Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Ramp Technology and Intelligent Processing in Small Manufacturing

To address the issues of excessive inventories and increasing procurement lead times, the Navy is actively pursuing flexible computer integrated manufacturing (FCIM) technologies, integrated by communication networks to respond rapidly to its requirements for parts. The Rapid Acquisition of Manufactured Parts (RAMP) program, initiated in 1986, is an integral part of this effort. The RAMP program's goal is to reduce the current average production lead times experienced by the Navy's inventory control points by a factor of 90 percent. The manufacturing engineering component of the RAMP architecture utilizes an intelligent processing technology built around a knowledge-based shell provided by ICAD, Inc. Rules and data bases in the software simulate an expert manufacturing planner's knowledge of shop processes and equipment. This expert system can use Product Data Exchange using STEP (PDES) data to determine what features the required part has, what material is required to manufacture it, what machines and tools are needed, and how the part should be held (fixtured) for machining, among other factors. The program's rule base then indicates, for example, how to make each feature, in what order to make it, and to which machines on the shop floor the part should be routed for processing. This information becomes part of the shop work order. The process planning function under RAMP greatly reduces the time and effort required to complete a process plan. Since the PDES file that drives the intelligent processing is 100 percent complete and accurate to start with, the potential for costly errors is greatly diminished.

Rentz, Richard E.↗

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg↗

NASA Hybrid Thermally Efficient Core (HyTEC) Phase 2 Q3’GFY25 to Q2’GFY26 Unlimited Rights Annual Report for CLIN 1 and 2

The HyTEC Phase 2 Project focuses on the development and demonstration of high-power density, small engine core gas turbine engine technologies. The focus of HyTEC on these small engine core technologies will provide direct benefits to the next single-aisle class aircraft in terms of thermal efficiency, as well as integrate with other technologies, through increased hybridization, as they mature to provide substantial continuous fuel burn reductions during the aircraft lifecycle. These advances will strengthen the US position in the commercial aviation engine market and enable cost benefits in commercial aviation. In Government fiscal year 26 the HyTEC Project was closed and contract moved to the Subsonic Vehicle Technologies and Tools Project. GE Aerospace is executing two major work plans as part of the HyTEC Phase 2 contract. The first is Contract Line-Item Number (CLIN) 001 and its objective is to mature High Pressure Turbine (HPT) aerodynamics technology to TRL 5 through multiple rigs so that it may be incorporated into a complete TRL 6 evaluation and unlock learnings for the engine core demonstration as applicable. CLIN 002, the second work plan, is to design, procure and test a cost shared portion of technologies on the TRL6 Compact Core test vehicle. The compact core demonstrated through HyTEC Phase 2 along with the HPT rig TRL advancement directly matures the technologies being developed as part of the CFM RISE demonstrator program which is targeting a more than 20% fuel burn reduction at the engine level versus today’s state of the art. The RISE program’s objective is to advance both the novel Open Fan architecture, compact core technologies and advanced systems such as hybrid electric needed to achieve the desired fuel burn reduction to TRL6 ahead of a new product introduction in the single-aisle class aircraft in the 2030s timeframe.

gas turbine engine↗

Enhancing orbital servicing operations: Providing positive and effective management of spare and installed hardware - A case study of the Hubble Space Telescope

The Satellite Resources Management and Tracking System was developed specifically for the Hubble Space Telescope (HST) program, and now, NASA has the ability to immediately access the necessary data for planning successful orbital satellite servicing operations. This system is an online, real-time data base system that contains a plethora of data on each item identified to support the HST throughout its planned 15 year life. Some of the information provided includes the current status, location, quantity, and history of each asset, a separate record for each discrete serial numbered item, procurement lead times on items sensitive to technology obsolescence, and the maintenance and repair history of each asset. Finally, details are provided on organizational, operational and logistics requirements.

Randolph, Joseph L.↗

Advanced Electric Propulsion System (AEPS) Enabling a Sustainable Return to the Lunar Surface through NASA Gateway

NASA continues to evolve a human exploration approach for beyond low-Earth orbit. The center of this approach is NASA’s Gateway that is envisioned to provide a maneuverable outpost in lunar orbit to extend human presence in deep space and expand on NASA exploration goals. The Gateway represents the initial step in NASA’s architecture for human cislunar operations, lunar surface access and missions to Mars. NASA announced at the May 2020 NASA Advisory Council’s Human Explorations and Operations Committee a new plan that calls for launching the first two elements of Gateway as a co-manifested mission in the late 2023 timeframe [2]. Launching the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) together reduces mission risk, utilizes the PPE high-powered Electric Propulsion (EP) system to transport both elements to the lunar orbit, and reduces overall cost. NASA and Maxar Technologies have a commercial partnership to develop and demonstration a high-powered Solar Electric Propulsion (SEP) spacecraft [3, 4]. The PPE is baselined to include three 12.5-kW Advanced Electric Propulsion Systems (AEPS) and four 6-kW Hall thrusters, currently under development by Maxar, for a total beginning of life propulsion power of over 48-kW [5]. High-power solar electric propulsion is one of the key technologies that has been prioritized because of its significant exploration benefits, specifically, for missions beyond low Earth orbit. Spacecraft size and mass are currently dominated by onboard chemical propulsion systems and propellants that may constitute more than 50 percent of spacecraft mass. This impact can be substantially reduced through the utilization of SEP, due to its higher specific impulse and lower propellant load required to meet the equivalent mission delta-V. Studies performed for NASA’s HEOMD and Science Mission Directorate (SMD) have demonstrated that 40-kW-class SEP provides the necessary capabilities that would enable near term and future architectures, and science missions [6]. Accordingly, NASA has been developing a 12 kW Hall thruster electric propulsion thruster that can serve as the building block for a 40-kW-class SEP capability. The AEPS development, led by the NASA Glenn Research Center (GRC) and the Jet Propulsion Laboratory (JPL), began with the maturation of the high-power Hall thruster. The technology development work has transitioned to AR via a competitive procurement selection for the AEPS contract in May 2016. Management of the AEPS contract is being led by NASA GRC with funding from NASA’s Science Technology Mission Directorate (STMD) under the Technology Demonstration Missions (TDM) program. NASA continues to support the AEPS development leveraging in-house expertise, plasma modeling capability, and world-class test facilities.

AEPS↗

Technology Drives Exploration: How NASA Is Embracing Additive Manufacturing

NASA has over 60 years of technology development that enabled human space and space science exploration “for the benefit of all humankind”. This presentation will start with the overview of NASA’s organization structure; the roles NASA’s leadership plays as well as 10 regional centers’ focused areas and capabilities. It will also highlight NASA’s Mission Directorates –Science, Human, Aeronautics, and Technology. With the onset of the newer and still evolving procurement business model (NASA being a buyer, instead of maker), a question remains: which is the right framework under which NASA can best integrate the capabilities of commercial, international, and other US government entities into a coherent exploration strategy? Another critical consideration is identifying which critical technologies to invest in NASA and which capabilities are better suited for commercialization as NASA as a buyer. Additive Manufacturing (AM) is certainly changing the space industry and providing new opportunities to travel to low earth orbit and explore our universe. New design opportunities –not previously possible –for new high performance metal alloys, light-weighting, managing thermal, structural, and dynamic loads are being enabled by AM. This presentation will showcase the vast portfolio of NASA’s AM activities in the last 13 years; transportation from Earth to Destination, Habitat at Destination, Lander from Station to Surface, and Science mission spacecrafts. NASA’s technical excellence is being leveraged heavily in the AM and Commercial Space community through collaborative projects, partnership agreements, tech transfer program. Examples of challenges of AM implementation as well as opportunities will be discussed.

Alison Park↗

The establishment of a production-ready manufacturing process utilizing thin silicon substrates for solar cells

Three inch diameter Czochralski silicon substrates sliced directly to 5 mil, 8 mil, and 27 mil thicknesses with wire saw techniques were procured. Processing sequences incorporating either diffusion or ion implantation technologies were employed to produce n+p or n+pp+ solar cell structures. These cells were evaluated for performance, ease of fabrication, and cost effectiveness. It was determined that the use of 7 mil or even 4 mil wafers would provide near term cost reductions for solar cell manufacturers.

Pryor, R. A.↗

Prototype Regional Observation and Forecast System (PROFS)

The prototype regional observation and forecast system (PROFS) outputs are demonstrated, functional design specifications to be used to procure and implement operational systems are outlined. Advanced candidate technologies are evaluated as an integral part of the process that leads to these outputs. Evaluation insures that future weather service systems will contain the optimum mix of technologies to be most cost effective in reducing the annual losses and deaths that are directly attributed to severe weather.

Hinkelman, J. W., Jr.↗

Performance features of 22-cell, 19Ah single pressure vessel nickel hydrogen battery

Two 22-cells 19Ah Nickel-Hydrogen (Ni-H2) Single Pressure Vessel (SPV) Qual batteries, one each from EPI/Joplin and EPI/Butler, were designed and procured. The two batteries differ in the cell encapsulation technology, stack preload, and activation procedure. Both the Butler and Joplin batteries met the specified requirements when subjected to qualification testing and completed 2100 and 1300 LEO cycles respectively, with nominal performance. This paper discusses advantages, design features, testing procedures, and results of the two single pressure vessel Ni-H2 batteries.

Rao, Gopalakrishna M.↗

Strategies for SEE Hardness Assurance - From Buy-It-And-Fly-It to Bullet Proof

This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risks or worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.

commercial-off-the-shelf (COTS)↗

Strategies for SEE Hardness Assurance From Buy-It-And-Fly-It to Bullet Proof

This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risksor worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.

commercial-off-the-shelf (COTS)↗

The New Millennium Program: Fast-Track Procurements

The National Aeronautics and Space Administration's (NASA'a) New Millennium Program (NMP) has embarked on a technology flight-validation demonstration program to enable the kinds of missions that NASA envisions for the 21st century. Embedded in the program is the concept of rapid mission development supported by a fast-track procurement process.

New↗

Interleaved arrays antenna technology development

Phase one and two of a program to further develop and investigate advanced graphite epoxy waveguides, radiators, and components with application to space antennas are discussed. The objective of the two phases were to demonstrate mechanical integrity of a small panel of radiators and parts procured under a previous contract and to develop alternate designs and applications of the technology. Most of the emphasis was on the assembly and test of a 5 x 5 element module. This effort was supported by evaluation of adhesives and waveguide joint configurations. The evaluation and final assembly considered not only mechanical performance but also producibility in large scale.

Source record↗

Materials data handbook on titanium 6Al-4V

Handbook has been prepared which describes latest property information on titanium 6Al-4V. Scope of information presented includes physical- and mechanical-property data at cryogenic, ambient, and elevated temperatures, supplemented with useful information in such areas as material procurement,metallurgy of alloy, corrosion, environmental effects, fabrication, and joining technology.

Muraca, R. F.↗

Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

Su, Ching-Hua↗

Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an update flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

Cushman, Paula P.↗

Mod II engine and technology development

The second-generation automotive Stirling engine, known as the Mod II, will be used to accomplish the Automotive Stirling Engine (ASE) Program objectives. Preliminary design has advanced to the point of procuring long-lead components to evaluate manufacturability. The heater head castings of the Hot Engine System (working gas cycle) are being procured, while the V-block casting of the Cold Engine/Drive system is being sectioned for evaluation. The technology required for these designs, and their impact on Mod II performance, have progressed to the design substantiation stage, and successful accomplishment of the program objectives is expected.

Ernst, W. D.↗