Search NASA⌕ Search

SEARCH · Search NASA

Results for “site analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Hanford Site Composite Analysis: Dose Sensitivity Analyses

This environmental calculation file (ECF) documents the methodologies, assumptions, and results of five analyses that evaluate parameter changes to the revised Hanford Site Composite Analysis (CA) (DOE-RL-2019-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau). Specifically, this ECF describes the impact on total dose and analyte-specific doses for five sensitivity cases where changes to the following exposure-related parameters were implemented – (1) inventory, (2) recharge rate, (3) external dose conversion factors (DCFs) based on Federal Guidance Report (FGR) No. 15 in (EPA-402-R-19-002, Federal Guidance Report No. 15, External Exposure to Radionuclides in Air, Water, and Soil) instead of FGR No. 12 (EPA 402-R-93-081, Federal Guidance Report No. 12, External Exposure to Radionuclides in Air, Water, and Soil) for groundwater pathway scenario; (4) use of mean instead of 95th percentile intake assumptions for groundwater pathway scenario; and (5) consideration of limited sources based on U.S. Department of Energy (DOE) owned waste sites regulated under DOE O 435.1, Radioactive Waste Management. It should be noted that dose assessments for both base and sensitivity cases are based on the all-pathways representative person groundwater exposure scenario presented in DOE/RL-2022-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau.

54 ENVIRONMENTAL SCIENCES↗

Application of the Recharge Estimation Tool (RET) to Prepare Spatially and Temporally Variable Recharge Boundary Conditions for Hanford Site Composite Analysis Vadose Zone Models

This environmental calculation file (ECF) describes the development of a tool for translating recharge estimates into readable input for STOMP© (Subsurface Transport Over Multiple Phases) vadose zone models primarily supporting the vadose zone (VZ) facets of the updated Hanford Site Composite Analysis (CA) and the Hanford Site Cumulative Impact Evaluation (CIE). The recharge estimates are spatiotemporally variable and are produced by the Recharge Evolution Tool (RET) described in Hanford Site-wide Natural Recharge Boundary Condition for Groundwater Models (ECF-HANFORD-15-0019). Outputs from the RET are given in Esri’s™ feature class format with yearly estimates and associated metadata encapsulated in file geodatabase objects. For STOMP models, the translated output is a text file in the format of an input boundary condition card, consistent with STOMP software requirements. The text file contains assimilated spatiotemporal recharge estimates produced by the RET. The tool discussed in this document will be referred to as the “RET2STOMP” tool.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis: LLBG-200-W B Vadose Zone Model

The objectives of the vadose modeling for the updated Hanford Site Composite Analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates to the CA saturated zone model (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP 1 ) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the saturated zone model. The rates will be summed over the 100 by 100 m saturated zone model grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEEPEN Data Catalog for Magmatic Geothermal Systems in the United States

This data catalog contains information related to the Training Site Analysis for the Geothermica project "DE-risking Exploration of geothermal Plays in magmatic ENvironments (DEEPEN)." The DEEPEN project aims to reduce exploration risk for geothermal fluids in magmatic systems by developing improved an improved framework for interpretation of exploration data using the Play Fairway Analysis (PFA) methodology. The Training Site Analysis performed for DEEPEN leverages existing datasets to develop a customized PFA approach to exploration for multiple geothermal resource types in magmatic systems (conventional hydrothermal resources, supercritical fluid and superheated steam resources, and superhot EGS resources). This data catalog contains links to publicly available data files related to 8 training sites in the United States. US training sites are: the Cascades/Aleutians PFA project; the Hawaii PFA project, the Oregon Cascades PFA project, the Snake River Plain, Idaho PFA project, the Washington State PFA project, Newberry Volcano, Coso Geothermal Field, and the Geysers Geothermal field. This database contains an overview of these training sites, data sources, and links to publicly available exploration datasets. For the five PFA projects, details on exploration data related to PFA components (heat, fluid, permeability, sometimes seal) are provided, including a summary of data weighting methodologies.

15 GEOTHERMAL ENERGY↗

Savannah River Site Composite Analysis (FY2019 Annual Review)

The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar-Surface Closeup Stereoscopic Photography on the Sea of Tranquility (Apollo 11 Landing Site)

Analysis of returned lunar samples provides limited information about lunar geology. To obtain information about in-place lunar material, a closeup stereoscopic camera capable of photographing small-scale surface features was built and was used at the Apollo 11 landing site. Stereoscopic photographs were taken of surface areas relative to the lunar module, and the surfaces photographed were analyzed. The photographs are classified into five groups: soil disturbed by astronaut activities, generally undisturbed soil, loose aggregate surface material, crater bottoms with prominent glass deposits, and hard rock deposits. Glass deposits in the returned samples are described for comparison with the features observed in the photographs. The stereoscopic photographs were of outstanding quality and show the nature of lunar-surface material in detail. Lunar topography was reconstructed from the photographs with an analytical plotter. The photography results indicate that the closeup composition and genesis of lunar soil at the Apollo 11 landing site.

Greenwood, W. R.↗

Selection of Vadose Zone Flow and Transport Properties with Gravel Fraction Corrections for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This environmental calculation file (ECF) is a compilation of hydrologic and radiological/chemical properties to be used for the updated Hanford Site Composite Analysis (CA) and Cumulative Impact Evaluation (CIE) vadose zone (VZ) modeling. The CA will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1 Chg 1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. The CIE evaluates the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document). Due to the complexity and large number of waste sites in source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the VZ while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. Waste-site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways. Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the VZ to groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Flow and Transport Parameters Data Package for the Hanford Site Composite Analysis

This report provides a description of the basis for the development and implementation of a conceptual model for vadose zone flow and transport for the Hanford Site composite analysis (CA) groundwater pathway analysis. The parameterization for a numerical model is intimately linked to the conceptual model framework. This report describes the basis for the selection of hydraulic and transport parameters for the hydrostratigraphic units (HSUs) identified in the 200 East and 200 West Areas. The following three-step process was used to develop the hydraulic properties and transport parameters for the CA modeling: 1. Breakdown of existing database on hydraulic properties by HSUs 2. Constitutive model parameters for laboratory, core-scale hydraulic properties 3. Upscaling for macroscopic, field-scale flow, and transport parameters This document provides data and information on the following items: A brief description and technical basis for the conceptual model selected to represent vadose zone flow and transport for the CA modeling. Variation in sediment particle size distribution for representative sites in the 200 East and West Areas. A summary of effective (upscaled) moisture retention, and saturated and unsaturated hydraulic conductivity estimates for the HSUs in the 200 East and West Areas. A summary of effective transport parameters, including sediment bulk density and macrodispersivity estimates for various HSUs. The 200 East Area B Complex perched water aquifer hydraulic properties

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis Special Analysis: P2R Model Predictive Contaminant Transport Simulations - Sensitivity Case

This environmental calculation file (ECF) documents the methodologies, assumptions, and results of predictive fate and transport simulations using the Plateau-to-River (P2R) model. This ECF supports the reevaluation of the representativeness of solid-waste radionuclide inventory and release rate from three solid waste sites included in the recently completed Hanford Site Composite Analysis (CA) (DOE-RL-2019-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020)). Specifically, this ECF supports the reevaluation of the representativeness of the base case inventory and radionuclide waste release rates from three solid waste sites (i.e., 218-E-12B, 218-W-3A and 218-W-3AE) and two radionuclides (carbon-14 [C-14] and technetium [Tc-99]). These three waste sites and two radionuclides were identified as being the most significant contributors to groundwater contamination and dose in the CA at time periods after the compliance period. The release rates and footprints of the releases from the vadose zone are implemented in the fate and transport modeling utilizing the HSS package.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Site Composite Analysis Data Package: Exposure Scenarios and Radionuclide Specific Dose Conversion Factors.

This data package summarizes the exposure assumptions, equations, and methods used to calculate radionuclide-specific unit dose factors and the radiological doses for both groundwater and atmospheric pathways as a part of the revised Hanford Site Composite Analysis. An All-Pathways Representative Person exposure scenario is considered to evaluate exposure via both groundwater and atmospheric transport pathways. The radiological dose assessments for both groundwater and atmospheric pathways are included in the performance assessments for various Waste Management Areas at the Hanford Site. This data package calculates exposure route-specific and total unit dose factors for composite-analysis-specific radionuclides of concern based on the exposure assumptions used in the composite analysis and performance assessments. This data package presents the results and comparison of the radionuclide-specific unit dose factors based on the exposure assumptions used in the revised composite analysis and various performance assessments.

61 RADIATION PROTECTION AND DOSIMETRY↗

Calculation of Groundwater Pathway Radiological Dose for the Hanford Site Composite Analysis Base Case

The purpose of this environmental calculation file (ECF) is to present the results of the exposure route-specific and total radiological dose assessments for the groundwater exposure pathway as a part of the updated Hanford Site Composite Analysis (CA). The purpose of these radiological dose assessments is to provide an estimate of the cumulative radiological impacts from all screened sources of ionizing radiation and exposure routes that could potentially contribute to the projected dose to a hypothetical member of the public from both existing or future disposal facilities and other sources including past-practice discharge sites.

61 RADIATION PROTECTION AND DOSIMETRY↗

FY2020 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit). Proposed activities, discoveries, new information and changes potentially affecting the 2010 SRS CA are documented in this and earlier Annual Summary reports, and a consolidated list of changes since the 2010 CA is documented in this report. The impact to the CA of changes arising from updated performance assessment (PA) baselines [i.e., Saltstone Disposal Facility (SDF), E-Area Low-Level Waste Facility (ELLWF), and F & H Tank Farm (FTF & HTF) closures] is expected to be minor for the following reasons: The primary contributors to the SRS CA dose impact at the Upper Three Runs (UTR) point of assessment (POA) are the H-Canyon and Mixed Waste Management Facility (MWMF), contributing 68% and 9%, respectively, to the dose impact at that POA. The combined contribution to the UTR dose impact from all PA’s (SDF, ELLWF, FTF and HTF) is ~2% of this total. The 2010 SRS CA model validation performed indicates that the CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. Doses evaluated are well below the SRS established 15 mrem/yr administrative limit (Crapse et al. 2011). Based on the assessment presented within this annual review and collective engineering judgement, the conclusions of the 2010 SRS CA remain valid and there is reasonable assurance that SRS will meet the performance objectives delineated in DOE Manual 435.1-1. The 2010 SRS CA should be updated to incorporate PA changes, proposed changes to inventories and sources and model improvements accumulated since the 2010 CA. The timing will be dependent on the completion of the ongoing E-Area PA revision.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2021 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis: Comparison of One- and Three-Dimensional Simulation of Vadose Zone Transport and Transfer to Groundwater for Selected Waste Sites

The purpose of this document is to compare 1D and 3D technetium-99 (Tc-99) VZ transport and transfer rates to groundwater for five selected waste sites (two tanks, two cribs, and one trench) to demonstrate the need to consider 3D flow and transport mechanisms and commingling of contaminant plumes originating from adjacent waste sites. The waste sites selected for the comparison evaluation are the 241-A-105 Tank in the A Farms Area model, the 216-B-18 Crib and the 216-B-25 Trench in the BC Cribs and Trenches model, the 216-B-49 Crib in the B Complex model, and the 241-SX-115 Tank in the S Farms Area model. The selected waste sites all represent different disposal or leak conditions, with and without potential impacts due to release-fluid commingling, occurring at the Hanford Site Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Surface Landing Site Weather Analysis for Constellation Program

Weather information is an important asset for NASA's Constellation Program in developing the next generation space transportation system to fly to the International Space Station, the Moon and, eventually, to Mars. Weather conditions can affect vehicle safety and performance during multiple mission phases ranging from pre-launch ground processing to landing and recovery operations, including all potential abort scenarios. Meteorological analysis is an important contributor, not only to the development and verification of system design requirements but also to mission planning and active ground operations. Of particular interest are the surface atmospheric conditions at both nominal and abort landing sites for the manned Orion capsule. Weather parameters such as wind, rain, and fog all play critical roles in the safe landing of the vehicle and subsequent crew and vehicle recovery. The Marshall Space Flight Center Natural Environments Branch has been tasked by the Constellation Program with defining the natural environments at potential landing zones. Climatological time series of operational surface weather observations are used to calculate probabilities of occurrence of various sets of hypothetical vehicle constraint thresholds, Data are available for numerous geographical locations such that statistical analysis can be performed for single sites as well as multiple-site network configurations. Results provide statistical descriptions of how often certain weather conditions are observed at the site(s) and the percentage that specified criteria thresholds are matched or exceeded. Outputs are tabulated by month and hour of day to show both seasonal and diurnal variation. This paper will describe the methodology used for data collection and quality control, detail the types of analyses performed, and provide a sample of the results that can be obtained,

Altino, Karen M.↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗