Pulsed plasma solid propellant microthruster for the synchronous meteorological satellite. Task 4: Engineering model fabrication and test report

Two flight prototype solid propellant pulsed plasma microthruster propulsion systems for the SMS satellite were fabricated, assembled and tested. The propulsion system is a completely self contained system requiring only three electrical inputs to operate: a 29.4 volt power source, a 28 volt enable signal and a 50 millsec long command fire signal that can be applied at any rate from 50 ppm to 110 ppm. The thrust level can be varied over a range 2.2 to 1 at constant impulse bit amplitude. By controlling the duration of the 28 volt enable either steady state thrust or a series of discrete impulse bits can be generated. A new technique of capacitor charging was implemented to reduce high voltage stress on energy storage capacitors.

Guman, W. J.↗

Task 4: Lake Ice Surveillance, 1406

The author has identified the following significant results. Although it is readily recognized that there is a need for ground truth to provide adequate guidance for remote sensing data interpretation, it is noted that, in terms of radar remote sensing, this ground truth is often inadequate. It is necessary to make basic electrical and physical measurements of the surface and to some depth below it. A brief outline is presented of a ground truth scheme which uses measurements of the dielectric constant. Two portable instruments were designed specifically for this purpose; these were: (1) a Q-meter for measurement of dielectric constant and loss tangent; and (2) an instrument to measure electrical properties of the two operating frequencies of the imaging radar. Although extensive data are lacking, several general cases of radar-earth surface and interaction are described; also, examples of radar imagery and some data on ice and snow are presented. It is concluded that the next logical step is to begin to quantify the radar ground truth in preparation for machine interpretation and automatic data processing of the radar imagery.

Porcello, L. J.↗

Disposal of hypergolic propellants, phase 6 task 4. Disposal pond products

Waste monomethyl hydrazine scrubber liquor, consisting of aqueous solutions containing small amounts of CH4, Cl2, CH3Cl, CH2Cl2, and CHCl3 as well as large amounts of CH3OH is scheduled to be dumped in stabilization ponds along with nitrate and nitrite salt solutions obtained as waste liquors from the N2O4 scrubbers. The wastes are investigated as to the hazardous materials generated by such combinations of items as described as well as the finite lifetime of such materials in the stabilization ponds. The gas liquid chromatograph was used in the investigation. A series of experiments designed to convert nitrate and nitrite salts to the environmentally innocuous N2O and N2 using solar energy is reported. Results indicate that this solar conversion is feasible.

Cohenour, B. C.↗

Accelerated/abbreviated test methods of the low-cost silicon solar array project. Study 4, task 3: Encapsulation

Methods of accelerated and abbreviated testing were developed and applied to solar cell encapsulants. These encapsulants must provide protection for as long as 20 years outdoors at different locations within the United States. Consequently, encapsulants were exposed for increasing periods of time to the inherent climatic variables of temperature, humidity, and solar flux. Property changes in the encapsulants were observed. The goal was to predict long term behavior of encapsulants based upon experimental data obtained over relatively short test periods.

Kolyer, J. M.↗

Automated Array Assembly, Phase 2. Low-cost Solar Array Project, Task 4

Work was done to verify the technological readiness of a select process sequence with respect to satisfying the Low Cost Solar Array Project objectives of meeting the designated goals of $.50 per peak watt in 1986 (1975 dollars). The sequence examined consisted of: (1) 3 inches diameter as-sawn Czochralski grown 1:0:0 silicon, (2) texture etching, (3) ion implanting, (4) laser annealing, (5) screen printing of ohmic contacts and (6) sprayed anti-reflective coatings. High volume production projections were made on the selected process sequence. Automated processing and movement of hardware at high rates were conceptualized to satisfy the PROJECT's 500 MW/yr capability. A production plan was formulated with flow diagrams integrating the various processes in the cell fabrication sequence.

Lopez, M.↗

Process Development for Automated Solar Cell and Module Production. Task 4: Automated Array Assembly

A baseline sequence for the manufacture of solar cell modules was specified. Starting with silicon wafers, the process goes through damage etching, texture etching, junction formation, plasma edge etch, aluminum back surface field formation, and screen printed metallization to produce finished solar cells. The cells were then series connected on a ribbon and bonded into a finished glass tedlar module. A number of steps required additional developmental effort to verify technical and economic feasibility. These steps include texture etching, plasma edge etch, aluminum back surface field formation, array layup and interconnect, and module edge sealing and framing.

Source record↗

Evaluation and Analysis of SEASAT-A Scanning Multichannel Microwave Radiometer (SSMR) Antenna Pattern Correction (APC) Algorithm. Sub-task 4: Interim Mode T Sub B Versus Cross and Nominal Mode T Sub B

The brightness temperature data produced by the SMMR Antenna Pattern Correction algorithm are evaluated. The evaluation consists of: (1) a direct comparison of the outputs of the interim, cross, and nominal APC modes; (2) a refinement of the previously determined cos beta estimates; and (3) a comparison of the world brightness temperature (T sub B) map with actual SMMR measurements.

Kitzis, J. L.↗

Process development for automated solar cell and module production. Task 4: Automated array assembly

A process sequence which can be used in conjunction with automated equipment for the mass production of solar cell modules for terrestrial use was developed. The process sequence was then critically analyzed from a technical and economic standpoint to determine the technological readiness of certain process steps for implementation. The steps receiving analysis were: back contact metallization, automated cell array layup/interconnect, and module edge sealing. For automated layup/interconnect, both hard automation and programmable automation (using an industrial robot) were studied. The programmable automation system was then selected for actual hardware development.

Source record↗

Process Development for Automated Solar Cell and Module Production. Task 4: Automated Array Assembly

The Automated Lamination Station is mechanically complete and is currently undergoing final wiring. The high current driver and isolator boards have been completed and installed, and the main interface board is under construction. The automated vacuum chamber has had a minor redesign to increase stiffness and improve the cover open/close mechanism. Design of the Final Assembly Station has been completed and construction is underway.

Hagerty, J. J.↗

Process development for automated solar cell and module production. Task 4: Automated array assembly

Progress in the development of automated solar cell and module production is reported. The unimate robot is programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. The mechanical construction of the automated lamination station and final assembly station phases are completed and the first operational testing is underway. The final controlling program is written and optimized. The glass reinforced concrete (GRC) panels to be used for testing and deliverables are in production. Test routines are grouped together and defined to produce the final control program.

Hagerty, J. J.↗

Process development for automated solar cell and module production. Task 4: Automated array assembly

The Unimate robot was programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. Mechanical construction of the Automated Lamination Station and Final Assembly Station were completed on schedule. All final wiring and interconnect cables were also completed and the first operational testing began. The final controlling program was written. A local fabricator was contracted to produce the glass reinforced concrete panels to be used for testing and deliverables. A video tape showing all three stations in operation was produced.

Hagerty, J. J.↗