Search NASA⌕ Search

SEARCH · Search NASA

Results for “standard compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANSI/ASHRAE/IES Standard 90.1-2022 Performance Rating Method Reference Manual

This document is intended to be a reference manual for the Appendix G Performance Rating Method (PRM) of ANSI/ASHRAE/IES Standard 90.1-2022 (Standard 90.1-2022). The PRM can be used to demonstrate compliance with the standard and to rate the energy efficiency of commercial and high-rise residential buildings with designs that exceed the requirements of Standard 90.1. Use of the PRM for demonstrating compliance with Standard 90.1 was a new feature of ANSI/ASHRAE/IES Standard 90.1-2016 (Standard 90.1-2016). The procedures and processes described in the PRM reference manual (PRM-RM) are designed to provide consistency and accuracy by filling in gaps and providing additional details needed by users of the PRM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ANSI/ASHRAE/IES Standard 90.1-2019 Performance Rating Method Reference Manual

This document is intended to be a reference manual for the Appendix G Performance Rating Method (PRM) of ANSI/ASHRAE/IES Standard 90.1-2019 (Standard 90.1-2019). The PRM can be used to demonstrate compliance with the standard and to rate the energy efficiency of commercial and high-rise residential buildings with designs that exceed the requirements of Standard 90.1. Use of the PRM for demonstrating compliance with Standard 90.1 was a new feature of ANSI/ASHRAE/IES Standard 90.1-2016 (Standard 90.1-2016). The procedures and processes described in the PRM reference manual (PRM-RM) are designed to provide consistency and accuracy by filling in gaps and providing additional details needed by users of the PRM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Permanent Variance from 10 CFR 851 for Construction

Lawrence Livermore National Security, LLC (LLNS) requests variance from 10 CFR 851 (the Rule) for construction work at Lawrence Livermore National Laboratory (LLNL). The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of line-item construction projects under $50 million. This request is aligned with the approved NA 50 safety approach. Experience gained in the construction of the new LLNL Emergency Operations Center (EOC) under the variance granted in June 2020 and construction preparations to date on the Digital Infrastructure Capabilities Expansion (DICE) under the variance granted April 2022 is very encouraging. There are strong indicators that a benefit has been realized by both the subcontractors executing the work and the Laboratory. The variance has permitted local/regional construction businesses contracted to Management & Operation Contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851. This variance application was prepared according to the requirements in 10 CFR 851, Subpart D – Variances, § 851.31 Variance Process. This request is limited to subcontractor executed construction at LLNL.

42 ENGINEERING↗

Certification Rules and Standards Review

This report characterizes the certification practices for electric propulsion systems by modeling changes to current engine and propeller certification practices (14 CFR 23, 33 and 35 and means of compliance in standards developed by ASTM Committee F39 and F44). Industry technology paths are varied, so this report focuses on insights from the NASA X-57 Maxwell Distributed Electric Propulsion flight demonstrator system technology project. There are 122 sections of the regulation reviewed, where 28 needed tailoring or revision. A second report will examine the regulations to the X-57 system development products. A final report will describe a general regulatory gaps method for new vehicle concepts.

Schlickenmaier, Herbert↗

Comparison tests and experimental compliance calibration of the proposed standard round compact plane strain fracture toughness specimen

Standard round specimen fracture test results compared satisfactorily with results from standard rectangular compact specimens machined from the same material. The location of the loading pin holes was found to provide adequate strength in the load bearing region for plane strain fracture toughness testing. Excellent agreement was found between the stress intensity coefficient values obtained from compliance measurements and the analytic solution proposed for inclusion in the standard test method. Load displacement measurements were made using long armed displacement gages and hollow loading cylinders. Gage points registered on the loading hole surfaces through small holes in the walls of the loading cylinders.

Fisher, D. M.↗

White Paper on Case Study of Safe Installation of Second-Life Energy Storage System

This technical report provides for a case study for the safe installation of a second-life, or repurposed, battery, that has been reconfigured for use as a stationary energy storage systems (ESS). Driven by legislative requirements such as California Senate Bill 615 and projections that retired EV batteries could meet a substantial portion of U.S. grid ESS needs beginning in 2035, the repurposing of EV batteries is anticipated to grow significantly. However, safety concerns arise from the effects of aging, unknown prior usage history, and changes in thermal runaway behavior, which may increase failure risks compared to new batteries. NFPA 855, the predominant U.S. standard for ESS installation, mandates that second-life batteries meet all requirements for new batteries, with repurposers complying with UL 1974 in addition to obtaining UL 9540 and UL 1973 listings. These are certifications that few repurposers have achieved and represent a regulatory barrier to entry for the market as a whole.

47 OTHER INSTRUMENTATION↗

Autonomous Fueling System for Heavy-Duty Fuel Cell Electric Trucks

The motivation for this project stemmed from the challenges associated with rapidly refueling heavy-duty hydrogen fuel cell electric trucks (FCETs). Current manual refueling processes for fast refueling involve large, heavy equipment (e.g., hoses three times heavier than standard) and pose ergonomic risks and potential for equipment damage. The goal was to develop and test an autonomous fueling system to improve ergonomics, enhance safety, increase equipment durability through design improvements, and potentially speed up the fueling process. This project aimed to add to the understanding of autonomous systems in the context of heavy-duty hydrogen refueling, evaluating the technical effectiveness of potential concepts. A successfully developed system would benefit the public by facilitating the adoption of zero-emission heavy-duty transport, reducing reliance on manual labor for a physically demanding task, and potentially improving the safety and efficiency of hydrogen refueling infrastructure. The major accomplishment during the project's active period was the completion of the system-level architecture task. This involved establishing a detailed list of system requirements covering interfaces, environmental conditions, regulatory compliance, industry standards, safety, security, performance capabilities, and optional features. Five key use cases for the autonomous system were also identified. However, due to internal restructuring at Nikola, the necessary resources could not be allocated to continue the project. Consequently, Nikola opted to discontinue the project. The award was mutually terminated by Nikola and the DOE.

08 HYDROGEN↗

Radiological HEPA Filter 10-year Lifetime Evaluation in Research Facilities

High-efficiency particulate air (HEPA) filters are widely employed by nuclear facilities to remove radiological particulate matter from their effluent exhaust streams. The purpose of this study is to evaluate the relationships between the 10-year HEPA filter lifetime deployment and its other performance indicators. This 10-year-long endeavor to collect and analyze data regarding the service life of HEPA filters at the Pacific Northwest National Laboratory began in 2010. A set of HEPA filters were selected and have been surveyed and analyzed at least annually to verify compliance with permit conditions. The study suggests the frequency of filter replacement should be based on the actual operational requirements, such as fume hood face velocity and/or efficiency test results, instead of on the prescribed filter “age limit” of 10 years from the date of manufacture (e.g., birth date) when operating under dry conditions. The study has now been completed, and over the past decade all the HEPA filters have been replaced, due to either technical issues as listed in this report or the previously recommended filter “age limit” of 10 years as prescribed by the oversight bodies. Experimentally determined failure rates are also determined from the data set and can be used to estimate the chances of HEPA filters surviving 15, 20, or even 30 years.

61 RADIATION PROTECTION AND DOSIMETRY↗

Final Status of HEPA Filter 10-Year Lifetime Evaluation

High-efficiency particulate air (HEPA) filters are widely employed by nuclear facilities to remove radiological particulate matter from their effluent exhaust streams. The purpose of this study is to evaluate the relationships between the 10-year HEPA filter lifespan and its other performance indicators. The 10-year-long endeavor to collect and analyze data regarding the lifetime of HEPA filters at the Pacific Northwest National Laboratory began in 2010. Forty-nine HEPA filters were selected and have been surveyed and analyzed at least annually to verify compliance with permit conditions. The study suggests the frequency of filter replacement should be based on the actual operational requirements, such as fume hood face velocity and/or efficiency test results, instead of on the prescribed filter “age limit” of 10 years from the date of manufacture (e.g., birth date) when operating under dry conditions. Over the past decade, the study has now been completed, and all forty-nine HEPA filters have been replaced, due to either technical issues listed in this report, or the previously recommended filter “age limit” of 10 years.

61 RADIATION PROTECTION AND DOSIMETRY↗