Search NASASearch

SEARCH · Search NASA

Results for “system power and thermal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

3,270 records · Page 2

Controls for Electrified Aircraft Propulsion

Advanced electrified aircraft propulsion (EAP) concepts with integrated power, propulsion, and thermal systems require the development of equally sophisticated controllers to fly safe and efficient missions. Hybrid electric aircraft utilize electric machines mechanically coupled to the engine shafts to extract and insert power for a variety of purposes. Additionally, electric machines may drive propulsive fans pulling from a combination of on-board energy storage devices and engine extracted power. NASA’s investment in hybrid electric aircraft hardware-in-the-loop testing enables controls research on representative engine models using a novel emulation and scaling methodology. High-voltage, high-power electrical powertrain presents several technical risks at altitude. High-power requires high efficiency to minimize losses. Superconducting electric machines and power distribution research at NASA has identified key challenges with potential controls solutions. These risks necessitate the development of controllers robust to model uncertainty, disturbances, and fault conditions. System health management and fault detection schemes play an important role in a multi-layer controls approach that utilizes a supervisor which oversees inner loops for the highly coupled power, propulsion, and thermal systems. Such a supervisory controller enables coordinates energy transfer between engines, energy storage devices, electric machines, propulsors, and heat exchangers. Existing methods have shown an improvement in engine operability using the hybrid electric powertrain.

Halle E Buescher

Nuclear Safety [Vol. 30, No. 1, January-March 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 International Conference on Thermal Reactor Safety: NUCSAFE 88 by A. P. Malinauskas and J. G. Pruett; ACCIDENT ANALYSIS: 18 Chernobyl Today: State of Research by A. Yu. Gagarinskii; CONTROL AND INSTRUMENTATION: 23 Problems Associated with Routine In-Plant Radioactive Effluent Monitoring Systems at U.S. Light-Water Reactors by Barry G. Wahlig, David M. Walker, Mahmoud R. Ghavi, and John M. Palms; DESIGN FEATURES: 34 Twentieth DOE/NRC Nuclear Air-Cleaning Conference by R. R. Bellamy, D. W. Moeller, and M. W. First, 46 Design Options for the Core Support Structure for Liquid-Metal-Cooled Reactor Plants by J. P. Burelbach, W. J. Kann, J. G. Saiveau, and R. W. Seidensticker; ENVIRONMENTAL EFFECTS: 53 The Radiological Consequences of the Chernobyl Accident by L. V. Konstantinov and A. J. González; WASTE AND SPENT FUEL MANAGEMENT: 70 Activities Related to Waste Management Compiled by E. G. Silver; OPERATING EXPERIENCES: 80 Fuel Performance Annual Report for 1986 by W. J. Bailey, 103 Safety Considerations Related to 12-Hour Shift Schedules by S. Gould, 105 Reactor Shutdown Experience Compiled by J. W. Cletcher, 108 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 130 General Administrative Activities Compiled by E. G. Silver, 140 Reports, Standards, and Safety Guides by D. S. Queener, 145 Status of Power-Reactor Licensing Activities Compiled by E. G. Silver, 153 Proposed Rule Changes as of Sept. 30, 1988; ANNOUNCEMENTS: 69 Northwestern University Short Course on Radiation Safety, 79 International Seminar on Fission Product Transport Processes in Reactor Accidents, 129 Harvard School of Public Health Offers Short Courses, 152 MIT Offers Summer Short Courses on Reactor Safety and Nodal Analysis, 152 Seminar on Use of PCs in Probabilistic Safety Analysis, 157 The Authors, 160 Indexes to Nuclear Safety, Volume 29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Safe, High Power / Voltage Battery Design Challenges

NASA seeks safe, high performing battery module designs that can deliver 3C discharge rates continuously, achieve 160 Wh/kg, and is passively propagation resistant to a single cell thermal runaway event. One solution is presented that uses a patented oscillating heat pipe technology for thermal management. Combined with light weight packaging and a new commercially available gas permeable vent port, all 5 preliminary safety tests results performed to date are showing ample margins.

High power

International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test

In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.

International Space Statio

Safe, High Power/Voltage Battery Module Design Challenges

NASA seeks to demonstrate a path for achieving safe, high power, and high performing Li-ion battery designs for the purpose of establishing design guidelines for our aeronautic and spacecraft applications. Safe means passively resistant to thermal runaway propagation of any single cell catastrophic thermal runaway. High power means capable of 3C continuous discharge without overheating. High performing means achieving > 160 Wh/kg, 200 Wh/L. The biggest challenge has been balancing a high flux light weight path for cell heat dissipation during the high rate discharge that minimizes thermal gradients between cells and also protects adjacent cells from the heat load of thermal runaway cell. Our solution includes an oscillating heat pipe spine that contacts every 18650 cell in the pack and careful cell design selection to maximize the range of initial temperatures conditions where the battery can safely complete the 3C discharge.

Thermal runaway

Performance of a Regenerative Fuel Cell System for the Lunar Surface

Regenerative fuel cells (RFCs) are an attractive energy storage solution for lunar missions as a technology capable of providing a higher specific energy (i.e., W∙h/kg) than state-of-the-art packaged Li-ion battery systems. An RFC consists of the (1 & 2) electrochemical stacks (chemical to electrical energy conversion to supply electricity to an external load, i.e. the fuel cell reaction, and electrical to chemical energy conversion of supplied electrical power to dissociate water into hydrogen and oxygen gases, i.e. water electrolysis), (3) fluidic conditioning, (4) reactant storage, (5) avionics, (6) power management and distribution (PMAD), and (7) thermal management. NASA’s Glenn Research Center has designed, assembled, and tested a breadboard RFC sys-tem capable of operating autonomously for multiple simulated lunar day/night cycles in a laboratory environment. The system is comprised of a non-flow through proton exchange membrane (PEM) fuel cell stack and a liquid-anode feed PEM electrolyzer (EZ) stack designed to electrochemically compress the reactants at balanced pressures up to 12.4 MPa (1800 psia). The fluidic conditioning, avionics, PMAD, and thermal management sub-systems are largely comprised of commercial-off-the-shelf components for this system-level development effort. The hardware is controlled by a CubeSat space processor running an operational program based on core flight architecture that can control the RFC hardware autonomously through a state machine with fault monitoring. The testing results highlighted here were completed with the system in an open-loop configuration such that reactants generated through water electrolysis were vented while gas cylinders supplied fuel cell operation. The breadboard operated autonomously, but there were five unplanned transitions to a safe state that required a manual restart after reviewing the data, determining a root cause, and implementing a solution. Four of the transitions were caused by the thermal management subsystem and the fifth was caused by a water management control issue in the EZ sub-system. The RFC system operated for over 550 hours with the final cycle being slightly abbreviated due to reasons unrelated to system performance.

Kerrigan Cain

Performance of a Regenerative Fuel Cell System for the Lunar Surface

Regenerative fuel cells (RFCs) are an attractive energy storage solution for lunar missions as a technology capable of providing a higher specific energy (i.e., W∙h/kg) than state-of-the-art packaged Li-ion battery systems. An RFC consists of the (1 & 2) electrochemical stacks (chemical to electrical energy conversion to supply electricity to an external load, i.e. the fuel cell reaction, and electrical to chemical energy conversion of supplied electrical power to dissociate water into hydrogen and oxygen gases, i.e. water electrolysis), (3) fluidic conditioning, (4) reactant storage, (5) avionics, (6) power management and distribution (PMAD), and (7) thermal management. NASA’s Glenn Research Center has designed, assembled, and tested a breadboard RFC sys-tem capable of operating autonomously for multiple simulated lunar day/night cycles in a laboratory environment. The system is comprised of a non-flow through proton exchange membrane (PEM) fuel cell stack and a liquid-anode feed PEM electrolyzer (EZ) stack designed to electrochemically compress the reactants at balanced pressures up to 12.4 MPa (1800 psia). The fluidic conditioning, avionics, PMAD, and thermal management sub-systems are largely comprised of commercial-off-the-shelf components for this system-level development effort. The hardware is controlled by a CubeSat space processor running an operational program based on core flight architecture that can control the RFC hardware autonomously through a state machine with fault monitoring. The testing results highlighted here were completed with the system in an open-loop configuration such that reactants generated through water electrolysis were vented while gas cylinders supplied fuel cell operation. The breadboard operated autonomously, but there were five unplanned transitions to a safe state that required a manual restart after reviewing the data, determining a root cause, and implementing a solution. Four of the transitions were caused by the thermal management subsystem and the fifth was caused by a water management control issue in the EZ sub-system. The RFC system operated for over 550 hours with the final cycle being slightly abbreviated due to reasons unrelated to system performance.

Kerrigan Cain

PowerModelsGAT-AI: Physics-Informed Graph Attention for Multi-System Power Flow With Continual Learning

Solving the alternating current power flow equations in real time is essential for secure grid operation, yet classical Newton–Raphson solvers can be slow under stressed conditions. Existing graph neural networks for power flow are typically trained on a single system and often degrade on different systems. We present PowerModelsGAT-AI, a physics-informed graph attention network that predicts bus voltages and generator injections. The model uses bus-type-aware masking to handle different bus types and balances multiple loss terms, including a power-mismatch penalty, using learned weights. We evaluate the model on 14 benchmark systems (4 to 6,470 buses) and train a unified model on 13 of these under contingency conditions with up to two branch outages, achieving an average normalized mean absolute error of 0.89% for voltage magnitudes and R 2 >0.99 for voltage angles. We also show continual learning: when adapting a base model to a new 1,354-bus system, standard fine-tuning causes severe forgetting with error increases exceeding 1000% on base systems, while our experience replay and elastic weight consolidation strategy keeps error increases below 2% and in some cases improves base-system performance. Interpretability analysis shows that learned attention weights correlate with physical branch parameters (susceptance: r=0.38 ; thermal limits: r=0.22 ), and feature importance analysis supports that the model captures established power flow relationships.

24 POWER TRANSMISSION AND DISTRIBUTION

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY

Nuclear Safety [Vol. 29, No. 3, July-September 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 259 Fifteenth Water Reactor Safety Information Meeting by E. G. Silver; CONTROL AND INSTRUMENTATION: 284 Reliability Technology to Improve and/or Maintain Emergency Diesel Generator Performance by S. Karimian and J. H. Taylor, 293 A Noise Diagnostics System for Operator Advice by G. Hessel, P. Liewers, P. Schumann, W. Schmitt, and F.-P. Weiss; PLANT SAFETY FEATURES: 307 A Passive Containment System for Advanced Light-Water Reactors by O. B. Falls, Jr., and F. W. Kleimola; ENVIRONMENTAL EFFECTS: 318 Data Base Construction for a Computerized Radiological Risk Investigation System by L. M. Hively, J. E. Nyquist, J. L. Bledsoe, and A. L. Sjoreen, 326 Erratum to "Radiation Hormesis and Nuclear Safety," Vol. 29, No. 1; OPERATING EXPERIENCES: 327 Operational Safety Experience and Passive Safety Testing at the Fast Flux Text Facility by Q. L. Baird, J. L. Rathbun, D. D. Stepnewski, R. L. Stover, and A. E. Waltar, 344 Backfilling of Independent Residual Heat Removal Systems in West Germany and Switzerland by G. Eckert and Y. Salomon, 353 Reactor Shutdown Experience Compiled by J. W. Cletcher, 356 Selected Safety-Related Events Compiled by G. A. Murphy, 363 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 384 General Administrative Activities Compiled by E. G. Silver, 390 Reports, Standards, and Safety Guides by D. S. Queener, 395 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 400 Proposed Rule Changes as of Mar. 31,1988; ANNOUNCEMENTS: 283 International ENS/ANS Conference on Thermal Reactor Safety "NUCSAFE 88", 317 Northwestern University Short Course on Radiation Safety, 407 Second International Seminar on Small- and Medium-Sized Nuclear Reactors, 407 International Workshop on New Developments in Occupational Dose Control and ALARA Implementation at Nuclear Power Plants and Similar Facilities, 408 Fourth International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-4), 404 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Impacts of Reduced Pressure Atmospheres on Environmental Control and Life Support Systems (ECLSS) Architectures

The study found that while nine subsystems are viable without modification at 10.2 psia, only three remain acceptable at 8.2 psia. Material flammability presents the most critical hurdle in the 8.2 psia/34-40% O 2 environment, where 70% of the assessed subsystems will require material replacements, many of which have yet to be developed. Ultimately, adapting ISS heritage hardware to these exploration conditions will introduce varied mass, power (e.g., increased fan speeds), and significant schedule impacts driven by the need for extensive testing, redesign, and recertification. The report concludes with specific recommendations for targeted analysis and testing to quantify these impacts and guide necessary design modifications.

Environmental Control and Life Support Systems

Optimization of the FRIB beam dump: a hybrid genetic algorithm and reinforcement learning approach

The operational envelope of high-power-density systems, such as particle accelerators and advanced nuclear energy systems, is critically constrained by the need to manage extreme thermal loads. To address this, we present a novel hybrid optimization framework combining a genetic algorithm (GA) with a soft actor-critic (SAC) deep reinforcement learning agent. This framework was applied to a practical high-heat-flux problem: redesigning the beam dump at the Facility for Rare Isotope Beams (FRIB) for a power upgrade from 20 kW to 50 kW. The resulting design, validated by three-dimensional conjugate heat transfer simulations, suppresses hazardous hot spots and yields a markedly more uniform temperature distribution. This provides a robust operating margin, increasing the average power-handling capability by 72% relative to the current design, demonstrating the framework’s potential to solve complex thermal management challenges in both accelerator technology and advanced nuclear systems.

Accelerator

Turbofan Engine Power Extraction Demonstration Final Report

As GE Aerospace advances toward a revolutionary step change in propulsion efficiency, the integration and demonstration of new engine architectures and technology systems are essential. The NASA Turbofan Engine Power Extraction Demonstration (PEx), conducted through the Hybrid Thermally Efficient Core (HyTEC) project, aims to develop and demonstrate megawatt-class hybrid electric capability on a modern commercial turbofan engine. The hybrid electric system is critical to meeting the needs of the U.S. aviation industry for next-generational propulsion systems with greater efficiency, durability, and range. This supports energy independence and helps ensure the security and resilience of one of America's largest export industries. The PEx project specifically targets three key objectives: mechanically integrating hybrid electric capability into a commercial turbofan engine, integrating electric machine control with turbofan control for advanced power management, and de-risking performance modeling of future hybrid electric architectures. To mature these technologies to Technology Readiness Level (TRL) 6, a series of electric power system component tests and a baseline engine performance test campaign were conducted. These efforts culminated in an integrated hybrid electric turbofan test campaign demonstrating power extraction, power insertion, and power transfer between spools. Tests of the electric power system were completed at GE Aerospace’s Electrical Power Integrated Systems Center in Dayton, Ohio and engine tests were completed at Peebles Test Operation in Peebles, Ohio. Hybrid electric trade studies extended the demonstrated capability to altitude using the validated cycle model from the PEx test campaigns, allowing for comments on expanded mission benefits not demonstrated in the ground campaign. The knowledge gained from PEx also supports GE Aerospace’s Compact Core Demonstrator as part of HyTEC Phase 2 and ultimately informs the implementation of hybrid electric systems in the next generation of GE Aerospace commercial engine products. This report provides a summary of the program background, test campaigns, trade studies, and insights into the technical maturation required to support future commercial products.

Hybrid Electric

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

Anastasia Ford

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

lunar power

Dronebase Photovoltaic (PV) Fleet Imagery Quantitative Evaluation (CRADA CRD-22-22941 Final Report)

Combine the Dronebase aerial imagery with corresponding sites in the NLR Photovoltaic (PV) Fleets database. By combining these two data sources in an aggregated, anonymized fashion, we can perform the following analyses: quantifying power loss due to outages caused by stuck trackers, string outages, and shading/snow, validate site metadata, including tilt and azimuth, and correlate.

14 SOLAR ENERGY

Americium-Fuelled Radioisotope Stirling Generator Elegant Breadboard

High power solutions for spacecraft are becoming increasingly sought after in the new era of space exploration, with energy intensive in-situ lunar surface exploration becoming a key part of the roadmap for major space agencies, as well as commercial companies. Nuclear power provides the most feasible solution to achieve continued operation through the long lunar night, and in extended periods in Permanently Shadowed Regions (PSRs). Americium-241 (241Am) is used as the fuel of choice in European Radioisotope Power Systems (RPS). The University of Leicester have developed a number of systems using this fuel type, including a 200 Wth heat source. Building on existing international partnerships, the University of Leicester is continuing to work with NASA Glenn Research Center (GRC) to maximise the electrical output that can be generated from the heat source by progressing the radioisotope-Stirling generator concept to elegant breadboard level, building on the long heritage of dynamic power conversion developments at NASA Glenn. Presented in the following conference paper is the next iteration of the Americium-fuelled Radioisotope Stirling Generator (Am-RSG) Elegant Breadboard, following on from a successful technology demonstration design conducted at NASA Glenn in early 2025. The design laid-out in this paper is a more flight-like version of the technology demonstrator, and is intended to pair with the next generation of Stirling convertor technology, the SunPower Robust Stirling Converter (SRSC). The SRSC is able to operate more efficiently at lower thermal power levels than the previous Advanced Stirling Convertor (ASC), making it more suitable for the 241Am system.

Lunar