Mapping Marijuana Probability Grow Sites: An Operational System Law Enforcement Tool
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The Telerobotic Ground-Remote Operations task consists of development of a demonstration local-site operator control station that includes a graphical user interface (GUI) for control of a remote robot, and development of operator-assisted perception algorithms and software that will provide flexible and accurate world modeling capabilities. The topics covered are presented in view graph form and include: (1) local site development configuration; (2) system design; (3) operator control station (local site) software block diagram; (4) operator-assisted perception; and (5) program status.
The study proposes a ground-remote telerobot control architecture which could be used for control of Space Station Freedom manipulators. The architecture provides two local-site operator control stations representing potential earth-based and remote Space Station-based operator control stations. A unified control system at the remote site provides autonomous, shared, and teleoperation control for single-and dual-arm task execution. An operational laboratory system which demonstrates the feasibility of various technologies in the proposed architecture, including teleoperation, shared control, and supervised autonomy, is described. Enhancements to the system currently under development, including remote site implementation in Ada, integration and control of a redundant 7-DOF manipulator, and local site advanced operator aids, are also described.
The configuration and operation of the LOX loading facilities to be used for the space shuttle main propulsion test article at the National Space and Technology Laboratories (NSTL), and for the space shuttle launch facilities at John F. Kennedy Space Center (KSC) was investigated. The acceptability of these LOX loading facilities for each application was determined along with the degree of similarity between the systems with respect to the applicability of data developed during operations at NSTL a to the launch site operations at KSC. Results are summarized and final data comparisons, conclusions, and recommendations are presented.
A telerobotics system is described which provides supervised autonomous control capability for time-delayed ground-remote control applications. The system includes a local site operator interface for interactive task description and a remote site task execution system. Interactive stereo graphics overlay on video is provided at the local site to update the remote environmental model. The remote site system is capable of nominal task execution as well as monitoring and reflex action. Execution utilizes multiple control modules which execute based upon command parameterization.
Just within the next four years, we expect to see at least 22 lunar surface missions. Half of these missions will occur in the Moon’s south polar region. Due to this upcoming proliferation of actors and activities at or near the lunar south pole, and due to the potential close proximity of operations, NASA and other operators will face challenges never faced before. NASA’s Deputy Administrator and Associate Administrator of the Science Mission Directorate (SMD) tasked the Office of Technology, Policy, and Strategy (OTPS) with answering two questions related to the Artemis campaign: (1) what technical and policy considerations should NASA take into account in the selection of lunar landing and operations sites, and (2) what technical and policy considerations should NASA take into account when implementing tools such as safety zones in order to protect these operations and U.S. interests? In addition to the challenges inherent in lunar operations, NASA subject-matter experts (SMEs) are concerned about certain challenges to NASA operations that may require policy solutions. The goal of this report is to provide options and recommendations to NASA leadership and program planners so that they can consider policy measures to respond to those challenges. This report also describes options for transparency, coordination, and implementation to increase the effectiveness of these measures.
At least 22 lunar missions are planned in the next four years. Half of these missions will occur in the Moon’s south polar region. Due to this upcoming proliferation of actors and activities at or near the lunar south pole, and due to the potential close proximity of operations, NASA and other operators will face challenges never faced before. NASA’s Deputy Administrator and Associate Administrator of the Science Mission Directorate tasked the Office of Technology, Policy, and Strategy with answering two questions related to the Artemis campaign: (1) what technical and policy considerations should NASA take into account in the selection of lunar landing and operations sites, and (2) what technical and policy considerations should NASA take into account when implementing tools such as safety zones in order to protect these operations and U.S. interests? We present policy tools (options and recommendations) to NASA leadership and program planners so that they can consider policy measures to respond to challenges inherent in landing and operating at the lunar South Pole—this answers question one. We also describe a set of options (transparency, coordination, and implementation) to increase the effectiveness of these tools—this answers question two.
The micro-pulse lidar system (MPL) was developed in the early 1990s and was the first small, eye-safe, and autonomous lidar built for full time monitoring of cloud and aerosol vertical distributions. In 2000, a new project using MPL systems was started at NASA Goddard Space Flight Center. This new project, the Micro-pulse Lidar Network or MPL-Net, was created to provide long-term observations of aerosol and cloud vertical profiles at key sites around the world. This is accomplished using both NASA operated sites and partnerships with other organizations owning MPL systems. The MPL-Net sites are co-located with NASA AERONET sunphotometers to provide aerosol optical depth data needed for calibration of the MPL. In addition to the long-term sites, MPL-Net provides lidar support for a limited number of field experiments and ocean cruises each year. We will present an overview of the MPL-Net project and show initial results from the first two MPL-Net sites at the South Pole and at Goddard Space Flight Center. Observations of dust layers transported from the Gobi desert, across the Pacific Ocean, to the east coast of the United States will also be shown. MPL-Net affiliated instruments were in place at the desert source region in China, on a research vessel in the Sea of Japan, at ARM sites in Alaska and Oklahoma, and finally at our home site in Maryland (GSFC) during the massive dust storms that occurred in April 2001. The MPL observations of dust layers at each location are shown in comparison to dust layers predicted using the Georgia Tech/Goddard Global Ozone Chemistry Aerosol Radiation and Transport model (GOCART). Finally, the MPL-Net project is the primary ground-validation program for the Geo-Science Laser Altimeter System (GLAS) satellite lidar project (launch date 2002). We will present an overview demonstrating how MPL-Net results are used to help prepare the GLAS data processing algorithms and assist in the calibration/validation of the GLAS data products.
The parabolic dish test site (PDTS) was established for testing point-focusing solar concentrator systems operating at temperatures approaching 1650 C. Among tests run were evaluation and performance characterization of parabolic dish concentrators, receivers, power conversion units, and solar/fossil-fuel hybrid systems. The PDTS was fully operational until its closure in June, 1984. The evolution of the test program, a chronological listing of the experiments run, and data summaries for most of the tests conducted are presented.
To statistically characterize atmospheric effects on Ka-band links at NASA operational sites, NASA has constructed site test interferometers (STI s) which directly measure the tropospheric phase stability and rain attenuation. These instruments observe an unmodulated beacon signal broadcast from a geostationary satellite (e.g., Anik F2) and measure the phase difference between the signals received by the two antennas and its signal attenuation. Three STI s have been deployed so far: the first one at the NASA Deep Space Network Tracking Complex in Goldstone, California (May 2007); the second at the NASA White Sands Complex, in Las Cruses, New Mexico (February 2009); and the third at the NASA Tracking and Data Relay Satellite (TDRS) Remote Ground Terminal (GRGT) complex in Guam (May 2010). Two station-years of simultaneous atmospheric phase fluctuation data have been collected at Goldstone and White Sands, while one year of data has been collected in Guam. With identical instruments operating simultaneously, we can directly compare the phase stability and rain attenuation at the three sites. Phase stability is analyzed statistically in terms of the root-mean-square (rms) of the tropospheric induced time delay fluctuations over 10 minute blocks. For two years, the time delay fluctuations at the DSN site in Goldstone, CA, have been better than 2.5 picoseconds (ps) for 90% of the time (with reference to zenith), meanwhile at the White Sands, New Mexico site, the time delay fluctuations have been better than 2.2 ps with reference to zenith) for 90% of time. For Guam, the time delay fluctuations have been better than 12 ps (reference to zenith) at 90% of the time, the higher fluctuations are as expected from a high humidity tropical rain zone. This type of data analysis, as well as many other site quality characteristics (e.g., rain attenuation, infrastructure, etc.) will be used to determine the suitability of all the sites for NASA s future communication services at Ka-band.
A final report on the Operationally Efficient Propulsion System Study (OEPSS) is presented. A review of Launch Site Operations, OEPSS objectives, operations support structure, OEPSS Concerns List, and scope of OEPSS are summarized, along with goals of OEPSS technologies, and operations technology levels. Air-augmented ejector/rocket, flash boiling tank pressurization technology, and advanced LH2 turbopump are described. Launch facilities, operations-driven propulsion system architecture, integrated booster propulsion module, turbopump operating conditions, and payload capability using integrated engine elements are addressed among other topics.
In order to statistically characterize the effect of the Earth's atmosphere on Ka-Band links, site test interferometers (STIs) have been deployed at three of NASA s operational sites to directly measure each site's tropospheric phase stability and rain attenuation. These STIs are composed of two antennas on a short baseline (less than 1km) that observe the same unmodulated beacon signal broadcast from a geostationary satellite (e.g., Anik F2). The STIs are used to measure the differential phase between the two received signals as well as the individual signal attenuation at each terminal. There are currently three NASA sites utilizing STIs; the Goldstone Deep Space Communications Complex near Barstow, California; the White Sands Complex in Las Cruces, New Mexico; and the Guam Remote Ground Terminal on the island of Guam. The first two sites are both located in desert regions that have highly similar climates in terms of their seasonal temperatures, average humidity, and annual rain fall (the primary factors in determining phase stability). In contrast, Guam is in a tropical region with drastically higher annual rainfall and humidity. Five station years of data have been collected in Goldstone, three in White Sands, and two in Guam, yielding two years of simultaneous data collection across all three sites. During this period of simultaneous data collection, the root-mean-square (RMS) of the time delay fluctuations stayed under 2.40 picoseconds for 90% of the time in Goldstone, under 2.07 picoseconds for 90% of the time in White Sands, and under 10.13 picoseconds for 90% of the time in Guam. For the 99th percentile, the statistics were 6.32 ps, 6.03 ps, and 24.85 ps, respectively. These values, as well as various other site quality characteristics, will be used to determine the suitability of these sites for NASA s future communication services at Ka-Band.
As spacecraft communication links are driven to higher frequencies (e.g. Ka-band) both by spectrum congestion and the appeal of higher data rates, the propagation phenomena at these frequencies must be well characterized for effective system design. In particular, the phase stability of a site at a given frequency will govern whether or not the site is a practical location for an antenna array, particularly if uplink capabilities are desired. Propagation studies to characterize such phenomena must be done on a site-by-site basis due to the wide variety of climates and weather conditions at each ground terminal. Accordingly, in order to statistically characterize the atmospheric effects on Ka-Band links, site test interferometers (STIs) have been deployed at three of NASA's operational sites to directly measure each site's tropospheric phase stability. Using three years of results from these experiments, this paper will statistically characterize the simultaneous atmospheric phase noise measurements recorded by the STIs deployed at the following ground station sites: the Goldstone Deep Space Communications Complex near Barstow, CA; the White Sands Ground Terminal near Las Cruces, NM; and the Guam Remote Ground Terminal on the island of Guam.
Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.
The objective of the Advanced Telerobotics System Technology Task is to develop/prototype advanced telerobotics supervisory and shared control to enhance Intra-Vehicular Activity (IVA) teleoperation in the Space Station. The technology provides enhanced telerobotics capabilities while operating within the expected constraints of computation limitations, time delay, and bus bandwidth. A local site operator interface has also been developed for specifying teleoperation and shared control modes as well as supervised autonomous macros for execution at the remote site. The primary objective of the task is to transfer the advanced technology to appropriate flight centers to enhance the baseline Station capabilities.
SHADOZ aims to support the study of local and global patterns in stratospheric and tropospheric ozone and to provide a data set for the validation for satellite products and model calculations of ozone. Southern hemispheric tropical ozone is of particular interest because this region appears to have complex interplay among photochemical ozone formation (from biomass burning and lightning), stratospheric dynamics, convection and possibly cross-hemispheric transport. Balloon-borne ozone instrumentation (ozonesondes), joined with standard radiosondes for measurement of pressure, temperature and relative humidity, is used to collect profiles throughout the troposphere and lower- to mid-stratosphere. A network of 10 southern hemisphere tropical and subtropical stations, called the Southern Hemisphere ADditional OZonesondes (SHADOZ) project, has been established from operational sites to assemble sonde data for 1998-2000. A status report on the archive, with station operating characteristics, will be given, along with some operational issues that may affect data analysis and interpretation.
NASA, the FAA, the Department of Defense, the National Center for Atmospheric Research and NOAA are developing techniques for retrieving cloud microphysical properties from a variety of remote sensing technologies. The intent is to predict aircraft icing conditions ahead of aircraft. The Mount Washington Icing Sensors Project MWISP), conducted in April, 1999 at Mt. Washington, NH, was organized to evaluate technologies for the prediction of icing conditions ahead of aircraft in a natural environment, and to characterize icing cloud and drizzle environments. April was selected for operations because the Summit is typically in cloud, generally has frequent freezing precipitation in spring, and the clouds have high liquid water contents. Remote sensing equipment, consisting of radars, radiometers and a lidar, was placed at the base of the mountain, and probes measuring cloud particles, and a radiometer, were operated from the Summit. NASA s Twin Otter research aircraft also conducted six missions over the site. Operations spanned the entire month of April, which was dominated by wrap-around moisture from a low pressure center stalled off the coast of Labrador providing persistent upslope clouds with relatively high liquid water contents and mixed phase conditions. Preliminary assessments indicate excellent results from the lidar, radar polarimetry, radiosondes and summit and aircraft measurements.
While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge becomes how can a launch site provide acceptably responsive mission services to a particular customer without dedicating extensive resources and while continuing to serve other projects? NASA's Wallops Flight Facility (WFF) is pursuing solutions to exactly this challenge. NASA, in partnership with the Virginia Commercial Space Flight Authority, has initiated the Rapid Response Range Operations Initiative (R3Ops). R3Ops is a multi-phased effort to incrementally establish and demonstrate increasingly responsive launch operations, with an ultimate goal of providing ELV-class services in a maximum of 7-10 days from initial notification routinely, and shorter schedules possible with committed resources. This target will be pursued within the reality of simultaneous concurrent programs, and ideally, largely independent of specialized flight system configurations. WFF has recently completed Phase 1 of R3Ops, an in-depth collection (through extensive expert interviews) and software modeling of individual steps by various range disciplines. This modeling is now being used to identify existing inefficiencies in current procedures, to identify bottlenecks, and show interdependencies. Existing practices are being tracked to provide a baseline to benchmark against as new procedures are implemented. This paper will describe in detail the philosophies behind WFF's R3Ops, the data collected and modeled in Phase 1, and strategies for meeting responsive launch requirements in a multi-user range environment planned for subsequent phases of this initiative.