Search NASA⌕ Search

SEARCH · Search NASA

Results for “siting considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Atlantic Offshore Wind Transmission Study

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Atlantic Offshore Wind Transmission Study: Executive Summary

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Estimation Methodology to Evaluate Hypothetical Downwind Impacts from Fusion Plants

The continuing move toward establishing fusion systems for power generation and the associated research to that end is prompting examination of the potential health and safety impacts of such plants to the environment and human health. As many fusion facilities will have tritium inventories on site as part of the fusion fuel, evaluating the potential for downwind impacts from fusion facilities or power plants resulting from accident or routine emissions is a general requirement for assessing location and impacts to workers and the public. As part of siting considerations and permitting, the fusion facilities would be evaluated for potential for downwind concentration and dose impacts. For accident assessment scenarios, the downwind impacts are usually modeled as an instantaneous (or near-instantaneous) release of material transported following the wind. A range of meteorological conditions are usually assessed to determine a bounding case which results in a dose exceeding a specified threshold (e.g., 95 th or 99 th percentile; DOE 2015). This report provides initial estimates of the downwind dose impacts from a potential tritium release at a fusion power plant-relevant facility and identifies potential distances required to limit impacts to nearby population. This effort is meant to provide a bounding analysis and theoretical understanding of impacts of tritium releases for facilities subject to various environmental and atmospheric conditions. Using a Gaussian dispersion model to simulate a brief plume, downwind concentration and dose is projected for tritium oxide. Releases are assumed to consist entirely of tritium oxide due to the increased dose impacts from the oxide form relative to the elemental form of tritium. We also briefly identify how climatological conditions could potentially be used to support risk profile determination.

54 ENVIRONMENTAL SCIENCES↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

Project-specific considerations for retrofitting carbon capture technology to power generating and industrial facilities

The National Energy Technology Laboratory (NETL) has previously reported on learnings from 7 FEED studies examining retrofitting power plants with capture. This presentation builds on this effort by highlighting learnings from 3 additional FEED studies examining retrofitting power plants with capture and 7 FEED and pre-FEED studies examining retrofitting industrial plants with capture. This includes a discussion of the design, performance, and cost implications associated with (1) site-specific considerations such as water availability, land availability, and site accessibility, and (2) host-plant-specific factors such as flue gas specifications, operational mode, and allowable degree of integration between the capture system and host plant.

FEED Studies↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Modeling neutral defects in III-V ternary alloys with a special quasirandom structure: Analysis of As- and III-site point defects in InGaAs

While first-principles density functional theory modeling has become a vital tool to investigate defect properties in semiconductors, the lack of crystalline periodicity in pseudobinary random composition alloys, such as In 1−𝑥 ⁢Ga 𝑥 ⁢As, complicates such analyses. We present a simulation strategy to systematically take into account the variability in the local defect environment in order to predict statistical properties of neutral intrinsic defects in In 1−𝑥⁢ Ga 𝑥 ⁢As. We use a comprehensive sampling from a modest-sized 64-atom special quasirandom structure (SQS) to define a statistically representative set of defects, and use a 512-atom hypercell, a 2 × 2 × 2 supercell of SQS supercells, to achieve cell-size convergence. We articulate an equivalent site principle and describe how it constrains atomic chemical reference energies in computation of defect formation energies in pseudobinary alloys. A simple protocol for estimating reference energies for the Ga and In atoms sharing the III site succeeds in obtaining the equivalence of defects at Ga-sites and In sites in the SQS supercell, (<30 meV differences in average formation energies). For III-site defects, such as the As antisite As III , the statistical variability in formation energies is modest, ≈ 0.1–0.2 eV. The variability in formation energy at As-site defects, such as the As vacancy 𝑣 As , can be much larger, >1 eV. The As antisite is shown to be a low-energy defect and the most likely to be present in as-grown materials, just as in GaAs. All other defects are higher-energy defects unlikely to be important in native material, but potentially important in radiation-damaged material. With a strong variability in defect energies, especially on the As-site, explicit consideration of statistical variability due to compositional randomness will be imperative for meaningful and quantitative comparisons to experiment.

Density functional theory↗

Sea-Ice Effects on the Alaskan Wave Climate

This study investigates the uncertainty of wave resource assessments due to sea ice in the nearshore region of Alaska using an innovative approach of combining remotely sensed data and a third-generation phase-averaged wave model. Modeling analysis focused on winter months, when high wave energy is present along with sea ice. This study includes recommendations to improve the accuracy of wave resource assessments and optimize marine and hydrokinetic device siting with consideration of sea-ice effects. Additional recommendations, based on preliminary sea-ice information in Cook Inlet, Alaska, are provided for a trajectory analysis of drifting sea ice and a collision risk assessment of sea ice and tidal turbines. The outcome of this project will provide valuable information about the level of sea-ice impact on the accuracy of wave resource assessments in the Alaska nearshore region, and of sea-ice collision risk with MHK devices and ocean observation systems during winter months when sea ice is present.

16 TIDAL AND WAVE POWER↗

Community Resilience Options: A Menu for Enhancing Local Energy Resilience

This document highlights areas of potential community resilience improvements, especially those that relate to clean energy deployment for communities and municipalities. The National Renewable Energy Laboratory (NREL) defines resilience as "a system's ability to anticipate, prepare for, and adapt to changing conditions and withstand, respond to, and recover rapidly from disruptions through sustainable, adaptable, and holistic planning and technical solutions." This document introduces 10 categories of resilience-enhancing projects at a high level, intended for community members and decision-makers new to the topic to build their understanding of which solutions fit their community best. These categories focus primarily on community-scale measures and different options may be available at larger scales. Full implementation of the measures described here requires in-depth, site-specific considerations that go beyond the scope of this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

BayoTech Risk and Modeling Support of NM Gas Site

The BayoTech hydrogen generation system has been evaluated in terms of safety considerations at the NM Gas site. The consequence of a leak in different components in the system was evaluated in terms of plume dispersion and overpressure. Additionally, the likelihood of a leak scenario for different hydrogen components was identified. The worst-case plume dispersion cases, full-bore leaks, resulted in relatively large plumes. However, these cases were noted to be far less likely than the partial break cases that were evaluated. The partial break cases resulted in nearly negligible plume lengths. Similarly, the overpressure analysis of the full-bore break scenarios resulted in much larger overpressures than the partial break cases (which resulted in negligible overpressure at the lot line). There were several cases evaluated in the analysis that represented leak scenarios from both hydrogen and natural gas sources. Generally, the natural gas leak scenarios resulted in a smaller horizontal impact than that of hydrogen leaks. The worst-case consequence from a hydrogen leak resulted from the compressors, storage pods, or dispensing system. To consider the safety features that may isolate the leak, the consequence was evaluated at different times after the leak event to show the reduction of pressure. After 2 seconds, the plume dispersion from this event is contained within the perimeter of the site. The worst-case consequences show that the plume may disperse to adjacent facilities and to the street. When considering both likelihood and consequence, the risk may be considered low because the maximum frequency of a full-bore leak from any component within the hydrogen compound is 8.2 E-5/yr. This means that a full-bore leak is expected to occur less than once every 10,000 years. The risk can be further reduced by implementing mitigative countermeasures, such as CMU walls along the sides of the equipment compound. This would reduce the overall consequence of the worst-case dispersion scenarios (horizontal impact of plume). In terms of siting and safety analysis, the NFPA 2 code was used to provide a high-level evaluation of the current site plan. The most limiting equipment in terms of set-back distance are the compressors/storage units because of the high-pressure hydrogen. The site layout was evaluated for an acceptable location for the compression/storage unit based on NFPA 2 set-back distances. It is important to note that the NFPA 2 set-back distances consider both likelihood and consequence. This is important because the worst-case results evaluated herein also represent the least likely leak scenario. Other site-specific considerations were evaluated, including the parking shade structure with photovoltaic cells and refueling vehicles. These issues were dispositioned and determined to not present a safety risk.

08 HYDROGEN↗

A Comparison of RESRAD and GoldSim Models for Assessing Radiological Dose for a RCRA Landfill - 20418

US Ecology Idaho (USEI) operates a Resource Conservation and Recovery Act (RCRA) Subtitle C, Hazardous Waste Treatment, Storage, and Disposal (TSD) Facility on a 640-acre property in Owyhee County, Idaho. USEI accepts a wide variety of RCRA-exempt low activity radioactive wastes, including naturally occurring radioactive material (NORM) and technologically enhanced NORM (TENORM) (USEI 2009). The performance of the landfill with regard to radiological operating permit requirements was previously assessed using a model constructed with the residual radioactivity (RESRAD) computer program, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE). RESRAD supports the evaluation of several environmental transport pathways related to a radionuclide-contaminated soil source term, but it was not conceived as a model for the evaluation of landfill radiological performance. A more comprehensive and realistic model is desired in order to better support submissions to both the State of Idaho's Department of Environmental Quality as well as the U.S. Nuclear Regulatory Commission. A Performance Assessment (PA) computer model was developed using GoldSim software for the USEI RCRA Subtitle C landfill. The RESRAD computer model was specifically developed for calculating soil cleanup criteria and radiological dose and cancer risk from residual radioactive material in soil. To evaluate site-specific conditions, users may select from among a number of available environmental transport and exposure pathways and modify 'default' parameter values. In GoldSim, a user must construct the model 'from scratch.' However, this modeling is facilitated by a number of specialized elements available in GoldSim to support a radiological mass transport model. These include elements for defining radiological decay and ingrowth, container failure and radiological release, advective and diffusive transport, and other processes. Advantages afforded by the use of RESRAD for modeling radiological dose for a RCRA Subtitle C landfill include ease of use and reasonable flexibility in specifying site-specific conditions. GoldSim allows for considerably more flexibility and site-specificity than RESRAD, including evaluation of potentially relevant environmental transport processes not supported in RESRAD. The probabilistic modeling capabilities of GoldSim also far exceed those of RESRAD. The pros and cons of RESRAD and GoldSim for this modeling problem are explored with a focus on identifying approaches and critical factors in identifying the appropriate platform. The capabilities of RESRAD and GoldSim for mathematically modeling the disposal system will be contrasted and compared. For example, the existing RESRAD radiological safety assessment evaluated potentially complete exposure pathways related to infiltration to groundwater and upwards diffusion of radon. Additional transport pathways identified in the USEI Idaho facility Conceptual Site Model include deposition of radon decay products in cover material, root uptake of radionuclides in disposed wastes by native plants, and mixing of cover material by burrowing animals. Results of the two models and how the different transport and dose pathways affect results will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A review of tidal energy—Resource, feedbacks, and environmental interactions

The ocean contains a variety of renewable energy resources, little of which has been exploited. Here, we review both tidal range and tidal stream energy, with a focus on the resource, feedbacks, and environmental interactions. The review covers a wide range of timescales of relevance to tidal energy, from fortnightly (spring-neap) and semi-diurnal variability, down to array, and device-scale turbulence. When simulating the regional tidal energy resource, and to assess environmental impacts, it is necessary to account for feedbacks between the tidal array and the resource itself. We critically review various methods for simulating energy extraction, from insights gained through theoretical studies of “tidal fences” in idealized channels, to realistic three-dimensional model studies with complex geometry and arrays of turbines represented by momentum sinks and additional turbulence due to the presence of rotors and support structures. We discuss how variability can be reduced by developing multiple (aggregated) sites with a consideration of the enhanced phase diversity offered by exploiting less energetic tidal currents. This leads to future research questions that have not yet been explored in depth at first-generation tidal sites in relatively sheltered channels (e.g., the interaction of waves with currents). Such enhanced understanding of real sea conditions, including the effects of wind and waves, leads to our other identified primary future research direction—reduced uncertainties in turbulence predictions, including the development of realistic models that simulate the interaction between ambient turbulence and the turbulence resulting from multiple wakes, and changes to system-wide hydrodynamics, water quality, and sedimentation.

Environmental impacts↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗