Search NASA⌕ Search

SEARCH · Search NASA

Results for “solar prize”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

30 records · Page 2

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY↗

Environmental Testing of SolarSCADA's SSI Data Acquisition System

In April of 2022, SolarSCADA, Inc., was awarded voucher funding to conduct research and analysis at the National Renewable Energy Laboratory (NREL) per the American-Made Solar Prize. SolarSCADA produces a fully integrated data acquisition system that is designed specifically for PV fields and includes a data monitoring platform. SolarSCADA is focused providing the SSI unit with all sensors/measurements per requirements in IEC-61724-1 [1] and with utility scale bankability. The objective of the SolarSCADA voucher funding was established as follows: Leverage NREL's existing calibration and environmental testing capabilities to evaluate the stability of the SSI channels and overall systeme in response to extreme environmental conditions associated with fielded PV.

14 SOLAR ENERGY↗

Building the Next Generation Through 20 Years of Solar Decathlon: From Collegiate Prize to Multifaceted Clean Energy Workforce Program: Preprint

The U.S. Department of Energy Solar Decathlon, initiated in 2002 as a collegiate competition that challenges student teams to design and build high-performance, low-carbon buildings powered by renewables, has always been about developing students to be the next generation of buildings professionals. As we celebrate the 20th anniversary of the Solar Decathlon in 2022, this paper highlights its evolution from a singular prize to a multi-faceted platform preparing the broader buildings workforce to address the challenges of climate change. The original program challenged students to design and construct a residence. To improve the accessibility of the competition, the Design Challenge -- a 1-2 semester design-only competition-- was added to the Solar Decathlon platform. The Solar Decathlon has also scaled globally with events in Europe, the Middle East, China, Latin America and the Caribbean, Africa, and India. In 2021, the Solar Decathlon broadened its reach once again by introducing Solar Decathlon Pro, a zero-energy design practicum for professional architects and engineers. This paper utilizes participation data, surveys, alumni profiles, project submissions, and more to understand how changes to the program have expanded program reach to minority-serving institutions, environmental justice communities, and impacted the building industry's capacity to construct high performance and zero energy buildings. As one of the oldest federal government prizes, the Solar Decathlon offers a roadmap for dramatically increasing prize impact and demonstrates that it continues to push boundaries to tackle decarbonization and environmental justice.

build↗

Inclusive Solar Outreach Awards: Abbreviated Final Technical Report

Millions of Americans have experienced the benefits of transitioning to solar, such as money saved on electricity bills and reduced environmental impact. However, many households have been overlooked and left out of this energy transition due to limited funds, low credit scores, language barriers, or lack of solar adoption from neighbors and other community members. Leading organizations have recognized this gap in communications and have started to target more diverse audiences in their solar marketing campaigns. This project outlines three years of American-Made prize funding, recognizing solar industry communications campaigns that demonstrate excellence in strategic, effective, and meaningful communication to diverse audiences across digital, video, marketing, mobile, print, social media, and more.

14 SOLAR ENERGY↗

Incentivizing and Supporting Early-Stage Solar Innovation in the United States

In 2018, the U.S. Department of Energy's Solar Energy Technologies Office and the National Renewable Energy Laboratory set out to develop a repeatable, predictable prize model (the American-Made Challenges) and an entrepreneurial innovation network (the American-Made Network) to support participants along their innovation journeys. This began with the launch of the Solar Prize. Five years and six rounds later, the Solar Prize is the longest-standing competition of the American-Made Challenges. It has awarded $\$20.1$ million in cash prizes and $\$5.5$ million in technical support vouchers to 140 teams across all aspects of the solar industry. By sharing the outputs of the prize, we hope that our lessons learned will help continue to build the clean tech entrepreneurship support ecosystem.

14 SOLAR ENERGY↗

Durability and Accelerated Aging Test of the Polymeric Mirror-Film Prototype (CRADA Final Report)

The participant is developing a low-cost liquid metal coating for concentrated solar power (CSP) polymeric mirrors. Current CSP technology uses bulky and costly glass mirrors. As a lighter alternative, polymeric mirror film is cheaper than glass mirrors, yet expensive to manufacture. The participant is working to develop a room temperature liquid-metal thin-film deposition technique and CSP polymeric mirror film that will reduce expenditures by 80% and film cost by 50%.

14 SOLAR ENERGY↗

Lessons Learned on Prize Design in the Perovskite Startup Prize

In 2018, the U.S. Department of Energy's Solar Energy Technologies Office and the National Renewable Energy Laboratory set out to develop a repeatable, predictable prize model with the American-Made Challenges. A new model launched by the Solar Energy Technologies Office in March 2021 was the American-Made Perovskite Startup Prize. This new prize aimed to accelerate the growth of the domestic perovskite industry and support the rapid development of solar cells and modules that use perovskite materials. By sharing the outputs of the prize, we hope that our lessons learned will help continue to build the clean tech entrepreneurship support ecosystem and influence how a successful prize design can be achieved.

14 SOLAR ENERGY↗

Multifunctional entinostat enhances the mechanical robustness and efficiency of flexible perovskite solar cells and minimodules

Flexible perovskite solar cells (F-PSCs), prized for their nature of soft and high power-weight compatibility, have attracted intensive attention. However, inferior buried perovskite-substrate interfaces due to low interfacial adhesion between perovskites and substrates and large deformation of flexible substrates have greatly limited the performance of F-PSCs. Here, we add organic molecule Entinostat (ET) into hole extraction material Poly[bis(4-phenyl)(2,4,6-trimethylphenyl)amine] (PTAA) to enhance the adhesion at the perovskite/substrate interface using the interactions of ET with perovskites, PTAA and indium tin oxide (ITO) through its multiple function groups. Meanwhile, ET added into perovskites reduces the voids at the bottom perovskite film, due to its capability to tune the crystallization of perovskites by forming adduct with lead. Consequently, the inverted small area F-PSCs achieved an efficiency of 23.4%. The flexible perovskite minimodule with an area of 9 cm 2 achieved an aperture efficiency of ~19.0% certified by National Renewable Energy Laboratory. Furthermore, the optimized unencapsulated flexible minimodule retained 84% of the initial efficiency after 5000 bending cycles and retained 90% of the initial PCE (T90) after light soaking for >750 hours.

14 SOLAR ENERGY↗

United States cool surfaces deployment plan

Solar-reflective building envelope surfaces, such as cool roofs and walls, can be especially helpful in disadvantaged communities that often have poorly insulated older homes, aging or absent air conditioning units, steep utility bills, polluted air, and high vulnerability and exposure to extreme heat. With support from the U.S. Department of Energy, our project seeks to dramatically increase the climate-appropriate deployment of cool surfaces across the United States with an emphasis on their application to disadvantaged communities. First, we sought to identify cool-surface deployment barriers, opportunities, and models by (a) reviewing the history of cool-surface deployment activities, (b) interviewing cool-surface stakeholders, (c) researching successful energy-efficiency/green building deployment models; and (d) interviewing the actors who have implemented these models. Second, we conducted a workshop to engage stakeholders in development of a deployment plan. Third, we asked several U.S. federal agencies (a) how cool surfaces and cool surface stakeholders could support their missions and (b) how agency activities could support cool-surface deployment. Fourth, we identified a set of transformative ideas that form the core of the deployment plan. Transformative ideas include but are not limited to initiatives to (a) launch an educational campaign to make the general public and building professionals aware of how cool roofs and walls exclude unwanted solar heat; (b) create a “Cool Roof Prize” stimulating the development of affordable, high-performance cool asphalt roofing shingles; (c) conduct high-profile, large-scale demonstration programs that bring cool surfaces to disadvantaged heat-vulnerable communities; and (d) support local, regional, and state climate action (heat mitigation) plans with cool surfaces.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Revisiting the Terawatt Challenge

Richard E. Smalley, in 2003, defined the Terawatt (TW) Challenge as “Adapting our energy infrastructure to simultaneously address diminishing oil resources and rising levels of atmospheric CO 2 .” Smalley, best known for the discovery of C 60 , for which he received the 1996 Nobel Prize in Chemistry, continued to address the challenges of anthropomorphic and natural global energy flows until he passed away in 2005. Smalley challenged the world to transform the energy sector. He envisioned electricity transmitted by high-voltage direct current (DC) lines from massively deployed solar plants in sunny areas and remotely sited nuclear plants. He also envisioned using advanced batteries for local storage of energy. To meet the needs of ~10 people in a world with a dwindling oil supply, Smalley asserted that the world would need to transform its fossil-fuel-driven 14-TW (average power) energy used in 2003 to a largely renewable-energy-driven 30–60 TW (average power) in 2050. This would be possible only if solar-electricity costs could be drastically reduced. The challenges associated with this transition have been called the “Terawatt Challenge.” Fifteen years later, solar-module costs have been reduced by tenfold and annual deployment of solar photovoltaic (PV) modules has grown by a factor of 100,from ~1 gigawatt (GW) in 2004 to ~100 GW in 2018, with a total of 500 GW installed worldwide, producing 2% of the planet’s electricity. As global installed solar generating capacity approaches1 TW, we revisit Smalley’s TW challenge to identify what has changed and quantify the TW Challenge for a baseline scenario and for two scenarios designed as upper and lower bounds determined by the degree we implement electrification and storage. In this paper, we show that the energy choices we make today will dramatically affect the magnitude of future global energy requirements.

SOLAR ENERGY↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Section 3 Reporting: Preserve America

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 37 R&D 100 Awards, and countless advances in science and technology. For over 75 years, the Laboratory has played a leading role in the Department of Energy (DOE) Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. The Laboratory is operated and managed by Brookhaven Science Associates (BSA), which was founded by the Research Foundation for the State University of New York on behalf of Stony Brook University, and Battelle, a non-profit applied science and technology organization. BNL is committed to longstanding partnerships with researchers, academic institutions, industry, students, teachers, and the surrounding community. BNL is located near the center of Suffolk County on Long Island, New York within Brookhaven Township, about 60 miles east of New York City. Most of BNL’s principal facilities are located near the center of the 5,265-acre (8.23 square mile) site (Figure 1). The developed area encompasses approximately 1,820 acres, consisting of: ▪ 500 acres originally developed by the Army (as part of WW II Camp Upton) and still used for offices and other operational buildings. ▪ 200 acres occupied by large, specialized research facilities. ▪ 520 acres occupied by outlying facilities, such as the Sewage Treatment Plant, research agricultural fields, housing facilities, and fire breaks. ▪ 400 acres of roads, parking lots, and connecting areas. ▪ 200 acres developed for the Long Island Solar Farm. The balance of the site, approximately 3,400 acres, is largely wooded and represents a native pine barrens ecosystem. In November 2000, DOE set aside 530 acres of undeveloped land at BNL as the Upton Ecological and Research Reserve. The Upton Reserve preserves this portion of the pine barrens ecosystem and provides an area for ecological research and education activities.

99 GENERAL AND MISCELLANEOUS↗