Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Responses to Deficiencies, AIHA Remote Site Assessment, September 9-10, 2020

Responses to the deficiencies found by Keith Nicholson during the American Industrial Hygiene Association external site assessment carried out remotely on September 9-10, 2020 in the Analytical Services and Instrumentation Division Analytical Laboratory (Lab ID101757).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

A Framework for Parametric and Predictive Uncertainty Quantification in the E3SM Land Model: Assessing Site and Observable Generalizability

Quantifying parametric uncertainty using observations from individual sites provides a critical foundation for Earth system modeling, serving as a necessary first step before scaling up to regional or global applications. This study introduces a novel computational framework designed to enhance model predictability by reducing parametric uncertainty and assessing site and observable generalizability using various observational constraints. The framework integrates five components: Model Simulation, Statistical Emulation, Global Sensitivity Analysis (GSA), Model Calibration, and Model Prediction. Using the E3SM land model, we simulated site-level land-atmosphere carbon and energy fluxes from 2003 to 2007 across five evergreen needleleaf FLUXNET sites, perturbing 26 vegetation-related model parameters. Gaussian process emulators were employed to expedite GSA and model calibration. Four critical parameters that strongly influence selected land-atmosphere fluxes were identified by GSA. Bayesian approaches were used to infer parameter probability distributions leveraging synthetic data and FLUXNET observations. The results reveal that posterior parameter distributions vary significantly across different sites and observables within the same plant functional type. Probabilistic predictions indicate that parameters calibrated at one site can enhance predictive accuracy at other sites, although site heterogeneity may sometimes outweigh parametric uncertainty. Additionally, the probabilistic predictions demonstrate that calibration for one variable can also improve predictability for other variables, thereby maximizing predictive capabilities with limited observations. This framework provides a powerful approach for reducing parametric uncertainty in Earth system models and deepening our understanding of carbon dynamics and energy cycles. Its adaptability makes it a valuable tool for broader applications in Earth system modeling.

54 ENVIRONMENTAL SCIENCES↗

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT↗

GSSR Mars Delay-Doppler Data Available for MER Landing Site Assessment

Goldstone Solar System Radar (GSSR) observation of Mars made over the past 10 years are tabulated. Some of these are two station interferometric data that can now be processed using Mars Orbiter Laser Altimeter (MOLA) aided altimetry to provide North/South separation and higher resolution. New 2001 observations are targeted at Mars Exploration Rover (MER) sites. Additional information is contained in the original extended abstract.

Jurgens, R. F.↗

Golden Gate National Recreation Area Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Golden Gate National Recreation Area, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Grand Teton National Park Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Grand Teton National Park (GRTE) that can ultimately be incorporated into the overall Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Yellowstone National Park Federal Fleet Tiger Team EVSE Site Assessment [Slides]

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for Yellowstone National Park, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Multi-site assessment of the potential of fine resolution red-edge vegetation indices for estimating gross primary production

Gross primary production (GPP) models driven by fine resolution remote sensing data characterize the spatial and temporal heterogeneities in plant photosynthesis, which is largely dependent on biome-specific maximum photosynthetic capacity. The red-edge reflectance, sensitive to leaf chlorophyll content, is a good proxy of maximum photosynthetic capacity. More importantly, studies show that the red-edge reflectance-related chlorophyll content index (CIr) multiplied by the incident photosynthetic active radiation (PAR in ) strongly correlates to GPP estimated at carbon flux towers (GPP flux ). Yet, to the best of our knowledge, there is no systematic study investigating the general relationship between fine spatial resolution CIr and GPP among biomes and the relationship between CIr and maximum photosynthetic capacity in GPP models. To provide an overview on incorporating space-borne CIr into a GPP model, we applied fine resolution Sentinel-2-derived CIr and GPP flux over 57 flux sites representative of 10 biomes. We investigated the relationship between CIr and GPP flux , and the spatio-temporal relationship between CIr and ecosystem maximum photosynthetic capacity indicated by the potential ecosystem light use efficiency (LUE pot ). We also evaluated the relationship between other five vegetation indices (VIs) and GPP flux . Results showed that the CIr multiplied by PARin has a higher agreement (R 2 > 0.5) with GPP than other VIs. A universal relationship exists between the CIr multiplied by PARin and GPP, except for forest biomes. The CIr also strongly (R 2 > 0.5) relates to the LUE pot during the peak of the growing season. The CIr has a low spatial variance (CV = 0.25) among biomes, highlighting that CIr can be a proxy of maximum photosynthetic capacity in GPP models that do not require biome-dependent coefficients. This study provides insight for incorporating CIr into GPP models and better quantifying global terrestrial photosynthesis.

59 BASIC BIOLOGICAL SCIENCES↗

Pre-drilling Site Assessment: One Earth Energy

The Illinois Storage Corridor project will drill a test well in Ford County, IL, near the One Earth Energy facility in Gibson City, IL. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility of the geologic sequestration of 50 million tonnes or more of injected carbon dioxide at this location. The primary target reservoir and caprock to be investigated for the Illinois Storage Corridor project are the Mt. Simon Sandstone and Eau Claire Formation, respectively, which together constitute a storage complex that has already been successfully used for natural gas storage in east-central Illinois and for geologic sequestration of carbon dioxide in south-central Illinois. The Lower Mt. Simon, which includes a high- porosity and -permeability arkosic layer, is being targeted as the primary storage zone. Regional maps of this unit indicate that the Lower Mt. Simon is expected to have excellent reservoir characteristics and high net thickness at the drill site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Building Capacity: Solar Photovoltaics Site Assessment and Feasibility Study

While Bhutan is abundant with clean energy hydropower, there are dry months in winter when solar energy could reduce expensive power inputs and bolster Bhutan's energy resilience and independence. As the country explores solar photovoltaic (PV) development as an option to achieve that goal, grid planners and renewable energy experts are partnering with the South Asia Group for Energy (SAGE) to determine the benefits and challenges of building solar energy systems in Bhutan.

14 SOLAR ENERGY↗

Robotic Subsurface Analyzer and Sample Handler for Resource Reconnaissance and Preliminary Site Assessment for ISRU Activities at the Lunar Cold Traps

Since the 1960s, claims have been made that water ice deposits should exist in permanently shadowed craters near both lunar poles. Recent interpretations of data from the Lunar Prospector-Neutron Spectrometer (LP- NS) confirm that significant concentrations of hydrogen exist, probably in the form of water ice, in the permanently shadowed polar cold traps. Yet, due to the large spatial resolution (45-60 Ian) of the LP-NS measurements relative to these shadowed craters (approx.5-25 km), these data offer little certainty regarding the precise location, form or distribution of these deposits. Even less is known about how such deposits of water ice might effect lunar regolith physical properties relevant to mining, excavation, water extraction and construction. These uncertainties will need to be addressed in order to validate fundamental lunar In Situ Resource Utilization (ISRU) precepts by 2011. Given the importance of the in situ utilization of water and other resources to the future of space exploration a need arises for the advanced deployment of a robotic and reconfigurable system for physical properties and resource reconnaissance. Based on a collection of high-TRL. designs, the Subsurface Analyzer and Sample Handler (SASH) addresses these needs, particularly determining the location and form of water ice and the physical properties of regolith. SASH would be capable of: (1) subsurface access via drilling, on the order of 3-10 meters into both competent targets (ice, rock) and regolith, (2) down-hole analysis through drill string embedded instrumentation and sensors (Neutron Spectrometer and Microscopic Imager), enabling water ice identification and physical properties measurements; (3) core and unconsolidated sample acquisition from rock and regolith; (4) sample handling and processing, with minimized contamination, sample containerization and delivery to a modular instrument payload. This system would be designed with three mission enabling goals, including: (1) a self-contained, low power, low mass, "black box'' configuration for operations from a lander, various classes of rovers or a surface-based platform with human assistance or robotic anchoring mechanisms; (2) reconfigurable and scalable sample handling for delivery to various types of instrumentation, depending on mission requirements; and (3) the use of advanced automation control and diagnostic techniques that will afford local human deployed, remote teleoperation and fully autonomous intelligent operations. Though a great deal of technology has been advanced toward these objectives, the SASH system faces significant design challenges, including the low gravity environment, various levels of autonomy in operations, radiation exposure, dust contamination, and temperature extremes and deltas. Significant input from the scientific and engineering communities, as well as a significant environmental testing program, will be required to guide the design process.

Gorevan, S. P.↗