Search NASA⌕ Search

SEARCH · Search NASA

Results for “test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Viking Mars lander 1975 dynamic test model/orbiter developmental test model forced vibration test

The Viking Mars Lander 1975 dynamic test model and orbiter developmental test model were subjected to forced vibration sine tests. Flight acceptance (FA) and type approval (TA) test levels were applied to the spacecraft structure in a longitudinal test configuration using a 133,440-N (30,000-lb) force shaker. Testing in the two lateral axes (X, Y) was performed at lower levels using four 667-N (150-lb) force shakers. Forced vibration qualification (TA) test levels were successfully imposed on the spacecraft at frequencies down to 10 Hz. Measured responses showed the same character as analytical predictions, and correlation was reasonably good. Because of control system test tolerances, orbiter primary structure generally did not reach the design load limits attained in earlier static testing. A post-test examination of critical orbiter structure disclosed no apparent damage to the structure as a result of the test environment.

Fortenberry, J.↗

Preliminary Cryogenic Cold Test Results of the First 9-Cell LSF Shape Cavity

Following successful prototyping and testing of single- & 5-cell LSF shape cavities *, **, the first 9-cell LSF shape cavity LSF9-1 was successfully constructed using an innovative process at JLab with the in-house facilities. The cavity was then shipped to KEK for post-fabrication mechanical adjustment and ILC TDR style treatment and surface processing. Cold testing was carried out at the JLab VTA facility, instrumented with a suite of Kyoto instruments. Favorable values for the bath pressure detuning sensitivity and Lorentz force detuning coefficient were experimentally measured, validating the design improvement in cell stiffeners. Pass-band measurements indicate 4 out of 9 cells reaching gradient capability of > 45 MV/m, including 2 cells reaching 51 MV/m. Cornell OST detectors identified the cell and location responsible for the current hard quench limit. Multipacting-like barriers observed in end cells are investigated both analytically and numerically. The cavity was shipped to FNAL and received a light EP at the joint ANL/FNAL facility for further cold testing at Jlab. Two new 9-cell LSF cavities are being constructed including one made of large-grain niobium material.

43 PARTICLE ACCELERATORS↗

NASA-STD-7012 Leak Test Requirements: Potential Reference for ASNT Nondestructive Testing Handbook for Leak Testing

Developed in 2018-2019, NASA-STD-7012 Leak Test Requirements, has been drafted based mostly on the NASA technical requirement documents applicable to the International Space Station (ISS) hardware and payloads that were developed over the years taking into consideration many known references such as Leakage Testing Handbook prepared by General Electric for the Jet Propulsion Laboratory, the ASTM International standards for leak testing, and last, but not least, the ASNT Nondestructive Testing Handbook for Leak Testing. Thus, NASA-STD-7012 has a reference to the above-mentioned handbook in the leak test method/technique descriptions. However, there are some technical details that are described differently in NASA standard and ASNT Handbook. Those technical details are mostly related to the classification of the leak test methods/techniques, and also to tracer gas to working fluid (gas or liquid) leakage rate conversion methodology, and to some definitions used in the text of both NASA standard and ASNT Handbook. Those differences are going to be briefly described in this paper to let ASNT leak test experts decide if they want to refer to NASA-STD-7012 while working on the next edition of the ASNT Handbook, Volume 2 for Leak Testing.

Lvovsky, Oleg M.↗

Integration Test and Evaluation (IT&E) Flight Test Series 6 Live Virtual Constructive - Distributed Environment (LVC-DE) Test Report

The goals of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) (also UAS-NAS) Project are to reduce the barriers for UAS access and its integration into the NAS. The UAS-NAS project and industry stakeholders conducted a series of flight tests integrating technologies from the Modeling & Simulation (M&S), Human Systems Integration (HSI), and Communication and Control (C2), and Integration, Test & Evaluation (IT&E) research areas. The last of the flight test series, Flight Test Series 6 (FT6) was conducted in late 2019 and focused on evaluating the interaction of the airborne non-cooperative surveillance system and the Detect and Avoid (DAA) technology. The DAA system generated conflict alert and guidance for pilots using a Research Ground Control System (RGCS) to avoid intruder aircraft. The conflict alerting and guidance information was presented on the RGCS’s display using symbology developed by the human factors team. The objective of FT6 was to investigate the interoperability of Low Size, Weight, and Power (Low SWaP) sensors with the DAA alerting, guidance, and display requirements. To support this goal, the distributed test environments (DTE) were developed at Ames Research Center (ARC) and Armstrong Flight Research Center (AFRC) and securely linked over a Virtual Private Network (VPN). These environments took advantage of existing Live Virtual Constructive (LVC) technologies to support research observation at both Centers with the insertion of live UAS and manned intruder aircraft into a simulated NAS environment with Air Traffic Control (ATC) and constructive manned aircraft. The experiment was distributed between AFRC flight operations and research facilities and the Distributed Simulation Research Laboratory (DSRL) and Software Development Laboratory (SDL) in building N243 at ARC. The Air Traffic Controller and pseudo pilots operated from the DSRL and SDL, respectively, using the Multi-Aircraft Control System (MACS). The test subject and researchers operated from the Research Ground Control Station (RGCS) at AFRC using the Vigilant Spirit Control Station (VSCS) and associated DAA software and displays. Flight Operation for the unmanned aircraft (UA) and manned intruder traffic was conducted at AFRC. Virtual traffic was managed by ARC. Voice distribution was accomplished using a combination of disparate communication systems at ARC and AFRC. The purpose of this document is to record the development, design, and execution of activities in support of the FT6 efforts from the perspective of the ARC IT&E team. Furthermore, the Armstrong IT&E team has published a thorough FT6 Test Report, with emphasis on flight test support, facilities and vehicle development; this report complements the Armstrong report. Analysis of collected FT6 data will be conducted and reported by the M&S and HSI teams and will be published in separate reports.

UAS-NAS↗

Test Results of the CERN HL-LHC low- Quadrupole Short Models MQXFS3c and MQXFS4

For the High Luminosity Upgrade of the CERN Large Hadron Collider, lower * quadrupole magnets based on advanced Nb3Sn conductors will be installed on each side of the ATLAS and CMS experiment insertion zones. As part of the technological developments needed to achieve the required field gradient of 132.6 T/m within a 150-mm aperture, short length model magnets, named MQXFS, are tested both at the CERN SM18 and FERMI Lab test facilities. The model magnets rely on two types of Nb3Sn conductors (RRP and PIT) and on an innovative bladders and keys design to provide mechanical support against the Lorentz forces. In 2016 and 2017, the powering tests of the first two models MQXFS3 (RRP) and MQXFS5 (PIT) proved that nominal performance (16.5 kA) could be reached with excellent memory of the quench current after thermal cycle. However both magnets showed a slow training behavior with clear observations of voltage disturbances before the quench. Besides MQXFS5 only could reach ultimate current (17.9 kA) whereas erratic behavior was observed on MQXFS3 due to conductor local degradation at the head of one of the coil. In 2018, this limiting coil was changed and the applied azimuthal pre-stress increased. If ultimate current could then be reached, no stable current could be maintained due to identified defect on the outer layer of the new coil. Finally the outcome of the test of the new model MQXFS4, featuring the final RRP conductors that will be used for the series production and variation on the inner layer quench heater designs are here reported in details.

43 PARTICLE ACCELERATORS↗

Viking 1975 Orbiter Development Test Model/Lander Dynamic Test Model - Dynamic environmental testing

An overview is presented of the dynamic environmental test program for the Viking 1975 Orbiter Development Test Model/Lander Dynamic Test Model. The spacecraft and its systems are described, and the test methods are discussed in detail. Tests described include the modal survey, the forced-vibration test, and the acoustic test. It is shown that the modal testing provided a good correlation with analytical predictions and that all the major structural loads were found to be below 50 Hz.

Milder, G.↗

Space Shuttle solid rocket motor testing for return to flight - Transient Pressure Test Article test program

The Transient Pressure Test Article (TPTA) test program, which is being conducted at a new facility at NASA-Marshall, is described. The facility is designed to test and verify the sealing capability of the redesigned solid rocket motor's (RSRM) field, igniter, and nozzle joints. The test article consists of full-scale RSRM hardware loaded with inert propellant and assembled in a short stack configuration. The test facility is described as well as test implementation, test effectiveness, and test results.

Vibbart, Charles M.↗

Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

Salinas, Michael↗

Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

Salinas, Michael J.↗

WEC-SIM Phase 1 Validation Testing -- Numerical Modeling of Experiments: Preprint

The Wave Energy Converter Simulator (WEC-Sim) is an open-source code jointly developed by Sandia National Laboratories and the National Renewable Energy Laboratory. It is used to model wave energy converters subjected to operational and extreme waves. In order for the WEC-Sim code to be beneficial to the wave energy community, code verification and physical model validation is necessary. This paper describes numerical modeling of the wave tank testing for the 1:33-scale experimental testing of the floating oscillating surge wave energy converter. The comparison between WEC-Sim and the Phase 1 experimental data set serves as code validation. This paper is a follow-up to the WEC-Sim paper on experimental testing, and describes the WEC-Sim numerical simulations for the floating oscillating surge wave energy converter.

16 TIDAL AND WAVE POWER↗

Formal Functional Test Designs: Bridging the Gap Between Test Requirements and Test Specifications

This presentation describes the testing life cycle, the purpose of the test design phase, and test design methods and gives an example application. Also included is a description of Test Representation Language (TRL), a summary of the language, and an example of an application of TRL. A sample test requirement and sample test design are included.

testing life cycle test design test requirements T↗

Design, Fabrication and Start-up of Test Facilities for the LAWPS Full-Scale IX Column Test and Engineering Scale Test - 17418

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003-02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM Team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Both test platforms underwent shakedown and start-up testing in August 2016 and moved into actual testing and NQA-1 data generation shortly thereafter. This paper covers the engineering design, procurement, construction, installation, and acceptance testing of the test platforms (which are now operational) under an aggressive fast track schedule, and initial test data as available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Assembly 30 cm Drop Test

Can Spent Nuclear Fuel withstand the shocks and vibrations experienced during normal conditions of transport? This question was the motivation for the multi-modal transportation test (MMTT) (Summer 2017), 1/3-scale cask 30 cm drop test (December 2018), and full-scale assembly 30 cm drop tests (June 2019). The full-scale ENSA ENUN 32P cask with 3 surrogate 17x17 PWR assemblies was used in the MMTT. The 1/3-scale cask was a mockup of this cask. The 30 cm drop tests provided the accelerations on the 1/3-scale dummy assemblies. These data were used to design full-scale assembly drop tests with the goal to quantify the strain fuel rods experience inside a cask when dropped from a height of 30 cm. The drop tests were first done with the dummy and then with the surrogate assembly. This paper presents the preliminary results of the tests.

Transportation↗

Viking 1975 Orbiter Development Test Model/Lander Dynamic Test Model dynamic environmental testing - An overview

The current work presents an overview of the Viking 1975 environmental testing from an engineering standpoint. An extremely large vibration test fixture had to be designed, analyzed, and integrated into a test setup that employed hydrostatic bearings in a new fashion. A vibration control system was also required that would allow for thirty-six channels of sine-wave peak select control from acceleration, force-of-strain transducers. In addition, some 68 channels of peak limiting shutdown capability were needed for backup and monitoring of other data during the forced vibration test. Pretesting included analyses of the fixture design, overturning moment, control system capabilities, and response of the entire spacecraft/fixture/exciter system to the test environment. Closed-loop control for acoustic testing was a necessity due to the fact that the Viking spacecraft took up a major portion of the volume of the 10,000 cu ft chamber. The spacecraft emerged from testing undamaged.

Milder, G.↗

Integrated Test and Evaluation Flight Test 3 Flight Test Plan

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

Unmanned↗

Buckling Test and Analysis of the 8-foot-diameter Sandwich Composite Cylinder Test Article CTA8.3 as Part of the Shell Buckling Knockdown Factor Project: Test Dates 16~19 December 2019

This report describes work that is part of SBKF-the test and analysis results from the third SBKF cylindrical sandwich composite test article, which was designated SBKF-P3-CYL-CTA8.3. This test was the third in a series of tests on sandwich composite cylinders that can be used to experimentally validate analysis methods, which in turn can be used to develop analysis-based shell buckling design guidelines for sandwich composite launch-vehicle cylindrical structures. The primary objectives of this test were to interrogate the structural capability of the composite test article, and to verify the test-article design and analysis approach for cylinders subjected to axial compression and combined compression and bending loads.

Sandwich composite cylinder↗