Search NASA⌕ Search

SEARCH · Search NASA

Results for “supply chain management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ASPEN Version 3.0

The Automated Scheduling and Planning Environment (ASPEN) computer program has been updated to version 3.0. ASPEN is a modular, reconfigurable, application software framework for solving batch problems that involve reasoning about time, activities, states, and resources. Applications of ASPEN can include planning spacecraft missions, scheduling of personnel, and managing supply chains, inventories, and production lines. ASPEN 3.0 can be customized for a wide range of applications and for a variety of computing environments that include various central processing units and random access memories.

Rabideau, Gregg↗

Tool for Analysis and Reduction of Scientific Data

The Automated Scheduling and Planning Environment (ASPEN) computer program has been updated to version 3.0. ASPEN as a whole (up to version 2.0) has been summarized, and selected aspects of ASPEN have been discussed in several previous NASA Tech Briefs articles. Restated briefly, ASPEN is a modular, reconfigurable, application software framework for solving batch problems that involve reasoning about time, activities, states, and resources. Applications of ASPEN can include planning spacecraft missions, scheduling of personnel, and managing supply chains, inventories, and production lines. ASPEN 3.0 can be customized for a wide range of applications and for a variety of computing environments that include various central processing units and randomaccess memories. Domain-specific reasoning modules (e.g., modules for determining orbits for spacecraft) can easily be plugged into ASPEN 3.0. Improvements over other, similar software that have been incorporated into ASPEN 3.0 include a provision for more expressive time-line values, new parsing capabilities afforded by an ASPEN language based on Extensible Markup Language, improved search capabilities, and improved interfaces to other, utility-type software (notably including MATLAB).

James, Mark↗

Cloud Governance at Scale

Operating and maintaining a large multi-tenant ecosystem in the cloud requires scalable solutions to unique technical and process challenges. The Cloud Computing model grants significant permissions to development teams that traditionally were reserved for Data-Center Administrators and Supply-Chain Managers. Earthdata Cloud has worked to re-cast traditional data-center management into a sensible cloud-first model. This talk discusses some of our challenges, solutions, and way ahead.

financial controls↗

Urban Air Mobility (UAM)

ARMD's urban air mobility strategy, including key activities of UMLs, Grand Challenge series, UAM ecosystem working groups, supply chain management, and modeling simulation tools.

Kopardekar, Parimal H.↗

Microbes Share Rides Too: Updating Encapsulated Bioburden Estimate Values in Electronic Parts Common to Class D Mission Platforms.

As NASA develops more planetary protection missions that are Category III and in the Class D/rideshare mission platform, there is an increasing reliance on estimation of prelaunch bioburden to understand needs for burn up and breakup analyses or other methods to meet pre-launch bioburden levels. Current levels estimated for the encapsulated bioburden of semiconductor parts cited by NASA have been based on estimates of semiconductor manufacturing approaches from the 1970s that do not incorporate over fifty years of evolving cleanliness of semiconductor manufacturing processes and facilities. This investigation will focus on direct sampling of semiconductor parts for encapsulated bioburden values, drawing upon Goddard’s strength in EEE parts, supply chain management, destructive parts analysis and existing local planetary protection lab facilities to prepare and measure encapsulated bioburden at a statistically significant level for standard electronics parts common to known Class D/rideshare platforms.

planetary protection↗

Microbes Share Rides Too: Updating Encapsulated Bioburden Estimate Values in Electronic Parts Common to Class D Missions

As NASA develops more planetary protection missions that are Category III and in the Class D/rideshare mission platform, there is an increasing reliance on estimation of prelaunch bioburden to understand needs for burn up and breakup analyses or other methods to meet pre-launch bioburden levels. Current levels estimated for the encapsulated bioburden of semiconductor parts cited by NASA have been based on estimates of semiconductor manufacturing approaches from the 1970s that do not incorporate the evolving cleanliness of semiconductor manufacturing since that time. This investigation will focus on direct sampling of semiconductor parts for encapsulated bioburden values, drawing upon Goddard’s strength in EEE parts, supply chain management, destructive parts analysis and existing local planetary protection lab facilities to prepare and measure encapsulated bioburden at a statistically significant level for standard electronics parts common to known Class D/rideshare platforms.

planetary protection↗

Climate Information and Lessons Learned from the NASA Earth eXchange (NEX), Short-term Prediction Research and Transition Center (NASA SPoRT), and the NASA Regional Climate Model Evaluation System (RCMES)

Climate resilience can emerge from a combination of (1) climate projections that enable future-oriented planning and (2) contemporary observations that can be used for adaptation in the face of realized climate. NASA is uniquely positioned to provide global climate projections and satellite-based observations to users who must take a global perspective on climate risk (e.g., supply chain managers). Here, we will share the capabilities and experiences of three NASA projects. The first project, the NASA Earth eXchange (NEX) provides two downscaled climate projections, NEX-GDDP-CMIP6, a global 25 km resolution product, and NEX-DCP30-CMIP6, an 800 m resolution product covering the coterminous U.S. specifically designed for U.S. National Climate Assessment (NCA). NEX also offers land surface products that mirror the twice-daily products provided by the Moderate Resolution Imaging Spectroradiometer (MODIS) but are derived from operational geostationary weather satellite data collected at 5-10 minutes intervals. The second project, the Short-term Prediction Research and Transition Center (SPoRT), was established in 2002 to transition unique NASA satellite products and capabilities to stakeholders to improve decision-making that benefits society. SPoRT provides products and capabilities derived from NASA observations and models to end users in government, academia, and the private sector. SPoRT translates NASA Earth science into actionable solutions reaching over 400 stakeholders across 80 organizations. Finally, the Regional Climate Model Evaluation System (RCMES) is designed to facilitate regional-scale evaluations of climate models by providing standardized access to a vast and comprehensive set of observations, such as satellite, in-situ, and reanalyses, and modeling resources such as CMIP & CORDEX. These three projects form part of the core capabilities at the NASA Centers deliver climate information under the new NASA Earth Science to Action (ES2A) strategy.

NEX↗

Building Supply Chain Visibility for Risk Management: Illuminating the COVID-19 Pandemic Impact Upon NASA Suppliers

NASA mission projects rely upon global supply chains subject to an array of risks that threaten to disrupt or deny the timely, affordable provision of products and services as required for mission success. Visibility into these supply chains is key to the management of risks, such as those stemming from the coronavirus pandemic and its associated effects upon suppliers. Accordingly, the Supplier Research and Analysis (SRA) Program within Goddard Space Flight Center’s Safety and Mission Assurance (SMA) Directorate produced the COVID-19 pandemic/NASA suppliers dashboard as part of the NASA Meta Information System. The dashboard provides visibility and situational awareness to aid risk assessment, planning and decision-making over the course of the pandemic recovery phase. The approach of integrating data and information into visual dashboard displays has also been employed by the SRA Program to focus on specific risks pertaining to foreign-based suppliers. This webinar is presented by the NASA Office of SMA and its Supply Chain Risk Management Program, in collaboration with the NASA Safety Center and Goddard’s SMA Directorate.

supplier research and analysis, supply chain risk ↗

The Future of Asset Management for Human Space Exploration: Supply Classification and an Integrated Database

One of the major logistical challenges in human space exploration is asset management. This paper presents observations on the practice of asset management in support of human space flight to date and discusses a functional-based supply classification and a framework for an integrated database that could be used to improve asset management and logistics for human missions to the Moon, Mars and beyond.

interplanetary supply chain management↗

Precision Cleaning - Path to Premier

ITT Space Systems Division s new Precision Cleaning facility provides critical cleaning and packaging of aerospace flight hardware and optical payloads to meet customer performance requirements. The Precision Cleaning Path to Premier Project was a 2007 capital project and is a key element in the approved Premier Resource Management - Integrated Supply Chain Footprint Optimization Project. Formerly precision cleaning was located offsite in a leased building. A new facility equipped with modern precision cleaning equipment including advanced process analytical technology and improved capabilities was designed and built after outsourcing solutions were investigated and found lacking in ability to meet quality specifications and schedule needs. SSD cleans parts that can range in size from a single threaded fastener all the way up to large composite structures. Materials that can be processed include optics, composites, metals and various high performance coatings. We are required to provide verification to our customers that we have met their particulate and molecular cleanliness requirements and we have that analytical capability in this new facility. The new facility footprint is approximately half the size of the former leased operation and provides double the amount of throughput. Process improvements and new cleaning equipment are projected to increase 1st pass yield from 78% to 98% avoiding $300K+/yr in rework costs. Cost avoidance of $350K/yr will result from elimination of rent, IT services, transportation, and decreased utility costs. Savings due to reduced staff expected to net $4-500K/yr.

Mackler, Scott E.↗

NASA Fastener Procurement, Receiving Inspection, and Storage Practices for NASA Mission Hardware

This document establishes minimum requirements for supply chain risk management, procurement, receiving inspection, testing, traceability management, and storage practices for fasteners used in NASA mission hardware. This document does not contain fastener requirements pertaining to design or design analysis; design and design analysis requirements are contained in NASA-STD-5020, Requirements for Threaded Fastening Systems in Spaceflight Hardware.

Safety and Mission Assurance↗

Supply Chain Research and Analysis: Illuminating Risks in Complex Systems

Framing the strategic challenge posed by the interconnected, multitiered supply chains of mission projects managed by the NASA Goddard Space Flight Center. Discussing conditions and risks which can disrupt or threaten the availability, production and delivery of products and services for complex space systems. Utilizing a holistic analytical framework, business intelligence techniques, an integrated information system platform and analytics to produce insight into suppliers / supply chains and associated risks. Advancing supply chain risk management capabilities to support the successful performance of space missions.

supply chain risk management↗

US Rocket Propulsion Industrial Base Health Metrics

The number of active liquid rocket engine and solid rocket motor development programs has severely declined since the "space race" of the 1950s and 1960s center dot This downward trend has been exacerbated by the retirement of the Space Shuttle, transition from the Constellation Program to the Space launch System (SLS) and similar activity in DoD programs center dot In addition with consolidation in the industry, the rocket propulsion industrial base is under stress. To Improve the "health" of the RPIB, we need to understand - The current condition of the RPIB - How this compares to past history - The trend of RPIB health center dot This drives the need for a concise set of "metrics" - Analogous to the basic data a physician uses to determine the state of health of his patients - Easy to measure and collect - The trend is often more useful than the actual data point - Can be used to focus on problem areas and develop preventative measures The nation's capability to conceive, design, develop, manufacture, test, and support missions using liquid rocket engines and solid rocket motors that are critical to its national security, economic health and growth, and future scientific needs. center dot The RPIB encompasses US government, academic, and commercial (including industry primes and their supplier base) research, development, test, evaluation, and manufacturing capabilities and facilities. center dot The RPIB includes the skilled workforce, related intellectual property, engineering and support services, and supply chain operations and management. This definition touches the five main segments of the U.S. RPIB as categorized by the USG: defense, intelligence community, civil government, academia, and commercial sector. The nation's capability to conceive, design, develop, manufacture, test, and support missions using liquid rocket engines and solid rocket motors that are critical to its national security, economic health and growth, and future scientific needs. center dot The RPIB encompasses US government, academic, and commercial (including industry primes and their supplier base) research, development, test, evaluation, and manufacturing capabilities and facilities. center dot The RPIB includes the skilled workforce, related intellectual property, engineering and support services, and supply chain operations and management. This definition touches the five main segments of the U.S. RPIB as categorized by the USG: defense, intelligence community, civil government, academia, and commercial sector.

Doreswamy, Rajiv↗

Supply Chain Research and Analysis for Space Systems

The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supply Chain Research and Analysis capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 105 reports since its start-up in early 2015.This presentation addresses the approach, methodology and performance of the Supply Chain Research and Analysiscapability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability.

supply chain risk management↗

Harmonizing Food Systems Emissions Accounting for More Effective Climate Action

Food systems—encompassing activities in food production, land-use change, supply chains and waste management—contribute significantly to climate change. Recent estimates indicate that food systems produce over 30% of annual anthropogenic greenhouse gas (GHG) emissions (about 20% of CO 2 , 50% of CH 4 , and 75% of N 2 O), with the Intergovernmental Panel on Climate Change (IPCC) estimating a notably broad range of 23%–42% of global GHG emissions. This paper synthesizes current research on the contributions of food systems to climate change, highlights challenges in quantifying their impact and proposes a harmonized accounting framework for more effective climate action. We recommend that an expert committee aligned with the IPCC develop guidance for food systems emissions accounting in four key areas, including: (1) defining system boundaries and nomenclature; (2) developing protocols to allocate broader sectoral emissions to food systems; (3) prioritizing critical areas for research into activity data and emissions factors; and (4) developing a balanced framework for evaluating the impact of mitigation interventions in light of other food systems imperatives. The committee should be integrated into two key international policy processes—the United Nations Framework Convention on Climate Change and the United Nations Food Systems Summit—to support coordinated action towards global net-zero goals. Guidance from the committee could significantly improve the ability of governments, companies, and researchers to estimate, report, monitor and ultimately reduce the climate impacts of food systems.

GHG accounting↗

Supplier Research & Analysis Approach

"The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supplier Research and Analysis (SRA) capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 95 reports since its start-up in early 2015. This presentation addresses the approach, methodology and performance of the Supplier Research and Analysis (SRA) capability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability."

supplier research and analysis↗