key preliminary results are provided.

cross flow filtration↗