Search NASA⌕ Search

SEARCH · Search NASA

Results for “stormwater systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements:(1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020 (Copy for Informational Puproses Only)

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements: (1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the ninth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility (UPF), the Mercury Treatment Facility (MTF) on EFPC, the site-wide power grid upgrade, construction of an Emergency Operations Center, construction of a new Fire Station, Security Improvement Revitalization Program (SIRP), West End Protection Area Reduction (WEPAR) Project, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2021. However, moving forward, challenges to protect stormwater will continue from these projects. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2022. Y-12 will continue to implement appropriate Best Management Practices and reduce outside material storage areas where possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the eighth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. The general condition of the site continues to improve. The repair of Outfall 014 is complete and sampling was performed in 2020 from the new Outfall 014 structure. This repair marks a significant improvement in the storm drain network infrastructure. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility, the Mercury Treatment Facility on EFPC, the site-wide power grid upgrade, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2020; however, moving forward, these projects will present challenges for the protection of stormwater. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2021. Y-12 will continue to implement appropriate best management practices and reduce outside material storage areas where possible.

54 ENVIRONMENTAL SCIENCES↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microbiome response in an urban river system is dominated by seasonality over wastewater treatment upgrades

Background: Microorganisms such as coliform-forming bacteria are commonly used to assess freshwater quality for drinking and recreational use. However, such organisms do not exist in isolation; they exist within the context of dynamic, interactive microbial communities which vary through space and time. Elucidating spatiotemporal microbial dynamics is imperative for discriminating robust community changes from ephemeral ecological trends, and for improving our overall understanding of the relationship between microbial communities and ecosystem health. We conducted a seven-year (2013–2019) microbial time-series investigation in the Chicago Area Waterways (CAWS): an urban river system which, in 2016, experienced substantial upgrades to disinfection processes at two wastewater reclamation plants (WRPs) that discharge into the CAWS and improved stormwater capture, to improve river water quality and reduce flooding. Using culture-independent and culture-dependent approaches, we compared CAWS microbial ecology before and after the intervention. Results: Examinations of time-resolved beta distances between WRP-adjacent sites showed that community similarity measures were often consistent with the spatial orientation of site locations to one another and to the WRP outfalls. Fecal coliform results suggested that upgrades reduced coliform-associated bacteria in the effluent and the downstream river community. However, examinations of whole community changes through time suggest that the upgrades did little to affect overall riverine community dynamics, which instead were overwhelmingly driven by yearly patterns consistent with seasonality. Conclusions: This study presents a systematic effort to combine 16S rRNA gene amplicon sequencing with traditional culture-based methods to evaluate the influence of treatment innovations and systems upgrades on the microbiome of the Chicago Area Waterway System, representing the longest and most comprehensive characterization of the microbiome of an urban waterway yet attempted. We found that the systems upgrades were successful in improving specific water quality measures immediately downstream of wastewater outflows. Additionally, we found that the implementation of the water quality improvement measures to the river system did not disrupt the overall dynamics of the downstream microbial community, which remained heavily influenced by seasonal trends. Such results emphasize the dynamic nature of microbiomes in open environmental systems such as the CAWS, but also suggest that the seasonal oscillations remain consistent even when perturbed.

16S rRNA gene sequencing↗

Computational Analysis of Hydraulic Capacity of Ohio DOT Catch Basin No. 6 in On-Grade and Sag Locations

Stormwater runoff from streets and highways is typically captured by drainage structures strategically placed when roadways use curb or curb and gutter systems. These structures include catch basins with grates, inlets, or combination grates/inlets that collect and discharge storm water runoff to buried pipe conveyance systems. The performance of these drainage structures is measured in terms of hydraulic efficiency, which is defined as the percentage of flow captured by the basin as compared to the total flow draining to the structure. Understanding the performance of these drainage structures allows for a safe and economical design which prevents flooding along Ohio roadways.

42 ENGINEERING↗

Decision making for implementing non-traditional water sources: a review of challenges and potential solutions

Abstract The effects of climate change, population growth, and future hydrologic uncertainties necessitate increased water conservation, new water resources, and a shift towards sustainable urban water supply portfolios. Diversifying water portfolios with non-traditional water sources can play a key role. Rooftop harvested rainwater (RHRW), atmospheric and condensate harvesting, stormwater, recycled wastewater and greywater, and desalinated seawater and brackish water are all currently utilized and rapidly emerging non-traditional water sources. This review explores the status and trends around these non-traditional water sources, and reviews approaches and models for prioritizing, predicting, and quantifying metrics of concern. The analysis presented here suggests that understanding the challenges of location specific scenarios, socioeconomic knowledge gaps, water supply technologies, and/or water management structure is the crucial first step in establishing a model or framework approach to provide a strategy for improvement going forward. The findings of this study also suggest that clear policy guidance and onsite maintenance is necessary for variable water quality concerns of non-traditional sources like harvested rainwater and greywater. In addition, use of stormwater or reuse of wastewater raises public health concerns due to unknown risks and pathogen levels, thus rapid monitoring technologies and transparent reporting systems can facilitate their adoption. Finally, cost structure of desalination varies significantly around the world, largely due to regulatory requirements and local policies. Further reduction of its capital cost and energy consumption is identified as a hurdle for implementation. Overall, models and process analyses highlight the strength of comparative assessments across scenarios and water supply options.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community-Informed Urban Flood Modeling for Impact Mitigation

The intensification of the hydrologic cycle due to climate change poses a threat to aging and under-designed water infrastructure systems which cannot adequately manage intense storm events. Developing a comprehensive plan for managing rain-driven flooding events is challenging due to uncertainties in the magnitude and frequency of future storm events and conflicting stakeholder objectives. In the City of Baltimore, Maryland, stormwater infrastructure is struggling to keep up with rainfall-driven (pluvial) flooding events, which regularly damage housing and disrupt transportation for residents. In this study, a hybrid of community engagement, numerical modeling, and artificial intelligence techniques are employed to explore prospective urban flooding adaptations. Community engagement drives the development of an urban flooding model (EPA Storm Water Management Model) for the Baltimore Harbor watershed. The model integrates complex surface and subsurface stormwater infrastructure data from the City, high-resolution spatial data, insights from local public works experts, and the lived experiences of City residents. This co-developed model simulates adaptations of interest to stakeholders in the city, including green and grey infrastructure and operational management strategies. Stormwater management scenarios focused on inlet cleaning and spatially concentrated green infrastructure are found to be the most effective in reducing flood depths in community priority locations. Together, these adaptations can reduce the duration of intersection inundation by more than twenty minutes, allowing for quicker emergency response and restoration of typical transportation systems. Future work will combine this community engaged flooding model with the Deep Uncertainties Pathways framework to explore tradeoffs between adaptations and develop dynamic adaptations which align with community objectives, enhance climate resilience in Baltimore, and can be adjusted in response to changing future conditions.

Ava, Spangler [Pennsylvania State University]↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

Bayes_Opt-SWMM: A Gaussian process-based Bayesian optimization tool for real-time flood modeling with SWMM

Real-time flood model plays a pivotal role in averting urban flood damage, particularly when there is minimal lead time for preparatory measures. However, urban flood modeling in real-time often contends with inherent uncertainties arising from input data uncertainty and parameter ambiguities. Here this study introduces a real-time calibration (RTC) tool called Bayes_Opt-SWMM, specifically tailored for real-time urban flood modeling and uncertainty optimization. This tool leverages the Gaussian process-based Bayesian optimization algorithm and interfaces seamlessly with the Stormwater Management Model (SWMM). It integrates real-time model forcing data and flood monitoring collected through sensors and gauges which are strategically placed within critical locations of urban drainage systems. Our approach hinges on the Surrogate Model based Uncertainty Optimization (SMUO) concept, providing an avenue for enhancing real-time flood modeling. Bayes_Opt-SWMM runs the optimization process using a surrogate model called Gaussian Process emulator with two inference methods: (1) the Gaussian Process (GP) model and (2) Markov Chain Monte Carlo (MCMC) algorithm in GP model (GP_MCMC). Furthermore, three acquisition functions, namely Expected Improvement (EI), Maximum Probability of Improvement (MPI), and Lower Confidence Bound (LCB), facilitate optimal parameter fitting within the surrogate models. The efficiency of GP-based surrogate models in learning SWMM model parameters, leads to an improved uncertainty quantification and accelerated real-time flood modeling in urban areas. Overall, Bayes_Opt-SWMM emerges as a cost-effective and valuable tool for real-time flood modeling and monitoring, with significant potential for managing intelligent storm water systems in urban environments.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

Components Refurbishment and Chemical Analysis Facility, SWMU #041 - Per- and Polyfluoroalkyl Substances Site Assessment Report Kennedy Space Center, Florida

This PFAS Site Assessment (SA) Report presents the activities and results associated with PFAS investigations at the Components Refurbishment and Chemical Analysis (CRCA) facility located at Kennedy Space Center (KSC), Florida. In 2022, CRCA was identified as an Area of Potential Concern because the facility stores several potential PFAS-containing chemicals. A groundwater sample collected from an onsite monitoring well detected PFOA and PFOS at concentrations greater than State of Florida provisional Groundwater Cleanup Target Levels (pGCTLs). PFAS SA activities were conducted between March 2022 and February 2024. During this timeframe, a total of 16 direct-push technology (DPT) locations and 82 discrete samples were collected from these locations, along with 90 monitoring well samples. The analytical data screening process focused on State of Florida pGCTLs and United States Environmental Protection Agency (USEPA) Regional Screening Level (RSLs) from November 2023 to evaluate the data. Analytical results identified PFOS, PFOA, and PFBA at concentrations exceeding their respective RSLs at each depth interval (shallow, intermediate, and deep). PFOS and PFOA had the largest footprint of RSL exceedances in each depth interval, but pGCTL exceedances were only observed at limited locations in the shallow and intermediate intervals. PFBA had the highest detections of any PFAS compound, with concentrations exceeding 180,000 nanograms per liter (ng/L), which is 100-times the RSL of 1,800 ng/L in the shallow and intermediate intervals and 10-times the RSL in the deep interval. The maximum PFBA detection was 841,000 ng/L at shallow monitoring well, MW0006. The PFAS SA also included samples collected from the onsite hydraulic containment system (HCS) which was installed to control and treat the onsite chlorinated volatile organic compound (CVOC) plume. Influent and effluent aqueous samples were collected monthly from the system. PFAS concentrations were relatively the same for both influent and effluent samples, indicating that while the HCS has been effective for CVOC treatment, it does not provide any additional treatment for PFAS compounds. Since the HCS has achieved its objectives, the system was shut down in December 2024. PFAS data gaps still exist, to include surface water and soil, which were not sampled during this SA. Soil sampling near the Chemical Process Area is recommended. Surface water and soil sampling at select stormwater outfalls is also recommended. Additionally, further groundwater sampling is recommended (DPT and monitoring well) in all depth intervals to delineate the extent of PFAS impacts at CRCA.

K Alex Murphy↗

Uncertainties in Local Intense Precipitation Flood Modeling

In the Task 1 report for the U.S. Nuclear Regulatory Commission (NRC) funded Local Intense Precipitation (LIP) Probabilistic Flood Hazard Assessment (PFHA) Pilot Study, the Pacific Northwest National Laboratory (PNNL) reviewed hydrologic and hydraulic modeling approaches for estimation of LIP flooding and their implementation in readily available simulation software packages (Prasad and Yuan 2020). NRC’s interest is in developing guidance for performing LIP PFHA at nuclear power plant (NPP) sites. This report describes the work done under Task 2 of the study that focused on describing uncertainties associated with LIP flood modeling. Two main types of uncertainties exist in LIP flood modeling: (1) aleatory uncertainties that arise from the inherent natural variability of the hydrometeorological system and (2) epistemic uncertainties that arise from the analysts’ incomplete knowledge of the hydrometeorological and site configuration. Principal sources for aleatory variability in LIP flood simulations at NPP sites include precipitation (i.e., magnitude, duration, and temporal distribution of LIP events), initial conditions (e.g., soil moisture content, stormwater drainage discharge, surface storage), boundary conditions (e.g., upstream discharge, downstream water surface elevations), and long-term temporal trends (e.g., climate change). This report describes approaches used for estimating the aleatory variability in precipitation including precipitation-frequency analysis, numerical weather prediction, and stochastic weather generation. Data sources that can be used to estimate aleatory variability in initial and boundary conditions are also described. Approaches to include effects of long-term trends like those from climate change into estimation of aleatory variability are summarized. Sources of epistemic uncertainty in LIP flood simulations at NPP sites include process representation (e.g., multiple approaches to represent runoff generation, stormwater drainage, and hydraulic routing), site configurations (e.g., site layout, flow features, status of temporary flood protection, blockage of drains), model resolution, and long-term temporal trends (e.g., known/planned site alterations, land-use changes at and in the vicinity of the site). The report describes alternative process representations (methods and models), particularly those implemented in the LIP flood simulation software packages reviewed in Task 1 report, and lists the associated model parameters. Approaches for estimating model parameters when surface and subsurface water exchanges occur are also described.

42 ENGINEERING↗

Automated Detection of Instability-Inducing Channel Geometry Transitions in Saint-Venant Simulation of Large-Scale River Networks

A new sweep-search algorithm (SSA) is developed and tested to identify the channel geometry transitions responsible for numerical convergence failure in a Saint-Venant equation (SVE) simulation of a large-scale open-channel network. Numerical instabilities are known to occur at “sharp” transitions in discrete geometry, but the identification of problem locations has been a matter of modeler’s art and a roadblock to implementing large-scale SVE simulations. The new method implements techniques from graph theory applied to a steady-state 1D shallow-water equation solver to recursively examine the numerical stability of each flowpath through the channel network. The SSA is validated with a short river reach and tested by the simulation of ten complete river systems of the Texas–Gulf Coast region by using the extreme hydrological conditions recorded during hurricane Harvey. The SSA successfully identified the problematic channel sections in all tested river systems. Subsequent modification of the problem sections allowed stable solution by an unsteady SVE numerical solver. The new SSA approach permits automated and consistent identification of problem channel geometry in large open-channel network data sets, which is necessary to effectively apply the fully dynamic Saint-Venant equations to large-scale river networks or for city-wide stormwater networks.

54 ENVIRONMENTAL SCIENCES↗

Assessing shellfish water exposure to fecal bacteria pollution in Salish Sea: three-dimensional modeling and implications for monitoring

Fecal bacteria (FB) contamination poses significant risks to shellfish safety and management in coastal and estuarine waters. Despite extensive pollution identification and correction efforts, FB contamination in shellfish-growing areas persists in the Salish Sea, highlighting the need to identify overlooked sources and better understand FB transport from riverine and shoreline inputs to shellfish beds. To address this, a high-resolution three-dimensional hydrodynamic model coupled with FB kinetics was developed and applied to a case study site in Salish Sea—Portage Bay—to simulate freshwater plume circulation, flushing dynamics, and bacterial transport. Daily FB loading from the major freshwater inflow—Nooksack River was generated by both linear interpolation and integrating a machine learning approach (XGBoost), trained on historical hydrological and meteorological data. The model successfully reproduced both the magnitude and seasonal variation of FB concentrations in Portage Bay for the year of 2021, demonstrating that simplified FB kinetics with first-order decay due to mortality was effective in this dynamic coastal environment with short flushing time. Model results identified the Nooksack River as the dominant far-field FB source, while scenario simulations showed that near-field coastal stormwater outfalls elevated local FB levels following rainfall, particularly under low-flow conditions. The XGBoost prediction provided comparable or superior accuracy to linear interpolation, particularly during periods of missing observational data, by capturing short-term variability and event-driven loading more effectively. Integrating data-driven riverine FB inputs with mechanistic coastal numerical modeling provides a robust framework for operational forecasting of shellfish bed exposure risk and supports adaptive monitoring and management of shellfish growing areas in the Salish Sea and similar coastal systems.

Salish Sea↗

AmeriFlux FLUXNET-1F US-ORv Olentangy River Wetland Research Park

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-ORv Olentangy River Wetland Research Park. This is the FLUXNET version of the carbon flux data for the site US-ORv Olentangy River Wetland Research Park produced by applying the standard ONEFlux (1F) software. Site Description - The ORWRP site is a 21-ha large-scale, long-term wetland campus facility that is owned by Ohio State University. It is designed to provide teaching, research, and service related to wetland and river science and ecological engineering. The site has been developed in several phases: Phase 1 (1992 - 1994) - Construction of two 2.5-acre deepwater marshes and a river water delivery system began, with pumps installed on the floodplain to bring water from the Olentangy River. In May 1994, one wetland was planted with marsh vegetation, while the other remained as an unplanted control; Phase 2 (1994 - 1999) - Development of a research and teaching infrastructure took place with the construction of boardwalks, a pavilion, and a compound. The creation of the 7-acre naturally flooded oxbow was also included; Phase 3 (2000 - 2003) - As a research building was created, three additional wetlands were created in the vicinity of the building, including a stormwater wetland that receives runoff from the roof of the building; Phase 4 - The current phase involves research access to the Olentangy River.

Bohrer, Gil↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗